Roads to Prosperity Program Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018 Part A Surge Part B GARVEE 1 Turnpike 1 GO Bond 1 PART B GARVEE 2 3.3 B +/- Roads to Prosperity Dashboard Summer RECAP Over


  1. Roads to Prosperity Program Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018

  2. Part A Surge Part B GARVEE 1 Turnpike 1 GO Bond 1 PART B GARVEE 2

  3. 3.3 B +/-

  4. Roads to Prosperity Dashboard

  5. Summer RECAP Over $350 PART A SURGE - $30 M Million PART B - $60 M Additional in 8 months GARVEE 1 - $260 M

  6. NOV ‘17 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘18 JUN ‘19 GO 1 PART B 4 PART B 3 $800 M $85 M $70 M GARVEE 2 Turnpike GO 2 $103 M 1 $400 M $133 M

  7. NOV ‘17 APR ‘18 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘19 PART B 3 $70 M

  8. NOV ‘17 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘18 JUN ‘19 GARVEE 2 $103 M County District Project Work Estimated Cost County District Project Work Estimated Cost Barbour 7 JUNIOR W-BEAM Replace $4,160,000 Marshall 6 Expressway Drainage Repair - WV 2 MP 16.90 Slip lining $38,500 Berkeley 5 ROCK CLIFF DRIVE Replace Bridge $4,536,000 Marshall 6 Expressway Drainage Repair - WV 2 MP 16.96 Slip lining $38,500 Berkeley 5 JOHNSONTOWN BRG. Replace Bridge $856,000 Marshall 6 Expressway Drainage Repair - WV 2 MP 17.02 Slip lining $38,500 Braxton 7 Expressway Drainage Rehab - Rte 79 Replace/ CULVERTS $130,000 Mason 1 TICKVILLE BRIDGE Superstructure Replacement $1,722,600 Braxton 7 TAGUE W-BEAM BRIDGE + 1 Replace Bridge (includes Match Line Bridge) $3,684,000 Monogalia Braxton 4 7 WV Slide (Morrison Ridge) Airport Exit Bridge Major Rehab Repair slide along WV 15 at MP 5.70 $6,300,000 $900,000 Brooke 6 Harmon Creek Bridge Replace Bridge $9,800,000 Ohio 6 Chapel Road Bridge Deck & Rehab $2,520,000 Cabell 2 Expressway Drainage Rehab - US 52 Slip Line $100,000 Ohio 6 Spruce Street Bridge Deck & Rehab $1,610,000 Greenbrier 9 Expressway Drainage Rehab- Sam Black Church-Alta Rd Slip line $590,000 Pendelton 8 BRUSHY RUN BRIDGE Replace $1,176,000 Greenbrier 9 ANTHONY CREEK BRIDGE Deck and C&P Superstructure $1,366,200 Preston 4 Expressway Drainage Rehab - I-68 MP 21.50 (GLADE RUN) Replace Concrete Invert $800,000 Greenbrier 9 CULVERSON CREEK BRIDGE Replacement $1,425,000 Preston 4 Expressway Drainage Rehab - I-68 MP 19.11 LAUREL RUN Replace Concrete Invert $650,000 Hampshire 5 Sedan Bridge Replace Bridge $3,470,000 Harrison Putnam 3 4 Expressway Drainage Rehab - US 50 Bear Track Run McClanahan Bridge +1 Bridge Replacement Install Concrete Invert $2,407,000 $550,000 Harrison 4 Expressway Drainage Rehab - I-79 MP 114.13 (CHUB RUN) Install Concrete Invert $450,000 Raleigh 10 Expressway Drainage Rehab-Prince Hill Road Slip line multiple locations $445,000 Harrison 4 US Navy Petty Officer 1st Class Kevin S Rux Memorial Bridge Major Rehab $5,155,000 Raleigh 10 Expressway Drainage Rehab - I-64 MP 123.60 BEAVER CK Remove&replace pipe $500,000 Harrison 4 CAMDEN STREET BRIDGE Superstructure Replacement $1,209,000 Raleigh 10 Expressway Drainage Rehab - I-64 MP 129.10 GRAND VIEW Remove&replace pipe $545,000 Jackson 3 Expressway Drainage Rehab - I-77 Pond Creek Replace inlets; bore and jack pipe $325,000 Randolph 8 Expressway Drainage Rehab - Corr H MP 30.23 Slip line multiple locations $962,000 Jackson 3 Expressway Drainage Rehab - I-77 Medina Replace NB drainage with 30" bore and jack pipe; add wingwalls $250,000 Ritchie 3 DYE BRIDGE (SCDA) Replace $1,488,960 Jackson 3 Expressway Drainage Rehab - I-77 Wilding Replace drainage structure w/ bore & jackpipe $350,000 Roane 3 Expressway Drainage Rehab - Amma Slip line; replace gutters/inletsl $276,000 Jefferson 5 Expressway Drainage Rehab - US 340 Bore and Jack replacement culvert $300,000 Roane 3 CICERONE BRIDGE (CSWB) Bridge Replacement $1,450,000 Kanawha 1 I-77 Tom Williams Family Bridge+3 Deck Replacement/ Rehab (includes I-64 Danner, I-77 Westmoreland & I-77 Cora St) $29,080,000 Upshur 7 Expressway Drainage Rehab - Rte 33 MP 11.11 Slip Line MULTIPLE LOCATIONS $900,000 Kanawha 1 Expressway Drainage Rehab - Montrose Dr-Oakwood Rd Site +1 Repair/replace "flue" pipes & inlets (includes Greenbrier-Leon Sullivan) $2,700,000 Wayne 2 Expressway Drainage Rehab - I-64 Slip Line $175,000 Lewis 7 HARDEE'S W-BEAM Bridge Replacement $2,160,000 Wood 3 Expressway Drainage Rehab (DISTRICTWIDE) - Inlet/Grate Repair Replace 200 inlets grates; 20 inlet mods; 20 inlet replacements $290,000 Logan 2 Expressway Drainage Rehab - US 119 MP 16.32 Slip Line $150,000 Wood 3 RACE TRACK BRIDGE (CSWB) Replace $2,352,000 Logan 2 Expressway Drainage Rehab - US 119 MP 15.95 Slip Line $150,000 Wood 3 Expressway Drainage Rehab - I-77 Williamstown Replace median inlets; bore and jack pipe $325,000 Marion 4 Expressway Drainage Rehab - I-79 MP 133.80 Install Liner $700,000

