Public Information Meeting Unser Blvd Sound Wall May 30, 2018 - - PowerPoint PPT Presentation

public information meeting unser blvd sound wall
SMART_READER_LITE
LIVE PREVIEW

Public Information Meeting Unser Blvd Sound Wall May 30, 2018 - - PowerPoint PPT Presentation

Public Information Meeting Unser Blvd Sound Wall May 30, 2018 Agenda Status of Project Sound Walls Recommended Sample Renderings of Wall Concept Construction Considerations Design Schedule and Process Noise Analysis Noise


slide-1
SLIDE 1

Public Information Meeting Unser Blvd Sound Wall

May 30, 2018

slide-2
SLIDE 2

Agenda

▲Status of Project ▲Sound Walls Recommended ▲Sample Renderings of Wall Concept ▲Construction Considerations ▲Design Schedule and Process

slide-3
SLIDE 3

Noise Analysis

▲Noise analysis warrants sound walls ▲Meets Feasible and Reasonable criteria

under FHWA

▲Results indicate walls reduce noise levels of

at least 5 dBA

slide-4
SLIDE 4

Noise Analysis Process

▲Noise levels are modeled

– Calibrated with noise measurements

▲2016 traffic count data used in the model

– Average Daily Traffic – 24,000

▲Actual speed limit of 40 MPH ▲Truck mix based on field data

slide-5
SLIDE 5

Recommendations

▲Combination of 9-foot and 6-foot walls ▲Replace existing backyard walls

slide-6
SLIDE 6

Sound Walls Recommended

slide-7
SLIDE 7

Rendering of Wall Concept 9’ Backyard Wall

slide-8
SLIDE 8

Rendering of Wall Concept 6’ Backyard Wall

slide-9
SLIDE 9

Rendering of Wall Concept Northbound Unser

9’ Wall 6’ Wall

slide-10
SLIDE 10

Rendering of Wall Concept Southbound Unser

6’ Wall 9’ Wall

slide-11
SLIDE 11

Potential Construction Considerations

▲Landscaping

– In-kind replacement of soil, rocks, ground cover

▲Protect Structures near existing walls

– Identify and work with land owners

▲Tie-in of fencing and walls

slide-12
SLIDE 12

Potential Construction Considerations

▲Pets

– Temporary fencing and Communication

▲Security

– Temporary fencing

▲Access control concerns

– Driveways are not permitted off of an arterial roadway

slide-13
SLIDE 13

Design Schedule and Process

▲Property owner meetings – Summer 2018 ▲Design completion – Fall 2018 ▲Public meeting – Winter 2018

– Potential opportunity for aesthetic input

▲Construction funding and update

– Potential for construction of additional 6-ft Eastside wall

slide-14
SLIDE 14

Questions?

Denise Aten

daten@bhinc.com

Amanda White

awhite@bhinc.com

County Contact

Estevan Gonzales

egonzales@bernco.gov