RE SIDE NT IALRAINWAT E R HARVE ST ING PROJE CT AL T IT - - PowerPoint PPT Presentation

re side nt ialrainwat e r harve st ing proje ct
SMART_READER_LITE
LIVE PREVIEW

RE SIDE NT IALRAINWAT E R HARVE ST ING PROJE CT AL T IT - - PowerPoint PPT Presentation

1 RE SIDE NT IALRAINWAT E R HARVE ST ING PROJE CT AL T IT UDE E NGINE E RING, INC. RS: HAYL I E BRE WE R, E RI CA K I E SOW,& BRE T T HI GHT OWE R PRE SE NT E : APRI L 19 T H , 2016 DAT E PROJE CT


slide-1
SLIDE 1

RE SIDE NT IALRAINWAT E R HARVE ST ING PROJE CT

AL T IT UDE E NGINE E RING, INC. PRE SE NT E RS: HAYL

I E BRE WE R, E RI CA K I E SOW,& BRE T T HI GHT OWE R

DAT E : APRI

L 19T

H, 2016

1

slide-2
SLIDE 2

PROJE CT PURPOSE

 De sig n a nd imple me nt a

ra inwa te r ha rve sting c a tc hme nt syste m

 Use sto rm wa te r to irrig a te

c lie nt’ s ve g e ta b le g a rde n, a nd supply to ile t flushing wa te r

 Re duc e wa te r utility c o st  Minimize po ta b le wa te r usa g e

2

F igur e 1: Rainwate r Har ve sting Sc he matic

slide-3
SLIDE 3

PROJE CT BACK GROUND

 Clie nt: Pro fe sso r Ala ric k Re ib o ldt, E

I T , ME NG, L e c ture r

 L

  • c a te d in K

a c hina Villa g e

3

F igur e 2: Re side ntial Pr

  • je c t Site

So urc e : “K a c hina Villa g e .” 35°06’ 37.55” N 111°42’ 27.60”W. Go o g le E a rth. 2016.

F igur e 3: Existing Gar de n Site

slide-4
SLIDE 4

T E CHNI CALCONSI DE RAT I ONS

Ciste r n De sign

 Prima ry Sto ra g e fo r distrib utio n

syste m

 Co nstruc tio n ma te ria ls will b e

c o nstra ine d b y b udg e t

 Size o f c iste rn will de pe nd o n the

de ma nd fo r b o th the irrig a tio n a nd to ile t use

 Ciste rn Sta b ility/ L

  • a d-Be a ring

Ca pa c ity

Pump Se le c tio n Spe c ific atio ns

 Re q uire d po we r, flo w, pre ssure

he a d

De te r minatio n and De line atio n o f Catc hme nt Sur fac e

 Slo pe a nd a re a o f ro o f  Runo ff pre c ipita tio n ro ute 

Ir r igation Distr ibution Analysis

 Gra vita tio na l vs. Pre ssurize d 

Ge o te c hnic al Aspe c ts

 Dra ina g e b e ha vio r  I

nflue nc e o f wa te r o n the pro po se d c iste rn

4

slide-5
SLIDE 5

ST AK E HOL DE RS

Clie nt, AL ARICK RE IBOL DT

 E

nd use r o f the ra inwa te r ha rve sting syste m

 Using fina l de sig n to irrig a te ve g e ta b le g a rde n a nd will pro vide a

b a thro o m wa te r so urc e

 Crite ria fo r the de sig n is spe c ifie d b y the c lie nt 

Co c o nino Co unty Co mmunity

 Munic ipa lity a s a who le c a n b e a ffe c te d b y the ra inwa te r ha rve sting

pro c e ss

 T

he ra inwa te r c o lle c te d will no t b e a b le to re c ha rg e the Co c o nino a q uife r

AL T IT UDE E NGINE E RING, INC. PROJE CT ST AF F

 Re spo nsib le fo r de live ring a c o mple te d de sig n  Re puta tio ns a s future E

ng ine e rs

5

slide-6
SLIDE 6

SCOPE OF SE RVI CE S

T ask 1.0 F ie ld E valuatio n

 T

a sk 1.1 Site E va lua tio n: Ge ne ra l I nspe c tio n

 T

a sk 1.2 Site E va lua tio n: Struc tura l

T ask 2.0 De sign Standar ds, Spe c ific atio ns, and Co de s

 T

a sk 2.1 De sig n spe c ific a tio ns fo r fre e ze pre ve ntio n fo r wa te r utilitie s

