riddle design All Saints and Ascension Parish Concept Presentation To the Assembled Congregations Sanctuary 4 March 2018 ` High Priorities Handicap Accessible Provide drop off at entry Restroom at all levels Provide covered


  1. riddle design All Saints and Ascension Parish Concept Presentation To the Assembled Congregations Sanctuary 4 March 2018 `

  2. High Priorities • Handicap Accessible • Provide drop off at entry Restroom at all levels • Provide covered • Make the entire drop off facility Accessible • Additional Front Entry • Possibly buy house Handicap parking across street • Improved kitchen • Add pew cushions functionality Priorities were set in a meeting on 15 October 2017 `

  3. Medium Priorities • Make worship space • Bigger Sacristy flexible • Sunday School • Parish Hall for 250 Spaces • Energy efficiency • Building security Parish Hall • Bigger Kitchen with • More Storage serving line • Larger, more efficient offices Priorities were set in a meeting on 15 October 2017 `

  4. Low Priorities • Improved and • Building technology (sound and separate food pantry space projection) • Outreach center • Ability to darken rooms with Baptismal Font • Immersion projection baptismal font • Add religious • Widen artifacts – stained sidewalk/improve glass access from street Priorities were set in a meeting on 15 October 2017 `

  5. Site Plan Improvements Lucas and Hunt Road • Parking closer to Worship • Sidewalk away from Street Groveland Drive Florian Avenue • ADA Accessibility • Drop Off close to Parking • Possible covered drop off access `

  6. First Floor Plan Improvements • Restrooms on same floor as worship • Elevator linking both levels Office Sanctuary • Safe second exit from Office sanctuary • Sacristy moved from Sacristy renovated Sanctuary • Enlarged Narthex T Narthex T `

  7. Lower Level Floor Plan Improvements • Parish Hall seating for 120 T T • Improved Kitchen • Larger Food Pantry • Improved Entry Parish Hall Office • Elevator Access Kitchen • Storage Food Pantry Mech Storage `

  8. Cost Opinion – Project Cost • Parking and Sidewalks $132,000 • Renovation $264,000 • Addition $450,000 • FF&E $124,600 Kitchen • Project Costs $84,600 • Contingency (15%) $152,280 • Total Proposed Budget $1,167,480 `

  9. Next Steps • Vestry Approval • Schematic Design • Design Development • Cost Confirmation • Construction Documents Problems • Bidding • Construction `

  10. Discussion • Questions • Comments • Queries `

  11. Closing `

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend