Regi gion 1 on 1 Sum Summer r Cons onstru ruct ction Proj Project cts Up Updates ~ 2019 19 ~ Matt Freitag, Area Manager West Shelli Romero, Area Manager Central Paul Scarlett, Area Manager East 2 3 2019 P 2019


  1. Regi gion 1 on 1 Sum Summer r Cons onstru ruct ction Proj Project cts Up Updates ~ 2019 19 ~

  2. Matt Freitag, Area Manager West  Shelli Romero, Area Manager Central  Paul Scarlett, Area Manager East  2

  3. 3

  4. 2019 P 2019 Proje jects by by Area rea  West – Matt Freitag  OR99W: Lane St (Portland) – Naeve St (Tigard)  OR8 Pedestrian Crossing Upgrade at 44 th /45 th  OR8 at OR219 Intersection Improvements  Central – Shelli Romero  US26: Outer Powell: SE 122 nd – SE 136 th  I-5 Variable Speed Signs: Marine Drive to Fremont  I-405: Fremont Bridge Joint Replacement  Marquam Bridge Electrical  East – Paul Scarlett  OR99E: Railroad Tunnel Illumination & VMS sign  I-205: OR 224 (Sunrise Expressway) to Sunnyside Blvd.  I-205: Johnson Creek Blvd. to Glenn Jackson Bridge, Phase 1& I-205: Johnson Creek Blvd. to Glenn Jackson Bridge, Phase 2  I-84: Graham Road Bridges  R1 High Friction Surface Treatment  OR35 at MP 63.72 and MP 72.9  281: Hood River County Intersection Improvements

  5. OR R 99W 99W: Lane S Str treet t (Portland) –S. S.W. N Naev eve St St ( (Tigard) Traf Tr affic I Impact acts Project E t Eleme ments nts Sche hedul ule Lane closures Sidewalk infill Bids Opened 4/11/19 • • • Crosswalk closures Relocate bus stop Construction 2019 • • • Temp transit impacts Upgrade ADA ramps Completion 2020 • • •

  6. th Ave. OR 8 OR 8 Pede destria ian C Cros rossin ing U Upgr pgrade at at S S.E. E. 44 44 th th /45 45 th e. Project E t Eleme ments nts Tr Traf affic I Impact acts Sche hedul ule New flashing beacon Noise Bids Opened 5/9/19 • • • Improve lighting Lane closures Construction 2019 • • • Upgrade ADA ramps Crosswalk closures Completion 2020 • • •

  7. OR 8 R 8 at at OR 219 R 219 Int ntersec ection I Impro provem emen ents . Project E t Eleme ments nts Sche hedul ule Tr Traf affic I Impact acts New signals & Bids Opened 5/9/19 Noise • • • signs Construction 2019 Lane closures • • Upgrade ADA Completion 2020 Crosswalk closures • • • ramps Left turn lanes • 7

  8. Marqua Ma rquam B Brid ridge E e Elec lectrical . Sch Schedule & & Tr Traf affic I Impact acts Project E t Eleme ments nts Construction starts summer 2019 • Replace outdated electrical • Nighttime lane closures • Replace lighting systems • No construction during large public events in • the area or major holidays. 8

  9. nd to SE 136 US26: Out US Outer Po er Powel ell: S SE 122 nd 136 th th Project E t Eleme ments nts New curbs and separated bicycle lanes Add sidewalks • • Center turn lanes for safer turns, reducing Improve crosswalks • • back-ups Pedestrian activated mid-block crossings • Improved stormwater management • 9

  10. nd to S U.S .S. 26 . 26: Out Outer er Po Powel ell: S SE 122 nd SE 136 136 th th Tra raffic ic Imp mpacts ts Sche hedul ule Construction: May-fall 2020 Nighttime single lane closures with Landscaping: Spring 2021 flaggers. 10

  11. I-5 5 Varia riable le Speed Signs: Marin rine Drive to Fre remo mont Project E t Eleme ments nts • Install new ODOT RealTime signs ○ Advisory Speed signs ○ Traveler Information signs • Relocated guide signs to: Assist in reducing crashes o Improve travel time reliability o Enhance transit operations o Traf Tr affic I Impact acts • Nighttime construction • Noise during work hours • Intermittent on-and off-ramp closures in both directions • 2-4 nighttime full closures of I-5 in both directions • 1 week closure of the Alberta Street northbound on-ramp and southbound off-ramp Sche hedul ule . Fall 2019-Summer 2020 11

