Re-imagining KennecoE: RemediaCon and Maintenance Douglas Bacon State - PowerPoint PPT Presentation

Re-imagining KennecoE: RemediaCon and Maintenance Douglas Bacon State Of Utah Dept. Of Environmental Quality Project Manager - KennecoJ ITRC State Engagement Coordinator & Utahs Point of Contact 1 KennecoE Response AcCon Overview


  1. Re-imagining KennecoE: RemediaCon and Maintenance Douglas Bacon State Of Utah Dept. Of Environmental Quality Project Manager - KennecoJ ITRC – State Engagement Coordinator & Utah’s Point of Contact 1

  2. KennecoE Response AcCon – Overview General South Zone AcCons: • ExcavaCon and removal of contaminated soil and solid mine waste from residenCal, commercial and other sensiCve locaCons. • ExtracCon, treatment, management of impacted groundwater. General North Zone cleanup: • ExcavaCon and removal of contaminated soil and solid mine waste from accessible locaCons and during facility replacement or demoliCon. • ExcavaCon and removal of contaminate soils and solid mine waste from ecologically sensiCve areas. • Monitor natural aEenuaCon and surface capture of groundwater. • Wetlands monitoring including biological, water Bingham Canyon Mine (Source: Rio Tinto Kenneco1) and sediment sampling. Ongoing re-assessment of remedy performance 2

  3. KennecoE North Zone 3

  4. North Zone RemediaCon Consolidate, Cap, and ExcavaHon & Removal OperaHonal Compliance with State Permits Monitor (Source: UDEQ) (Source: UDEQ) (Source: UDEQ) DemoliHon and Soil Source Control - Habitat Source Assessment Management Management (Source: UDEQ) 4 (Source: UDEQ) (Source: UDEQ)

  5. North Zone RemediaCon Success PreservaHon of Habitat (Source: UDEQ) RevitalizaHon of wetlands in the RevitalizaHon of Range Habitat North Zone (Source: UDEQ) 5 (Source: Rio Tinto Kenneco1)

  6. KennecoE South Zone Overview 6

  7. South Zone RemediaCon – General Solids Strategies • ExcavaCon and Removal • Capping • Re-grading / Land Bingham Creek Removal AcHon, 1995-1997 (Source: RTKC) Contouring • InsCtuConal Controls Lark Tailings ReclamaHon AcHon, 1995 – 1997 (Source: RTKC) 7

  8. South Zone RemediaCon – General Groundwater Strategies Reverse Osmosis Treatment System (Source: UDEQ) Source Control Measures – CollecHon Management of Extracted Core Waters System Cut-off walls (Source: UDEQ) 8 (Source: UDEQ)

  9. Daybreak – Master Planned Community Daybreak 9

  10. Daybreak Soil Management – Ongoing Efforts Daybreak, 2006-07 (Source: Kenneco1) South Jordan EvaporaHon Ponds, South Jordan EvaporaHon Ponds, 1994-95 1996 (Source: Kenneco1) (Source: Kenneco1) Near BasHan Sink Bingham Creek (OU1) Channel Mid Jordan Trax Line (Source: UDEQ) 10 Trail (Source: UDEQ) (Source: EPA)

  11. For More InformaCon, Contact Douglas Bacon State of Utah Dept. Environmental Quality Project Manager - KennecoJ ITRC – State Engagement Coordinator & Utah’s Point of Contact Phone: 801-536-4282 Email: dbacon@utah.gov 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.