UNLV Campus Improvement Authority Board
Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events
April 24, 2014
Review of Stadium Tours, Estimated Building Costs and Proposed - - PowerPoint PPT Presentation
UNLV Campus Improvement Authority Board Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events April 24, 2014 TABLE OF contents 1) TOURS OF TEXAS STADIUMS ............................................................3
UNLV Campus Improvement Authority Board
Review of Stadium Tours, Estimated Building Costs and Proposed Calendar of Events
April 24, 2014
2
............................................ 44
........................................ 50
TABLE OF contents
3
4
STadiumS TouRS:
recently built stadium developments based in Texas
University
TouR PaRTiCiPanTS:
aT&T STadium dallaS CowBoyS amon G. CaRTER STadium TCu mClanE STadium BayloR univERSiTy
TOURS OF texAs stAdiums
aT&T STadium
yEaR oPEnEd CaPaCiTy
PRojECT CoST PRojECT FinanCE:
PREmium SEaTinG:
2009 80,000 3.0M sq. ft. $1,214M
5
aT&T STadium ExTERioR
6
aT&T STadium SEaTinG Bowl
7
aT&T STadium CluB lounGE
8
aT&T STadium CluB lounGE
9
aT&T STadium FiEld lEvEl CluB
10
aT&T STadium FiEld lEvEl CluB
11
luxuRy SuiTE ovERviEw
12
aT&T STadium FiEld lEvEl SuiTE
13
aT&T STadium PRivaTE SuiTE
14
aT&T STadium BaSkETBall ConFiGuRaTion
15
aT&T STadium BaSkETBall ConFiGuRaTion
16
aT&T STadium BoxinG ConFiGuRaTion
17
aT&T STadium ConCERT ConFiGuRaTion
18
aT&T STadium moToRSPoRT ConFiGuRaTion
19
amon G. CaRTER STadium
PRojECT FinanCE:
Stand and a new press box
PREmium SEaTinG:
price with food included.
($2,500/space X 1,000spaces)
presence.
yEaR oPEnEd CaPaCiTy
PRojECT CoST
1930, 2012 Renovation 45,000 279,179 sq. ft. $164M
20
amon G. CaRTER STadium nEw ExTERioR
21
amon G. CaRTER STadium inTERioR ConCouRSES
22
amon G. CaRTER STadium End ZonE PaRTy dECk
23
amon G. CaRTER STadium CluB lounGES
24
amon G. CaRTER STadium STandaRd SuiTES
25
amon G. CaRTER STadium FoundERS CluB SPaCE
26
amon G. CaRTER STadium individual FoundERS SuiTE
27
amon G. CaRTER STadium PREmium TailGaTE ZonES
28
mClanE STadium
PRojECT FinanCE:
the $260 million McLean Stadium along with other facilities on campus.
new stadium
the purchase of club seats, loge boxes and luxury suites in the new stadium.
PREmium SEaTinG
capital gifts.
donations.
yEaR oPEnEd CaPaCiTy
PRojECT CoST
2014 45,000 860,000 sq. ft. $260M
29
mClanE STadium STadium ExTERioR
30
mClanE STadium STadium ExTERioR
31
mClanE STadium STadium Bowl
32
mClanE STadium SCoREBoaRd
33
mClanE STadium ShadinG SySTEm
34
mClanE STadium SuiTE and CluB dECk
35
mClanE STadium loGE BoxES
36
mClanE STadium loGE Box REndERinGS
37
mClanE STadium CluB SEaTinG aREaS
38
mClanE STadium viEwS
39
41
Las Vegas Stadium – 40’ Small Roof 92,188 Sq. Ft. of Roof
LAS VEGAS STADIUM sun study
Gensler
42
Las Vegas Stadium – 75’ Medium Roof 147,780 Sq. Ft. of Roof
LAS VEGAS STADIUM sun study
Gensler
43
Las Vegas Stadium – 125’ Large Roof 227,165 Sq. Ft. of Roof
LAS VEGAS STADIUM sun study
Gensler
mClanE STadium - BayloR
yEaR oPEnEd loCaTion ConSTRuCTion CoST CaPaCiTy CoST PER SEaT ConCouRSES widTh lEnGTh FooTPRinT SquaRE FEET
2014 Waco, Texas $250.0 million 45,000 $5,556 2 650’ 815’ 529,750 sqft 860,000 sqft
Note: Construction cost only includes hard costs; not inclusive of soft costs like design and architectural fees, land, interest or other development costs.45
TCF Bank STadium - minnESoTa
yEaR oPEnEd: loCaTion: ConSTRuCTion CoST:
(2014 dollaRS)CaPaCiTy: CoST PER SEaT: ConCouRSES: widTh: lEnGTh: FooTPRinT: SquaRE FEET:
2009 Minneapolis, Minnesota $375.0 million 50,805 $7,381 2 715’ 910’ 650,650 sq. ft. 908,000 sq. ft.
Note: Construction costs have been inflated by 5% a year, with construction starting in46
houSTon STadium
yEaR oPEnEd loCaTion ConSTRuCTion CoST CaPaCiTy CoST PER SEaT ConCouRSES widTh lEnGTh FooTPRinT SquaRE FEET
2014 Houston, Texas $105.0 million 40,000 $2,625 1 650’ 910’ 591,500 sq. ft. 660,000 sq. ft.
Note: Construction cost only includes hard costs; not inclusive of soft costs like design and architectural fees, land, interest or other development costs.47
laS vEGaS STadium
CaPaCiTy ConCouRSES widTh lEnGTh FooTPRinT SEaTinG Bowl inTERioR SPaCE SquaRE FEET
50,000 2 675’ 900’ 607,500 sq. ft. 280,000 sq. ft. 350,000 sq. ft. 900,000 sq. ft.
