Regional Transportation Systems Management and Operations (TSMO) - - PowerPoint PPT Presentation

regional transportation systems management and operations
SMART_READER_LITE
LIVE PREVIEW

Regional Transportation Systems Management and Operations (TSMO) - - PowerPoint PPT Presentation

Regional Transportation Systems Management and Operations (TSMO) Program What is Transportation Systems Management and Operations (TSMO)? An integrated set of strategies to optimize the performance of existing infrastructure through the


slide-1
SLIDE 1

Regional Transportation Systems Management and Operations (TSMO) Program

slide-2
SLIDE 2

What is Transportation Systems Management and Operations (TSMO)?

An integrated set of strategies to

  • ptimize the performance of

existing infrastructure through the implementation of multimodal and intermodal, cross-jurisdictional systems, services, and projects designed to preserve capacity and im improve se security, sa safety, a and nd reliab iabil ilit ity of the transportation system.

MAP-21, SECTION 1103 (a) (30) (A)

slide-3
SLIDE 3

Bottle lenecks, , 40% 40% Po Poor Sig Signal Timing ng, , 5% 5% Special al Eve vents, , 5% 5% Incle lement Weathe her, , 15% 15% Work rk Z Zones, , 10% 10% Incide dents, , 25% 25%

Urban C Congestion P Perspe pective

Work rk Z Zones, , 35% 35% Po Poor Sig Signal Timing ng, , 2% 2% Incle lement Weathe her, , 10% 10% Bottle lenecks, , 3% 3% Incide dents, , 50% 50%

Rural l Conges esti tion P Perspecti tive

Source: 2015 Urban Mobility Scorecard

slide-4
SLIDE 4

TSMO Strategies

  • Active Transportation
  • Congestion Pricing
  • Freight Management
  • Integrated Corridors
  • Incident Management
  • Managed Lanes
  • Parking Management
  • Road Weather
  • Special Events
  • Incident Management
  • Traffic Signals
  • Transit Signal Priority
  • Traveler Information
  • Work Zones
slide-5
SLIDE 5

MetroPlan Orlando

  • 10 Worst First

Behaviors/Locations

  • TSMO Department
  • Committee
  • Funding
  • “Champions”
slide-6
SLIDE 6

“Most

  • st da

dangerous h high ghway in A America ca”

Source: A : ABC news; N s; Novemb mber 2 2017

Fog Related Crashes Crash Severity Lane Closing Events

slide-7
SLIDE 7
  • Polk TPO
  • Hillsborough MPO
  • Forward Pinellas
  • Sarasota/Manatee

MPO

  • Pasco MPO
slide-8
SLIDE 8

Tasks

  • Task 1: Regional TSMO Opportunity
  • Task 2: Policy Board Support
  • Task 3: Development of TSMO

 Cap apability Matu Maturi rity Mo Model (C (CMM) MM)

  • Task 4: Formalize Interagency Agreement
  • Task 5: Management
  • Task 6: Evaluation
slide-9
SLIDE 9
  • Business Processes
  • Systems and Technology
  • Performance Measurement
  • Culture
  • Organization and Staffing
  • Collaboration

Dimensions of CMM*

9

*Transportation Research Board (TRB); Strategic Highway Research Program (SHRP 2 L06)

slide-10
SLIDE 10

LEVEL 1

Perfor

  • rmed
  • Activities &

relationships ad hoc

  • Champion - driven
  • LEVEL 2

Man anaged aged

  • Processes developing
  • Staff training
  • Limited accountability

LEVEL 3

Integ egrated

  • Process documented
  • Performance measured
  • Organization/

partners aligned

  • Program budgeted

LEVEL 4

Optimi mized zed

  • Performance - based

improvement

  • Formal program
  • Formal partnerships

Mos

  • st A

Agencies Tod

  • day

Go Goal for t the F e Future

The focus is on continuous improvement - in effect, a roadmap for “getting better at getting better.”

slide-11
SLIDE 11

Capabili lity L Leve vel l Self E Evalu luation Structure

DIMENSIONS Level/Score (Out ut o

  • f 4)

Agen gency/T /Type 201 014 2017 17 Business Processes 1.5 2.0 Consensus Systems & Technology 1.0 2.0 Transit 1.5 2.0 Other Performance Measurement 1.0 1.0 Consensus: Arterial 2.0 1.0 Consensus: Freeways Culture 1.5 2.0 MPOs, FDOT, Transit 1.0 2.0 Counties Organization/Workforce 2.0 3.0 FDOT N/A 3.0 MetroPlan Orlando 1.0/2.0 2.0 MPOs & Counties Collaboration 2.0 2.5 Consensus

CMM M – FDO DOT D5 D5

Within the District, there are five (5) MPOs/TPOs, representing nine (9) counties.

slide-12
SLIDE 12

Capabili lity L Leve vel l Self E Evalu luation Structure

DIMENSIONS LEVEL 1 1 PERFOR ORMED ED LEVEL 2 2 MANAG AGED LEVEL 3 3 INTEG EGRATED ED LEVEL 4 4 OPTIMIZ IZIN ING Business Processes

D7 P H

Systems & Technology

H P D7

Performance Measurement

P H D7 P

Culture

P D7

Organization/ Workforce

D7 P

Collaboration

P D7

CMM MM – Regio ional al T TSMO Program am

P – Pasco; P- Pinellas; H-Hillsborough. Sarasota/Manatee MPO, Polk County TPO and FDOT D1 not included.

slide-13
SLIDE 13

Evaluation

  • TSMO, a core agency program
  • Integration of TSMO
  • Culture that supports and values TSMO
  • Investments
  • Reliability in analysis for projects
  • Development of workforce capabilities
  • Partnerships and collaboration

Mainstreaming Transportation Systems Management and Operations, Public Roads, Winter 2020

slide-14
SLIDE 14

Challenges/Opportunties

  • Staff turnover
  • LRTP Updates
  • Change
  • Parochialism
  • Resources
  • Timing
slide-15
SLIDE 15

Thank You

MetroPlanOrlando.com | 407-481-5672 250 South Orange Ave., Suite 200, Orlando, FL 32801