Resource Efficient Development & Energy by Utilizing Garbage all of it! EnEco Systems Inc. (ENvironmental problems need ECOnomical solutions) It is only after garbage is dumped at a landfill that it is truly wasted Locally, 180


slide-1
SLIDE 1

EnEco Systems Inc.

(ENvironmental problems need ECOnomical solutions)

Resource Efficient Development & Energy

Utilizing Garbage… all of it!

by

slide-2
SLIDE 2

It is only after garbage is dumped at a landfill that it is truly wasted…

  • Locally, 180 tons are

WASTED each day in this region!

  • Utilization of waste

reduces carbon footprint and creates local jobs.

  • Post recycled waste

contains many forms of valuable metal and glass needing recovery.

slide-3
SLIDE 3

How does our recovery process work?

Ugly Carbon

is decomposed to gas Cleaned Carbon & Energy is fixed into living plants, fish food & fish. The process is a closed loop of technologies that work together in synergy like nature.

slide-4
SLIDE 4

TOPS preserves the Eco-value of aluminum, copper, etc. for proper recycling.

Nickel plated metals Glass Bottle Cap Copper Aluminum After processing in TOPS After processing in TOPS

slide-5
SLIDE 5

Small is Nimble

  • Adapts to market changes

in waste supply for less per ton than current rates.

  • Small plant footprint:

– TOPS; 80 x 30 Meters – Fish/Shrimp Farm; 80 x 30 – Hydroponics; ½ Hectare

slide-6
SLIDE 6

Small is Quick

  • Construction

time to build turnkey TOPS plant with aquaponics: 8 - 12 months.

slide-7
SLIDE 7

How does a TOPS plant work?

Fish Basil Unsorted Garbage Bricks

Controlled growth environment

and/or Air Conditioning

Landfill gas 90 % Plant Efficiency

slide-8
SLIDE 8
  • 1. Recycle everything you can!
slide-9
SLIDE 9
  • 2. Load unsorted waste
slide-10
SLIDE 10
  • 3. Glass, metal and concrete

additive comes out.

Ash is carbon free About 5% by volume remains

slide-11
SLIDE 11

Multi-fueled high yield aquaponics plants – local jobs.

Tanks are warmed with superconductor heat transfer systems. Exit water goes to herbs. Water is pumped using excess energy. Super healthy Fish TOPS Powered Fish Tanks Algae Basil

slide-12
SLIDE 12

Self sufficient power user.

TOPS Powered

ORC Power I sland

  • No engineer required
  • Very reliable
  • Low maintenance
slide-13
SLIDE 13

World class emission controls.

Meets Ontario standards

  • toughest in Canada
  • no water discharge
  • no solids discharge
  • continuous monitoring
slide-14
SLIDE 14

Zero Waste Option

  • TOPS reduces garbage in volume by 95% and

all of the remaining 5% is recycled - most WTE

  • nly achieve 75 to 80%: 20% is sent to landfill.
slide-15
SLIDE 15

Zero Waste Option

  • TOPS reduces garbage in volume by 95% and

all of the remaining 5% is recycled - most WTE

  • nly achieve 75 to 80%: 20% is sent to landfill.
  • Ash from TOPS is carbon free: meaning it is like

fly ash which has a known market in the Cement industry – no landfill required.

slide-16
SLIDE 16

Zero Waste Option

  • TOPS reduces garbage in volume by 95% and

all of the remaining 5% is recycled - most WTE

  • nly achieve 75 to 80%: 20% is sent to landfill.
  • Ash from TOPS is carbon free: meaning it is like

fly ash which has a known market in the Cement industry – no landfill required.

  • All metals are recovered without any loss in

value: meaning low environmental impact.

slide-17
SLIDE 17

Zero Waste Option

  • TOPS reduces garbage in volume by 95% and

all of the remaining 5% is recycled - most WTE

  • nly achieve 75 to 80%: 20% is sent to landfill.
  • Ash from TOPS is carbon free: meaning it is like

fly ash which has a known market in the Cement industry – no landfill required.

  • All metals are recovered without any loss in

value: meaning low environmental impact.

  • This adds up to ZERO waste from TOPS.
slide-18
SLIDE 18

Select installations: Canada

Delivered 1992 Dept. Def. Capacity: 5 – 7 tons Operator time: 1 hr./ day Scrubber: (not required) World’s most Northern Community!

slide-19
SLIDE 19

Malaysia

Delivered 2001 Capacity: 20 – 50 tons Operator time: 2 hr./ day Scrubber: ($20/ day lime)

slide-20
SLIDE 20

US Navy

Delivered 1995 Capacity: 10 – 20 tons Operator time: 2 hr./ day Scrubber: (not required) Load garbage without sorting it!

slide-21
SLIDE 21

Brampton area - Ontario

Delivered 2011 Capacity: 50 – 70 tons Operator time: 4 hr./ day Scrubber: (Wet)

slide-22
SLIDE 22

Project Implementation

  • Supply agreement.
  • Ownership:

– EnEco – Regional District – Joint Venture

  • EnEco is a B.C. Company, interested in B.C.

Projects.

  • Decentralized Plants (local benefits preserved)

– Comox / Courtney / Cumberland Plant – Campbell River Plant

slide-23
SLIDE 23

Remaining Municipal Solid Waste (as received)

  • Diapers
  • Shoes
  • Curtains
  • Rags
  • Paint brushes
  • Band-Aids
  • Meat blotters
  • Plastic wrap
  • Sludge
  • Etc.

Compost

  • Yard
  • Food

Source Separation

  • Papers
  • Cans
  • Bottles

Special Waste

  • Batteries
  • Computer
  • Clinical
  • Medical

Commercial & Demolition EnEco TOPS Aluminum Copper Steel Electricity

Drinking Water Air Conditioning

Veggies Fish Concrete Heating

EnEco municipal solid waste conversion cycle:

instead of the dump, use TOPS to convert garbage into something useful.

Inputs Process Outputs

Low impact gasification

slide-24
SLIDE 24

“The world will not “The world will not evolve beyond its’ evolve beyond its’ current state of crisis current state of crisis by using the same by using the same thinking that created thinking that created the situation." the situation."

  • Albert Einstein