48
49
LAS VEGAS STADIUM cost estimAte
Total&Construction&Cost $392,057,717 Total&Construction&Cost Soft&Costs $98,014,429 Soft&Costs Total&Hard&&&Soft&Costs $490,072,146 Total&Hard&&&Soft&Costs Shading&System Project&Cost&with&40&ft&Small&Roof& Project&Cost&with&75&ft&Medium&Roof& Project&Cost&with&125&ft&Large&Roof&
OpenJAir OpenJAir&with&Shading
$392,057,717 Total&Construction&Cost $392,057,717 Total&Construction&Cost $392,057,717 98,014,429 Soft&Costs 98,014,429 Soft&Costs 98,014,429 $490,072,146 Fixed&Fabric&Roof&Premium 142,004,648 Retractable&Roof&Premium 192,004,648 Project&Cost&with&Domed&Roof $632,076,794 Project&Cost&with&Retractable&Roof $682,076,794 $497,407,341 $504,770,252 $514,172,081
OpenJAir&with&Shading Domed Retractable&Roof
iTEmS wiThin CoST ESTimaTE:
PoTEnTial addEd CoSTS:
below grade
CoSTS To BE dETERminEd:
Retractable Roof Domed
Total&Construction&Cost $392,057,717 Total&Construction&Cost Soft&Costs $98,014,429 Soft&Costs Total&Hard&&&Soft&Costs $490,072,146 Total&Hard&&&Soft&Costs Shading&System Project&Cost&with&40&ft&Small&Roof& Project&Cost&with&75&ft&Medium&Roof& Project&Cost&with&125&ft&Large&Roof&
OpenJAir OpenJAir&with&Shading
$392,057,717 Total&Construction&Cost $392,057,717 Total&Construction&Cost $392,057,717 98,014,429 Soft&Costs 98,014,429 Soft&Costs 98,014,429 $490,072,146 Fixed&Fabric&Roof&Premium 142,004,648 Retractable&Roof&Premium 192,004,648 Project&Cost&with&Domed&Roof $632,076,794 Project&Cost&with&Retractable&Roof $682,076,794 $497,407,341 $504,770,252 $514,172,081
OpenJAir&with&Shading Domed Retractable&Roof
Open-Air With Shading System
Total&Construction&Cost $392,057,717 Total&Construction&Cost Soft&Costs $98,014,429 Soft&Costs Total&Hard&&&Soft&Costs $490,072,146 Total&Hard&&&Soft&Costs Shading&System Project&Cost&with&40&ft&Small&Roof& Project&Cost&with&75&ft&Medium&Roof& Project&Cost&with&125&ft&Large&Roof&
OpenJAir OpenJAir&with&Shading
$392,057,717 Total&Construction&Cost $392,057,717 Total&Construction&Cost $392,057,717 98,014,429 Soft&Costs 98,014,429 Soft&Costs 98,014,429 $490,072,146 Fixed&Fabric&Roof&Premium 142,004,648 Retractable&Roof&Premium 192,004,648 Project&Cost&with&Domed&Roof $632,076,794 Project&Cost&with&Retractable&Roof $682,076,794 $497,407,341 $504,770,252 $514,172,081
OpenJAir&with&Shading Domed Retractable&Roof
Open-Air
EvEnTS idEnTiFiEd in maRk RoSEnTRauB STudy:
(December)
another time) 2-3 days
LAS VEGAS STADIUM
PotentiAl events
Mark Rosentraub study anticipated that
15 NEW MEGA- EVENTS
will take place at a new mega-events center/stadium in Las Vegas on an annual basis.
51
LAS VEGAS STADIUM
PotentiAl events
PoTEnTial EvEnTS aT a nEw STadium idEnTiFiEd By CSl:
52
53
LAS VEGAS STADIUM event summAry
EvEnT ComPaRiSon oF RooF SCEnaRioS:
two additional major non-recurring events
closed roof facility but not at an open-air
at a closed roof stadium
closed-roof stadium
additional major rugby event
for hosting international soccer events and is projected to host one additional event
games, CSL projections for closed roof (18) and open-air (16) are in-line with the annual mega-event projections made in the Rosentraub study (15)
SBS SBS CSL CSL Category ¡Existing Future Closed ¡Roof Open-‑Air UNLV ¡Football 6 6 6 6 MLS 17 17 International ¡Soccer 1 1 2 Major ¡Concert 2 1 Festival Rugby 1 3 4 Signature 1 1 Major ¡Non-‑Recurring 2 Las ¡Vegas ¡Bowl 1 1 1 1 New ¡Bowl ¡Game 1 Neutral ¡Site ¡NCAA ¡Football 2 2 UFC 1 1 Boxing 1 Motorsports 3 1 3 3 Total ¡Events 12 8 41 38 Total ¡Events ¡(excluding ¡MLS) 12 8 24 21
Event ¡Progamming ¡Summary
54
LAS VEGAS/UNLV multi-PurPose stAdium
hyPoThETiCal EvEnT CalEndaR FoR CloSEd RooF SCEnaRio
CloSEd RooF STadium EvEnT SummaRy:
55
LAS VEGAS/UNLV multi-PurPose stAdium
hyPoThETiCal EvEnT CalEndaR FoR oPEn-aiR SCEnaRio