region 1 area commission on transportation
play

Region 1 Area Commission on Transportation Department of Community - PowerPoint PPT Presentation

Region 1 Area Commission on Transportation Department of Community Services Transportation Division October 7, 2019 The information presented here, and the public and agency input received, may be adopted or incorporated by reference into a


  1. Region 1 Area Commission on Transportation Department of Community Services Transportation Division October 7, 2019 The information presented here, and the public and agency input received, may be adopted or incorporated by reference into a future environmental review process to meet the requirements of the National Environmental Policy Act. 1

  2. Project Overview Background 1 in 3 chance of REGIONAL magnitude 8+ EARTHQUAKE earthquake RISK within 50 years CASCADIA SUBDUCTION ZONE (CSZ) EARTHQUAKE Last major quake in Oregon occurred 319 years ago, a timespan that exceeds 75% of the intervals between the major quakes to hit Oregon over the last 10,000 years. 2

  3. Project Overview Background – Why Burnside? 3

  4. Project Overview Purpose Create a seismically resilient Burnside Street lifeline crossing of the Willamette River that will remain fully operational and accessible for vehicles and other modes of transportation immediately following a major CSZ earthquake. Support the region’s ability to provide rapid and reliable emergency response, rescue and evacuation after a major earthquake, as well as enable post-earthquake economic recovery. Provide a long-term, low-maintenance and safe crossing for all users. 4

  5. Project Timeline 5

  6. Project Funding • Potential Funding Sources – County Vehicle Registration Fee (fund Planning, Design, Construction Phases) – Regional Metro T2020 bond measure (Construction Phase) – State/Federal (Construction Phase) • Multnomah County VRF – Currently $19/year (lowest of 3 Metro counties) – Proposed: raise to $56/year • County Board vote Nov. 2019 • Effective 1/1/2021 – D edicated to County’s Willamette River bridges – New $ targeted for Burnside Bridge 6

  7. Decision-making Framework 7

  8. Project Partners Project Partners 8

  9. Bridge Alternatives 9

  10. Bridge Alternatives Enhanced Seismic Retrofit 10

  11. Bridge Alternatives Enhanced Seismic Retrofit 11

  12. Bridge Alternatives High Fixed – Not Recommended for Further Study • From 97' to 147' of clearance • +/- 500' additional bridge length on both sides Existing 97’ 147’ 12

  13. Bridge Alternatives Replacement: High Fixed – Not Recommended for Further Study 13

  14. Bridge Alternatives Replacement: Movable Bridge 14

  15. Bridge Alternatives Replacement: Movable Bridge – NE Couch Connection 15

  16. Street Space Draft Cross Sections and Lane/Sidewalk Widths Retrofit ' ' ' ' ' ' ' ' ' Replacement ' ' ' ' ' ' ' ' ' 16

  17. Traffic Management During Construction Option 2: Option 1: Full bridge closure Temporary bridge (detour to other bridges) Bridge Use Data: • 30 feet inside width • 5’ cantilever sidewalks 17

  18. Traffic Management During Construction – Temporary Bridge Work Platforms Temporary Bridge Work Platforms Single: Recommended Double: Dismissed • Approximately half the width of existing bridge • + approximately $100 million to total project cost • + 1 year to construction duration 18

  19. Evaluation Criteria Draft Topics • Seismic Resiliency • Visual and Aesthetics • Community Quality of Life • Natural Resources, Climate Change and Sustainability • Equity and Environmental Justice • Pedestrians, Bicyclists & People with Disabilities • Crime Reduction and Personal Safety • Motor Vehicles, Freight & Emergency Vehicles • Business and Economy • Parks and Recreation • Historic Resources • Transit • Fiscal Responsibility 19

  20. Summer/Fall Outreach Key Activities • Online open house (ended Oct. 4) • Briefings • Tabling • Multi-Lingual Outreach • Social Media • E-newsletters and News Release 20

  21. Key Engagement Milestones 21

  22. Questions Thank you! 22

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend