STATE INFORMATION TECHNOLOGY AGENCY COMPULSORY TENDER BRIEFING RFB2007-2019 1 DOCUMENTS PROVIDED ON WEB . 2 BID DOCUMENT (51) pages 3 TECHNICAL SPEC AND COSTING 147 PAGES 4 XCEL PRICING SCHEDULES Elec BOQ 20190.01.31 (9 Pages)


  1. STATE INFORMATION TECHNOLOGY AGENCY COMPULSORY TENDER BRIEFING RFB2007-2019 1

  2. DOCUMENTS PROVIDED ON WEB . 2

  3. BID DOCUMENT (51) pages 3

  4. TECHNICAL SPEC AND COSTING  147 PAGES 4

  5. XCEL PRICING SCHEDULES  Elec BOQ 20190.01.31 (9 Pages)  Mech BOQ 2019.01.31  Bill A (2 Pages) PREAMBLES TO BILLS OF QUANTITIES  Bill B (2 Pages) PREAMBLES  Bill C (2 Pages) PRELIMINARY AND GENERAL  Bill D (2 Pages) DATA CENTRE  Bill E (2 Pages) AIR CONDITIONING PLANT ROOM  Bill F (2 Pages) BMS INSTALLATION  Bill G (4 Pages) BUILDERS WORK  Bill Summary (1 Page) 5

  6. COMPULSORY SUPPLIMENTARY INFORMATION  The returnable schedules in this section are duplicates of the returnable schedules in the TECHNICAL SPEC AND COSTING.  290 Pages containing the following information:    6

  7. INSTRUCTIONS TO BIDDERS  Please complete all the information requested in the bid document. Tic all the appropriate tic boxes in section 1  Provide all the details requested in section 2  Tic all the appropriate tic boxes in section 3 paragraph 6  Section 4 SBD provide all the information requested and answer all the Yes/No questions and complete and sign the declaration.  and sign at all the 7

  8. INSTRUCTIONS TO BIDDERS  The National Industrial Participation (NIP) Programme to be completed and signed.  Preferential Procurement Claim form SBD 6.1 to be completed, check all tic boxes and sign at the end.  Sworn Affidavit – B-BBEE Qualifying Small Enterprise to be completed and signed and certified by a commissioner of oaths.  Sworn Affidavit – B-BBEE Exempted Micro Enterprise to be completed and signed and certified by a commissioner of oaths (if applicable) 8

  9. INSTRUCTIONS TO BIDDERS  Declaration of Bidder’s Past Supply Chain Management Practices SBD 8 to be completed, check all tic boxes and sign at the end.  Certificate of Independent Bid Determination SBD 9 complete and sign.  Section6 Government Procurement: General Conditions of Contract – July 2011 complete and sign.  Note that all the above are required or the tender will be disqualified. 9

  10. INSTRUCTIONS TO BIDDERS TECHNICAL SPEC AND COSTING  MANDATORY TECHNICAL REQUIREMENTS  (1) BIDDER CERTIFICATION / AFFILIATION REQUIREMENTS (Valid certificate)  (2) CIDB RATING (7ME) (Valid certificate)  (3) BIDDER EXPERIENCE AND CAPABILITY REQUIREMENTS  (4) BIDDER EXPERIENCE AND CAPABILITY REQUIREMENTS 10

  11. INSTRUCTIONS TO BIDDERS TECHNICAL SPEC AND COSTING  (5) MECHANICAL STANDARD SPECIFICATION, PROJECT SPECIFICATION, SCHEDULE OF CAPACITIES, SCHEDULE OF CAPACITIES RETURNABLE (Annexure A.7)  (6) ELECTRICAL STANDARD SPECIFICATION, PROJECT SPECIFICATION, DATA SHEETS (Annexure A.8)  Note that all the above are required or the tender will be disqualified. 11

  12. Questions 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.