Re-imagining KennecoE: RemediaCon and Maintenance
Douglas Bacon State Of Utah Dept. Of Environmental Quality Project Manager - KennecoJ ITRC – State Engagement Coordinator & Utah’s Point of Contact
1
Re-imagining KennecoE: RemediaCon and Maintenance Douglas Bacon State - - PowerPoint PPT Presentation
Re-imagining KennecoE: RemediaCon and Maintenance Douglas Bacon State Of Utah Dept. Of Environmental Quality Project Manager - KennecoJ ITRC State Engagement Coordinator & Utahs Point of Contact 1 KennecoE Response AcCon Overview
Douglas Bacon State Of Utah Dept. Of Environmental Quality Project Manager - KennecoJ ITRC – State Engagement Coordinator & Utah’s Point of Contact
1
General South Zone AcCons:
solid mine waste from residenCal, commercial and
groundwater.
General North Zone cleanup:
solid mine waste from accessible locaCons and during facility replacement
solid mine waste from ecologically sensiCve areas.
and sediment sampling.
Ongoing re-assessment
performance
Bingham Canyon Mine (Source: Rio Tinto Kenneco1)
2
3
4
OperaHonal Compliance with State Permits (Source: UDEQ) DemoliHon and Soil Management (Source: UDEQ) Source Assessment (Source: UDEQ) ExcavaHon & Removal (Source: UDEQ) Consolidate, Cap, and Monitor (Source: UDEQ) Source Control - Habitat Management (Source: UDEQ)
PreservaHon
(Source: UDEQ) RevitalizaHon of wetlands in the RevitalizaHon of Range Habitat North Zone (Source: UDEQ) (Source: Rio Tinto Kenneco1)
5
6
Bingham Creek Removal AcHon, 1995-1997 (Source: RTKC)
Lark Tailings ReclamaHon AcHon, 1995 – 1997 (Source: RTKC)
7
Reverse Osmosis Treatment System (Source: UDEQ) Source Control Measures – CollecHon Management of Extracted Core Waters System Cut-off walls (Source: UDEQ) (Source: UDEQ)
8
Daybreak
9
Bingham Creek (OU1) Channel Trail (Source: EPA)
10
South Jordan EvaporaHon Ponds, 1994-95 (Source: Kenneco1) South Jordan EvaporaHon Ponds, 1996 (Source: Kenneco1) Daybreak, 2006-07 (Source: Kenneco1) Mid Jordan Trax Line (Source: UDEQ) Near BasHan Sink (Source: UDEQ)
11