Richard Grohn, P Tech (Eng), President 25 + years in Production and - - PowerPoint PPT Presentation

richard grohn p tech eng president
SMART_READER_LITE
LIVE PREVIEW

Richard Grohn, P Tech (Eng), President 25 + years in Production and - - PowerPoint PPT Presentation

Richard Grohn, P Tech (Eng), President 25 + years in Production and Production Engineering, specializing in artificial lift and well optimization Canada and International Terry Allen, CET, Operations Manager 30+ years in Production Operations,


slide-1
SLIDE 1

Richard Grohn, P Tech (Eng), President

25 + years in Production and Production Engineering, specializing in artificial lift and well optimization Canada and International

Terry Allen, CET, Operations Manager

30+ years in Production Operations, Gas & Plunger Lift service and well flow optimization Canada and International

slide-2
SLIDE 2
  • GLift started in 2016, 100 % Canadian private entity, locally owned
  • Service includes Gas Lift, GAPL (gas assisted plunger lift) and conventional

plunger lift evaluation - design, supply, installation, optimization and maintenance servicing for all applications

  • Providing premium gas lift services in Western Canada
  • Canada’s only mobile gas lift service unit to ensure valve setting accuracy

and installation success

  • GLift is unique and flexible to ensure project success with expertise and

dedication from project scope to production optimization

slide-3
SLIDE 3

Why Gas Lift?

HZ drilled multi-well pads, gas lift is best option A/L applications in the Montney and Duvernay are ideal

Avoid Rod Pumping Issues due to high wellbore deviation: Other Rod Pump Challenges: gas interference, debris handling, casing wear due to unanchored tubing Over capitalization, rod buckling and extreme tubing wear

slide-4
SLIDE 4

GLift Provides Free Gas Lift Evaluation, Design and Flow Modeling

slide-5
SLIDE 5

Critical Lift Rate = 750 mcfd Start of Gas Lift Qinj = 425 mcfd

CGR = 158, WGR = 77 (bbl/mmcf)

Recent Project Activity

NW AB Montney Well with Gas Lift Deployment – GLift Optimized (Decline Reversed)

slide-6
SLIDE 6

NW AB Montney Well with Gas Lift Deployment – GLift Optimized (Decline Reversed)

Critical Lift Rate = 1250 mcfd Start of Gas Lift

CGR = 52, WGR = 136 (bbl/mmcf)

Recent Project Activity

slide-7
SLIDE 7

NW AB Montney Well with Gas Lift Deployment – GLift Optimized (Decline Reversed)

Critical Lift Rate = 750 mcfd Start of Gas Lift

CGR = 41, WGR = 171 (bbl/mmcf)

Recent Project Activity

slide-8
SLIDE 8

NW AB Montney Well Decline – Low Producer / High WC Gas Lift Application

Natural Flow, lasted 5 months prior to unstable flow Gas Lift Optimized, LGR 200 bbl/mmcf, 70 % WC 10 year Forecast, LGR 200 bbl/mmcf, 70 % WC Initial Gas Lift Start-Up, LGR 350 bbl/mmcf, 50 % WC

Gas Lift Installed on Initial Completion

*Gas Lift installed on initial completion best recommended practice, gas lift can keep well flowing with reservoir pressure support

slide-9
SLIDE 9

NW AB Montney Well Decline – High Initial Producer – Requires Gas Lift

LGR 115 bbl/mmcf, 0 % WC LGR 275 bbl/mmcf, 50 % WC

Gas Lift Not Installed

*A/L installed later in well’s life requires expensive workover, gas lift on initial completion is more effective, can be started on demand

slide-10
SLIDE 10

NW AB Montney Well with Gas Lift Deployment Downhole Profile –Toe Up

Packer Orifice Valve 1 Gas Lift Valve 2 Gas Lift Valve 3 Gas Lift Valve 4 Gas Lift Valve 5 Gas Lift Valve 6 Gas Lift Valve 7

HZ Lateral TVD Magnified View (Toe Up)

slide-11
SLIDE 11

Mobile Gas Lift Service Unit

GLift offers the only mobile gas lift service unit in Canada, providing premium service with onsite quality control of mandrel and valve installation, at the lowest possible cost

slide-12
SLIDE 12

July 2017 SPE – Technology Focus: Artificial Lift

https://www.spe.org/en/jpt/jpt-article-detail/?art=3111 Gas Lift Study in July 2017 issue of JPT – Technology Focus Report

  • n A/L

methods for Shale Wells – Declaring gas lift as best method

slide-13
SLIDE 13

Side Pocket Mandrel Datasheet – Common Size Applications

slide-14
SLIDE 14
  • GLift has sourced an equipment provider, meeting all required

specifications such as: API 19G1, API 19G2 and ISO 9001:2008

  • Flow Assurance is GLift’s specialty, we’ll go the extra mile to ensure all

projects are successful during installation and start-up.

  • GLift has the ability and expertise to provide a customized install including

downhole tools and surface equipment

  • Consult GLift for any well operational issues related to flow assurance,

including well review, well and pipeline flow modeling / de-bottlenecking

  • PRODUCTION ENGINEERING OPTIMIZATION IS GLIFT’S PASSION, YOUR

SUCCESS IS OUR SUCCESS

  • Contact the GLift team for all your gas or plunger lift needs today:
  • Richard Grohn – Richard.Grohn@GLiftenergy.com (587.583.2842)
  • Terry Allen – Terry.Allen@GLiftenergy.com (403.613.2076)