LIC-16-16.50 SR 16-Cherry Valley Interchange (PID 80704) SR - - PowerPoint PPT Presentation

LIC-16-16.50 SR 16-Cherry Valley Interchange (PID 80704) SR 16/Cherry Valley Road Interchange 201 1 TRAC Application 1 w w w. t r a n s p o r t a t i o n . o h i o . g o v SR 16-Cherry Valley Road TRAC Status Tier 2 Status; Tier 1


slide-1
SLIDE 1

w w w. t r a n s p o r t a t i o n . o h i o . g o v

1 SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

LIC-16-16.50

SR 16-Cherry Valley Interchange (PID 80704)

slide-2
SLIDE 2

w w w. t r a n s p o r t a t i o n . o h i o . g o v

2

SR 16-Cherry Valley Road

TRAC Status

Tier 2 Status; Tier 1 Application Request: $3.4M RW and $29.3M CO Phases

Description of Work

Replacement of at-grade intersection Construction of Interchange Facility Removal of access point and structure

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-3
SLIDE 3

w w w. t r a n s p o r t a t i o n . o h i o . g o v

3

Project Location Map

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-4
SLIDE 4

w w w. t r a n s p o r t a t i o n . o h i o . g o v

4

Preferred Alternative Map

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-5
SLIDE 5

w w w. t r a n s p o r t a t i o n . o h i o . g o v

5

Project Background

Previous Studies

Thornwood Drive, Cherry Valley Road, SR 16 Corridor Study Corridor Study Broken into 3 Separate Projects

Adjacent Projects

SR 161/37/16 Expansion Thornwood Drive Projects

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-6
SLIDE 6

w w w. t r a n s p o r t a t i o n . o h i o . g o v

6

Purpose and Need

Improve Traffic flow

Currently Experiencing LOS E Future Conditions Worsening to LOS F Queue Lengths exceed 2000 feet Intersection at or overcapacity for peak periods (AM V/C ratio = 0.95, PM V/C ratio = 1.18)

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-7
SLIDE 7

w w w. t r a n s p o r t a t i o n . o h i o . g o v

7

Improve Traffic Flow

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-8
SLIDE 8

w w w. t r a n s p o r t a t i o n . o h i o . g o v

8

Improve Traffic Flow

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-9
SLIDE 9

w w w. t r a n s p o r t a t i o n . o h i o . g o v

9

Improve Traffic Flow

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-10
SLIDE 10

w w w. t r a n s p o r t a t i o n . o h i o . g o v

10

Purpose and Need (cont.)

Improve Safety

Congestion Related Crashes 123 Total Crashes in 3-Year Period Crash Rate = 1.34 crashes/mvmt (4.5 Times the Statewide Average, 0.31 crashes/mev)

Connectivity

Within SR 161/37/16 Macro-Corridor Critical Link between Columbus and Newark

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-11
SLIDE 11

w w w. t r a n s p o r t a t i o n . o h i o . g o v

1 1

Project Funding/Status

Existing/Requested Funding

R/W : $1.7M (LCATS) and $3.4 (TRAC) Construction : $29.3 (TRAC)

Project Status

Environmental Document Approved (June 2011) Stage 1 Plans Complete (August 2011) Stage 2 Plans (Scheduled - March 2012)

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-12
SLIDE 12

w w w. t r a n s p o r t a t i o n . o h i o . g o v

12

Economic Development

Within 5-Miles of Project

307 Businesses 24,646 Employees $2.95B in Sales

Access to Major Employers

Central Ohio Aerospace and Technology

Boeing , Samuel Manu-Tech, Goodrich

Newark Medical Center

Licking Memorial Hospital, Medical Benefits

Others

OSU-Newark, Denison, Tamarack Farms, Anomatic

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-13
SLIDE 13

w w w. t r a n s p o r t a t i o n . o h i o . g o v

13

Employment Map

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

Proposed Interchange

slide-14
SLIDE 14

w w w. t r a n s p o r t a t i o n . o h i o . g o v

14

Economic Development (cont.)

Thornwood Drive Corridor

Zoning In-place to Support Industrial and Manufacturing Uses Utilities in-place to support development 887 7 Acres of Land Available for development Sites with Rail Access

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-15
SLIDE 15

w w w. t r a n s p o r t a t i o n . o h i o . g o v

15

Development Map

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

Proposed Interchange Thornwood Corridor

slide-16
SLIDE 16

w w w. t r a n s p o r t a t i o n . o h i o . g o v

16

Project Strengths

Safety/Congestion Priority

Addresses Congested Chokepoint Addresses Significant Crash Pattern That Exceeds Statewide Averages Addresses Corridor Continuity Between SR 161/37 and Newark Expressway Mitigates Concerns Related to Only Signal Between Newark and IR 270-SR 161 Interchange

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application

slide-17
SLIDE 17

w w w. t r a n s p o r t a t i o n . o h i o . g o v

17

Project Strengths (cont.)

Economic Development

Access to Major Existing Employers

Industrial, Manufacturing, Healthcare, Medical, and Educational Employment Centers

Access to Thornwood Drive Industrial Corridor

Shovel-Ready Development Sites Serviced by utilities and Rail

SR 16/Cherry Valley Road Interchange– 201 1 TRAC Application