 T

a sk 2.2 Ha rve sting limita tio ns

6

T ask 3.0 De sign: Catc hme nt Syste m

 T

a sk 3.1 Ro o f Runo ff

 T

a sk 3.2 Gutte r Co lle c tio n Syste m De sig n

 T

a sk 3.3 Co nve ya nc e Syste m De sig n

 T

a sk 3.4 F irst F lush/ Disinfe c tio n Syste m De sig n

T ask 4.0 Ciste r n

 T

a sk 4.1 Ca pa c ity

 T

a sk 4.2 L

  • c a tio n

 T

a sk 4.3 Co nstruc tio n Ma te ria ls Spe c ific a tio ns

 T

a sk 4.4 Disinfe c tio n

 T

a sk 4.5 Co nc re te Sla b De sig n

slide-7
SLIDE 7

SCOPE OF SE RVI CE S, CONT I NUE D

T ask 7.0 Pr

  • je c t Manage me nt

 T

a sk 7.1 Clie nt, T e c hnic a l Adviso r a nd T e a m Me e ting s

 T

a sk 7.2 50% Re po rt

 T

a sk 7.3 90% Re po rt

 T

a sk 7.4 F ina l Pro po sa l

 T

a sk 7.5 F ina l Pre se nta tio n

 T

a sk 7.6 We b site

7

T ask 5.0 De sign: Bathr

  • o m Distr

ibutio n

 T

a sk 5.1 Distrib utio n De sig n

 T

a sk 5.2 Pump Se le c tio n a nd Spe c ific a tio n

 T

a sk 5.3 Sto ra g e T a nk

 T

a sk 5.4 Co nstruc tio n Ma te ria l

T ask 6.0 De sign: Ir r igatio n Distr ibutio n

 T

a sk 6.1 Pipe De sig n

 T

a sk 6.2 Pump Se le c tio n a nd Spe c ific a tio n

 T

a sk 6.3 Distrib utio n Syste m

slide-8
SLIDE 8

SCHE DUL E : GANT T CHART

8

slide-9
SLIDE 9

ST AF F I NG AND COST

Cla ssific a tion Code Se nior E ng ine e r

SE NG

E ng ine e r II

E NG I I

E ng ine e r I

E NG I

Ge ote c hnic a l T e c hnic ia n

GT E CH

Administra tive Assista nt

AA

T able 1: Staff Classific atio n and Co de T able 2: Pr

  • je c te d De sign Co sts

9

Cla ssific a tion Hours Billing Ra te , $/ hr Cost, $ SE NG

13 $ 170.00 $ 2,210.00

E NG II

117 $ 100.00 $ 11,700.00

E NG I

265 $ 65.00 $ 17,225.00

GT E CH

13 $ 22.00 $ 286.00

AA

45 $ 30.00 $ 1,350.00

T OT AL $32,771.00

slide-10
SLIDE 10

ST AF F I NG AND COST , CONT I NUE D

10

1.0 Field Evaluation 1.1 Site Inspection 2 8 2.0 Design Standards, Specs, Codes Research Coconino County Codes 3 16 3.0 Design Catchment System Roof Runoff 1 6 Gutter Collection System Design 8 12 Conveyance System Design 8 10 First Flush/ Disinfection System Design 7 15 4.0 Cistern Design Capacity 3 10 Location 3 6 Construction Material Specifications 8 10 Disinfection 4 12 Geotechnical Evaluation 8 Slab Design 10 30 5.0 Bathroom Distribution Design Distribution Design 10 20 Pump Selection and Specification 2 6 Storage Tank 10 20 Construction Material Specifications 4 8 6.0 Irrigation Distribution Design Pump Selection and Specification 2 6 Pipe Design 8 10 Distribution System 2 4 7.0 Project Management 7.1 Meetings 5 10 20 3 5 7.2 50% Report 2 4 15 2 10 7.3 90% Report 2 4 15 10 7.4 Final Proposal 2 4 3 5 7.5 Final Presentation 2 2 3 7.6 Website 15 Subtotal 13 117 265 13 45

Total 453

slide-11
SLIDE 11

QUE ST IONS?

Spe c ial thanks to Dr. Je ffre y He ide rsc he idt and Pro fe sso r Alaric k Re ib o ldt fo r the ir time , insig ht and e ffo rts in g uiding te am Altitude E ng ine e ring ’ s CE NE 476 pro je c t to wards suc c e ss.

11