resource efficient development energy
play

Resource Efficient Development & Energy by Utilizing Garbage - PowerPoint PPT Presentation

Resource Efficient Development & Energy by Utilizing Garbage all of it! EnEco Systems Inc. (ENvironmental problems need ECOnomical solutions) It is only after garbage is dumped at a landfill that it is truly wasted Locally, 180


  1. Resource Efficient Development & Energy by Utilizing Garbage… all of it! EnEco Systems Inc. (ENvironmental problems need ECOnomical solutions)

  2. It is only after garbage is dumped at a landfill that it is truly wasted… • Locally, 180 tons are WASTED each day in this region! • Utilization of waste reduces carbon footprint and creates local jobs. • Post recycled waste contains many forms of valuable metal and glass needing recovery.

  3. How does our recovery process work? Cleaned Ugly Carbon & Carbon Energy is is fixed into decomposed living to gas plants, fish food & fish. The process is a closed loop of technologies that work together in synergy like nature.

  4. TOPS preserves the Eco-value of aluminum, copper, etc. for proper recycling. Nickel plated metals Copper After processing in TOPS Aluminum Bottle Cap Glass After processing in TOPS

  5. Small is Nimble • Adapts to market changes in waste supply for less per ton than current rates. • Small plant footprint: – TOPS; 80 x 30 Meters – Fish/Shrimp Farm; 80 x 30 – Hydroponics; ½ Hectare

  6. Small is Quick • Construction time to build turnkey TOPS plant with aquaponics: 8 - 12 months.

  7. How does a TOPS plant work? Landfill gas and/or Air Conditioning Unsorted Garbage 90 % Plant Efficiency Controlled growth environment Fish Basil Bricks

  8. 1. Recycle everything you can!

  9. 2. Load unsorted waste

  10. 3. Glass, metal and concrete additive comes out. Ash is carbon free About 5% by volume remains

  11. Multi-fueled high yield aquaponics plants – local jobs. Algae TOPS Powered Fish Tanks Tanks are warmed with superconductor heat transfer systems. Exit water goes to herbs. Basil Water is pumped using excess energy. Super healthy Fish

  12. Self sufficient power user. TOPS Powered ORC Power I sland - No engineer required - Very reliable - Low maintenance

  13. World class emission controls. Meets Ontario standards - toughest in Canada - no water discharge - no solids discharge - continuous monitoring

  14. Zero Waste Option • TOPS reduces garbage in volume by 95% and all of the remaining 5% is recycled - most WTE only achieve 75 to 80%: 20% is sent to landfill.

  15. Zero Waste Option • TOPS reduces garbage in volume by 95% and all of the remaining 5% is recycled - most WTE only achieve 75 to 80%: 20% is sent to landfill. • Ash from TOPS is carbon free: meaning it is like fly ash which has a known market in the Cement industry – no landfill required.

  16. Zero Waste Option • TOPS reduces garbage in volume by 95% and all of the remaining 5% is recycled - most WTE only achieve 75 to 80%: 20% is sent to landfill. • Ash from TOPS is carbon free: meaning it is like fly ash which has a known market in the Cement industry – no landfill required. • All metals are recovered without any loss in value: meaning low environmental impact.

  17. Zero Waste Option • TOPS reduces garbage in volume by 95% and all of the remaining 5% is recycled - most WTE only achieve 75 to 80%: 20% is sent to landfill. • Ash from TOPS is carbon free: meaning it is like fly ash which has a known market in the Cement industry – no landfill required. • All metals are recovered without any loss in value: meaning low environmental impact. • This adds up to ZERO waste from TOPS.

  18. Select installations: Canada World’s most Northern Community! Delivered 1992 Dept. Def. Capacity: 5 – 7 tons Operator time: 1 hr./ day Scrubber: (not required)

  19. Malaysia Delivered 2001 Capacity: 20 – 50 tons Operator time: 2 hr./ day Scrubber: ($20/ day lime)

  20. US Navy Load garbage without sorting it! Delivered 1995 Capacity: 10 – 20 tons Operator time: 2 hr./ day Scrubber: (not required)

  21. Brampton area - Ontario Delivered 2011 Capacity: 50 – 70 tons Operator time: 4 hr./ day Scrubber: (Wet)

  22. Project Implementation • Supply agreement. • Ownership: – EnEco – Regional District – Joint Venture • EnEco is a B.C. Company, interested in B.C. Projects. • Decentralized Plants (local benefits preserved) – Comox / Courtney / Cumberland Plant – Campbell River Plant

  23. EnEco municipal solid waste conversion cycle: instead of the dump, use TOPS to convert garbage into something useful. Compost -Yard Aluminum -Food Copper Remaining Source Municipal Separation Steel Solid Waste -Papers - Cans Electricity (as received) - Bottles -Diapers Drinking Water -Shoes EnEco -Curtains Special -Rags TOPS Air Conditioning Waste -Paint brushes - Band-Aids -Batteries -Meat blotters Veggies -Computer -Plastic wrap -Clinical -Sludge Low impact -Medical Fish -Etc. gasification Concrete Commercial Heating & Demolition Inputs Process Outputs

  24. “The world will not “The world will not evolve beyond its’ evolve beyond its’ current state of crisis current state of crisis by using the same by using the same thinking that created thinking that created the situation." the situation." - Albert Einstein

  25. Contact information: • EnEco: eneco@eneco.ca • www.eneco.ca • (604) 649-4518

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend