Lak Lake Pir e Piru/Lo u/Lower er Pir Piru C u Creek eek Qua Quagga ga Contr Control ol Ef Effor orts ts The Quagga Mussel: Difficult and Expensive to Eradicate Al All l So Soluti lution ons s Come Come wi with th a Cost


  1. Lak Lake Pir e Piru/Lo u/Lower er Pir Piru C u Creek eek Qua Quagga ga Contr Control ol Ef Effor orts ts

  2. The Quagga Mussel: Difficult and Expensive to Eradicate Al All l So Soluti lution ons s Come Come wi with th a Cost a Cost & Cha & Chall llen enge ge

  3. Bac Backg kground ound & His & Histor tory- The Stor he Story y of of United United

  4. UNITED PURPOSE & BACKGROUND • Formed Under Water Conservation Act of 1931 • Manage Water Resources of Santa Clara River Watershed and Associated Aquifers • Facilities • Santa Felicia Dam & Lake Piru – Capture Winter Flows for Later Release for Aquifers Recharge • Freeman Diversion & Associated Aquifer Recharge Spreading Grounds • Surface Water Delivery Systems to Reduce Coastal Pumping & Associated Seawater Intrusion • Potential Future Recycled Water Distribution • Potential Future Seawater Desalination Facility

  5. UWCD FINANCIAL SETTING • Annual Operating Budget – Approx. $19 Million • Majority of Funding via Groundwater Replenishment Fees • Recent Litigation regarding Legal Basis of District’s Funding Mechanism • Water Conservation Act (Statute) Versus Voter Proposition 218 (Constitution) • Appealed to California Supreme Court

  6. FINANCIAL SETTING CONTINUED • Approximately $300 Million pending Capital Improvement Projects requiring funding Significant Infrastructure Replacement & • Rehabilitation Projects Endangered Species Act-Related Projects for • Steelhead Trout Passage at Freeman Diversion • Current estimate for Quagga Monitoring & Control $300,000 per year

  7. Monitoring, Control & Prevention Efforts: Pre-infestation

  8. UWCD PREVENTION MEASURES: Pre-infestation • 2008 2008-pr prese esent: nt: Vess essel ins el inspe pection ction and and pr preven ention tion prog pr ogram am • Based on Lake Casitas prevention program, required all boats entering reservoir to be clean, drain and dry • 2008-2013 approximately 50,000 boats inspections were conducted (avg. of 7,500 per year) • 2010 2010-20 2013 13: : Ph Physica ysical l mon monitori itoring ng pr prog ogram am • Substrates were inspected at random intervals throughout the year to monitor for settlement & recruitment

  9. • Ed Educ ucation tion & T & Train aining ing (pr (pre- an and d po post st-inf infes esta tation tion) Provided watercraft inspection and decontamination • training to both UWCD staff and onsite concessions staff Provided visitors with educational handouts & flyers • upon entry (pre & post infestation) and installed prevention signage • En Enfor orce cemen ment t (La (Lake e Pir Piru par park k ser services of vices offi ficer cers) s) In 2012 the adoption of UWCD Ordinance 15 made it • unlawful to fail to undergo a vessel inspection prior to launching at Lake Piru or to import any fish, mollusk, or crustacean into the waterbody

  10. Containment, Control & Prevention Efforts: Post-Infestation

  11. Initial Discovery

  12. UW UWCD CD Con Conta tainmen inment, t, Con Contr trol ol & & Pr Preven ention tion: Pos ost-Inf Infes esta tatio tion Mussel Discovery: December 2013 • Monitor and quantify infestation • Quantify initial infestation (December 2013-February 2014) • Research Lake Piru’s physical and chemical conditions (December 2013-present) • Monitor spread of infestation (substrates & visual monitoring of lake, creek & river)

  13. UWCD UW CD Con Conta tainmen inment, t, Con Contr trol ol & & Pr Preven ention tion: Pos ost-Inf Infes esta tatio tion, n, co cont ntinu inued ed • Implement integrated pest management (IPM) program • Use least hazardous tactics first • Removal from critical infrastructure via hand scraping, drying & disposal (more than 10,000 lbs. to date) • Tarping to create anoxic conditions (round #1 installed: Aug. – Sept. 2014) • Developed and submitted draft Monitoring & Control Plan to CDFW (Draft #1 in Fall of 2014)

  14. Recent Efforts: What We Are Doing Now

  15. United’s More Recent Efforts • Oct October ober 2015 2015 • United submitted 2 nd draft Quagga Mussel Monitoring & Control Plan (QMMCP) to CDFW • Febr bruar uary y 2016 2016 • CDFW provided comments on QMMCP . • Cited non-compliance with CDFW Code 2301 & 2302. • Febr bruar uary-Pr Present esent 2016 2016 • We are considering modifications to QMMCP (hired consultant) • We are evaluating more extensive control and containment options • April pril 201 2016 • United met with CDFW, NMFS, and FERC to discuss options for control and containment

  16. Con Contr trol ol & & Con Conta tainmen inment t Opt Options ions: Wha hat t Is Being Is Being Eva Evalua luate ted? d? 1. Modify lake levels • Goal is to desiccate mussels by lowering the lake level periodically 2. Use cone valves to destroy veligers through turbulence • Contracting with Consultant to evaluate 3. Modify outlet works to increase turbulence to control the spread of live veligers out of Lake Piru 19

  17. Control & Containment Options, Continued 4. Modify releases from lake 5. Use Zequanox or another chemical treatment to kill mussels and veligers Developing application approach and costs • Identifying approvals needed to use Zequanox or • another product 6. Monitor Piru Creek and Santa Clara River 7. Analyze & Develop a Lower River Protection Plan

  18. MY MY NO NOTES TES

  19. QUAGGA MUSSEL INFESTATION-RELATED EXPENDITURES 01/01/2014 - 4/21/2015 Monitoring&Planning: Permits/Licens Vendors-Contractors Misc./Other Legal Salaries Materials/Goods es TOTAL United: Admin. $32,932.50 $32,932.50 United: Eng. $9,486.49 $9,486.49 United: EPCD $53,748.94 $349.18 $54,098.12 United: Rec $71,688.25 $71,688.25 United: O&M $791.39 $791.39 Materials/Goods $17,320.26 $17,320.26 Permits $195.00 $195.00 Misc/Other $3,689.98 $3,689.98 Legal $3,022.92 $3,022.92 Subtotal United Departments $ - $3,689.98 $3,022.92 $168,647.57 $8,834.72 $195.00 $184,390.19 UCSB-Carrie Culver $32,400.00 $32,400.00 Eco Marine/ Anghera $26,998.14 $26,998.14 Eco Marine/ Morris $41,845.25 $41,845.25 Cardno ENTRIX $51,840.25 $51,840.25 Subtotal $ Contractors/Vendors $153,083.64 $ - $ - $ - $ - - $153,083.64 TOTAL EXPENDITURES $153,083.64 $3,689.98 $3,022.92 $168,647.57 $17,699.44 $195.00 $337,473.83

  20. Implications of Options Considered 1.Reducing lake levels could negatively affect Recreation, boat ramps, marina operations, camping and recreational water deliveries • Stakeholder notification and consultation • Development of a plan for the temporary location of marina facilities and water treatment barge • Consider alternative water supply for recreation facilities • Consider operational adjustments to maintain minimum levels of recreation

  21. Implications of Options Considered 2. Could Trigger Permitting FERC license modification • • Consultation with NMFS • Consultation with USFWS • CDFW • California Department Of Pesticide Regulation • California Regional Water Quality Control Board • CEQA • NEPA

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.