CONCEPT MASTER PLAN PARISH OUTREACH
1 2 3 4 5 6 7 8
Minimum Req. Parking = 50 Existing On Site = 61
HOLY FAMILY CONCEPT MASTER PLAN PARISH OUTREACH Minimum Req. - - PDF document
1/17/2018 HOLY FAMILY CONCEPT MASTER PLAN PARISH OUTREACH Minimum Req. Parking = 50 Existing On Site = 61 2 1 3 6 4 5 8 7 1 1/17/2018 PROCESS AND OUTREACH Bubble Diagrams Concept and Cost Images and Vision PARISH OFFICE BUILDING
1/17/2018 1
CONCEPT MASTER PLAN PARISH OUTREACH
1 2 3 4 5 6 7 8
Minimum Req. Parking = 50 Existing On Site = 61
1/17/2018 2
PROCESS AND OUTREACH
Bubble Diagrams Concept and Cost Images and Vision
PARISH OFFICE BUILDING
48.33
1/17/2018 3
PARISH HOUSE #1
60.56
GYMNASIUM
45.56
1/17/2018 4
SCHOOL PHASE 1
57.78
SCHOOL PHASE 2
58.33
1/17/2018 5
PORTABLE CLASSROOMS
84.38
CHURCH
97.78
1/17/2018 6
RECTORY
83.13
SUMMARY
Parish Office Rental House Gym Building School Phase 1 School Phase 2 Portable Classrooms Church Rectory
1/17/2018 7
POTENTIAL ISSUES TO SOLVE
structural problems and it certainly has Code and ADA issues. Most of the skylights have failed.
cafeteria is used as the parish hall but it requires parishioners to cross the street to socialize. The parish needs a parish hall.
blend in with the adjacent residential buildings. It is impossible to manage events in the Church from the existing office building.
CONCEPTUAL IDEAS #1
Repair Existing Gym
1/17/2018 8
CONCEPTUAL IDEAS #2
Parish Hall and Office Maintain Play Field
CONCEPTUAL IDEAS #3
Parish Hall and Office New Gym School Addition Parking
Demo Portables
Pk.
1/17/2018 9
CONCEPTUAL IDEAS #4
Parish Hall and Office New Gym School Addition Pk. Parking Resid.
Link to Online survey: https://www.surveymonkey.com/r/57597B6