  9. NOV ‘17 APR ‘18 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘19 GO 1 $800 M County District Project Work Estimated Cost Berkeley 5 I-81 Widening Widen I-81 MP 8 to MP 12 $75,000,000 I-64 Widening-Barboursville to East Mall Road Construct 2 miles of additional lane in both directions Cabell 2 $65,000,000 including Mall Road O/P Bridge for an 8-lane section between I/Cs Lewis 7 I-79 Exit 99 Interchange Rebuild SB Exit and Install Lighting $16,000,000 Mileground - Cheat Rd - Donna Ave (existing Monongalia 4 US 119 $14,000,000 roundabout to Airport) - widen Ohio 6 I-70 Bridge Rehabilitation/Renovation Major Rehab and Replace $172,500,000 Pave 14 miles of US 35 currently under a Grade and Putnam 1 US 35 Paving and Interchange $93,140,000 Drain project including a new I/C near Buffalo Bridge Widen I-64 from US 35 to Nitro including new bridge Putnam 1 I-64 Widening $170,000,000 across Kanawha River Raleigh 10 I-77/ I-64 Widening at Beckley Widen I-77/ I-64 from MP 40.3 to MP 47.6 $60,000,000 Tucker 8 Corridor H - US 219 Connector to WV 72 I/C Acquire r/w and Construct 4 lane Corridor H $144,400,000 Wyoming 10 Coalfields Expressway Paving Pave Coalfields Expressway grade and drain project $56,000,000

  10. NOV ‘17 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘18 JUN ‘19 TURNPIKE 1 $133 M County District Project Estimated Cost Mercer 10 King Coal Highway-WV 123 Airport Road (Mercer Co.) to John Nash Blvd $50,000,000 Various 10 WV 10 Operational Improvements (Kegley-Lacoma) $83,000,000

  11. NOV ‘17 APR ‘18 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘19 PART B 4 $85 M

  12. NOV ‘17 APR ‘18 MAY ‘18 MAY ‘18 JUN ‘18 JUN ‘19 GO 2 $400 M County District Project Work Estimated Cost Widen WV 51 from I-81 I/C to WV 51/US 11 I/S Berkeley 5 WV 51 Widening $23,500,000 (Inwood Bypass) Construct 2 miles of additional lane in both directions Cabell 2 I-64 Widening-29th Street to Barboursville $80,000,000 for an 6-lane section between I/Cs Hancock 6 New Cumberland Relocate and widen WV-2 through New Cumberland $11,000,000 Acquire r/w and Construct 4-lane highway between Jefferson 5 US 340 Widening Charles Town - VA Line $50,000,000 Charles Town to Rippon Marshall 6 WV 2 Widening - Kent to Franklin Widen WV 2 to 4-lanes $30,000,000 King Coal Highway-Horsepen Mountain to Construct 4-lane highway including Gilbert Creek Mingo 2 $40,000,000 Gilbert Creek Connector Wetzel 6 WV 2 Widening Widen to four lanes from Proctor to Kent $80,000,000

  13. Regular Program

  14. Roads to Prosperity Program Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.