  12. I-405 05: : Frem remont B Bri ridg dge J e Join int R Repla eplacement West Side Side Project E t Eleme ments nts Replace and repair 42 bridge joints • Traf Tr affic I Impact acts Nighttime, weekend and extended on- • and off-ramp closures. Sidewalk & lane closures below the • freeway when work is performed above. Intermittent of on- and off-ramp • closures: ○ Nighttime and weekends ○ Approximately 25 total weekend closures (Fri 8PM-Mon 10AM) Extended closures: • ○ US30 East to I-405 SB, 11 days ○ US30 EB to I-405 NB, 18 days 12

  13. I-405: F Frem remont B Bri ridg dge J e Join int R Repla eplacement East Side t Side Tra raffic ic Imp mpacts ts Nighttime, weekend and • extended on- and off-ramp closures. Sidewalk and lanes closures • below the freeway when work is being done from above. Intermittent nighttime and • weekend on-and off- ramp closures. Sche hedul ule Construction March 2019 – fall 2020 13

  14. OR OR99E R Railr ilroad T Tunnel unnel I Ill llum umination & n & VMS MS Sig ign Project E t Eleme ments nts Add new LED Tunnel Lighting • Install a Variable Message sign • south of the tunnel Sche hedul ule Construction February-Summer 2019 Traf Tr affic I Impact acts Night time closures with • flagging Daytime weekday closures • 9 a.m.-3pm Periodic night time closure of • tunnel 14

  15. I-205: S Sunr unrise Expre xpressway t to Sunn unnyside de B Blv lvd Project E t Eleme ments nts Traf Tr affic I Impact acts Paving and adding Nighttime lane closures • • 8 p.m.to 5 a.m. auxiliary lane Install two new sign • structures Sche hedul ule Stormwater and water • February 2019 to • evaluation Summer 2020 15

  16. I-205: J Johns hnson C Creek reek Blv lvd t d to Glenn lenn J Jackson B Br Phas ase 1 e 1-Aux Auxil ilia iary ry Lanes nes & Paving ing Project E t Eleme ments nts Paving I-205 • Southbound auxiliary lane • (I-84 EB – Division/Powell) Northbound auxiliary lane • (I-84 EB – Killingsworth off ramp) Repair and replace bridge • joints Install ADA ramps at Glisan, • Washington, Stark, JCR and Foster and Woodstock Tr Traf affic I Impact acts Week night lane, ramp and • shoulder closure from 8 p.m. to 5:30am Sche hedul ule March 2018-November 2019

  17. I-205: J Johns hnson C Creek reek Blv lvd t d to Glenn lenn J Jackson B Br Phas ase 2 e 2 Auxili iliary ary L Lanes nes & & ODOT RealT lTim ime Signs Project E t Eleme ments nts Auxiliary lane (Powell –to • I-84 WB) Sign Structures • RealTime Signs • Full weekend closure (Aug. 2-5, • 2019) Traf Tr affic I Impact acts Weeknight lane closures 8 p.m. to • 5:30am Full weekend closure of • northbound lane at Division 8/2- 5/10 from 10pm to 5am Sche hedul ule February 2019 – Fall 2019

  18. I-84: Gra raha ham R Road B d Brid ridges Project E t Eleme ments nts Replace I-84 bridge to • increase the vertical clearance for large trucks Widen Graham Road to • three lanes Increase vertical • clearance for trucks Improve bicycle and • pedestrian access under on Graham Road Sche hedul ule February 2019 to Winter 2020 Tr Traf affic I Impact acts Nighttime single lane closures Week 10:00 p.m. to 5:30 a.m.

  19. OR35 at R35 at M MP 63.72 63.72 an and MP 72.9 72.9 Project E t Eleme ments nts Mt Hood Meadows Rock & tree removal on slope • Slope Stabilization • Hood River Canyons/”The Narrows” Remove rocks • Repair & maintenance to existing rockfall • catchment fence Sche hedul ule Summer to Fall 2019 Tr Traf affic I Impact acts Daytime single lane closure managed by flaggers

  20. Hood River County Intersection Improvements Project E t Eleme ments nts Widening of 2 intersections to accommodate truck turning • Country Club Road at Barrett Drive • Tucker Road (OR 281) at Guignard Drive • Tr Traf affic I Impact acts Flaggers directing traffic at either/both intersections during daylight hours Sche hedul ule March 2019 - Summer 2019

  21. Partne ners rship w hip with L h Law En Enfor orceme ment t To ensu sure sa safety ty for r work rkers a and nd the he publi public!

  22. Wher here t e to get et more I re Inf nformation: TripCheck.com For more information please visit: www.Oregon.gov/ODOT/HWY/ Region1/Pages/ProjectPage.aspx

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.