PUBLIC INFORMATION CENTRE NO.1 FEBRUARY 19, 2020 CAMBRIDGE RIVER - PowerPoint PPT Presentation

RIVER ROAD SECONDARY PLAN PUBLIC INFORMATION CENTRE NO.1 FEBRUARY 19, 2020 CAMBRIDGE RIVER ROAD SECONDARY PLAN PRESENTATION OVERVIEW 1. Introduction 2. Background Review 3. Tonights Working Session 4. Next Steps CAMBRIDGE RIVER ROAD


  1. RIVER ROAD SECONDARY PLAN PUBLIC INFORMATION CENTRE NO.1 FEBRUARY 19, 2020 CAMBRIDGE RIVER ROAD SECONDARY PLAN

  2. PRESENTATION OVERVIEW 1. Introduction 2. Background Review 3. Tonight’s Working Session 4. Next Steps CAMBRIDGE RIVER ROAD SECONDARY PLAN

  3. INTRODUCTION PROJECT TEAM CITY OF CAMBRIDGE FOTENN PLANNING + DESIGN Ute Maya-Giambattista Principal, Urban Design ASSOCIATED ARCHAEOLOGICAL Matt Reid MLS PLANNING ENGINEERING SERVICES INC. Principal, Planning + Policy Mark Stone Jeff Suggett Annie Veilleux Evan Truong Senior Policy Planner Transportation Lead Senior Cultural Heritage Specialist Senior Urban Designer Duane Lindner James Neilson Jennifer Maestre Servicing Lead Cultural Heritage Specialist Senior Planner Nicolas Carriere Brandon Lind Civil Technologist Urban Designer Domenic Di Flavio Engineering Technologist CAMBRIDGE RIVER ROAD SECONDARY PLAN

  4. INTRODUCTION STUDY AREA R i v e r R o a d / This Study will help develop a Secondary Plan and Servicing Strategy to facilitate development of the Skipton Crescent River Road Olivewood area. / This includes an assessment e v i of sanitary and r D Renner Drive n water servicing, e k stormwater Speed River e d e a M management, o c R M transportation, the e Alderson Dr Endeavour Drive n i natural and built l n Karalee Cres w Melran Drive environment and Gibbs St o T land use planning. Melran Drive Elma Place Flynn Av CAMBRIDGE RIVER ROAD SECONDARY PLAN CAMBRIDGE RIVER ROAD SECONDARY PLAN

  5. INTRODUCTION STUDY OVERVIEW 1. Background Review 2. Transportation Assessments 3. Servicing and Water Assessment 4. Land Use Options 5. River Road Secondary Plan CAMBRIDGE RIVER ROAD SECONDARY PLAN

  6. INTRODUCTION STUDY PROCESS WE ARE HERE Kick-Off Public Public Public Council Meeting Consultation #1 Consultation #2 Consultation #3 Meeting Phase 2: Phase 3: Phase 1: Emerging Secondary Background Options Plan Review Nov Apr May Jun Feb Public Open House Public Workshop Public Open House Statutory Public Meeting CAMBRIDGE RIVER ROAD SECONDARY PLAN

  7. BACKGROUND REVIEW WALKING TOUR CAMBRIDGE RIVER ROAD SECONDARY PLAN

  8. BACKGROUND REVIEW POLICY CONTEXT City of Cambridge WE ARE HERE Offjcial Plan City of Cambridge Consolidation Offjcial Plan 1987 2015 2020 2012 2018 City of Cambridge River Road Region of Waterloo Zoning By-law 150-85 Secondary Plan Offjcial Plan (As Amended) (OMB Approved) CAMBRIDGE RIVER ROAD SECONDARY PLAN

  9. BACKGROUND REVIEW POLICY CONTEXT STATION RD D Region of Waterloo F OU N T A I N Offjcial Plan S T Map 3a: Urban Area D County of R H T U S S O Wellington G K r a n d River HWY 401 TO TORONTO RD MAPLE GROVE RD r e v i R S T d e e p S H W Y 4 0 1 PINEBUSH RD Urban Area Boundary T O W N T L S E L I G N A E E Built-up Area PKY R D A K R I N E G M S BISHOP ST A N - T Urban Designated Greenfjeld Area HES CA P ELER CORONATION ST FRANK NTAIN R F O U D B CAMBRIDGE RIVER ROAD SECONDARY PLAN

  10. BACKGROUND REVIEW POLICY CONTEXT City of Cambridge Offjcial Plan Map 1A: Urban Structure Study Area Built up Area Designated Greenfjeld Area CAMBRIDGE RIVER ROAD SECONDARY PLAN

  11. BACKGROUND REVIEW POLICY CONTEXT City of Cambridge Offjcial Plan Map 2: General Land Use / Permitted Dwelling Types: Single detached dwellings, townhouses, walk up apartments / 40-units per/hectare maximum density Study Area Low/Medium Density Residential Natural Open Space System CAMBRIDGE RIVER ROAD SECONDARY PLAN

  12. BACKGROUND REVIEW POLICY CONTEXT City of Cambridge Offjcial Plan Map 9: Regional Environmental Features Study Area Signifjcant Valley Lands Core Environmental Features CAMBRIDGE RIVER ROAD SECONDARY PLAN

  13. BACKGROUND REVIEW POLICY CONTEXT r e e k S.4.1.227 City of Cambridge HENWOOD DR Zoning By-Law S D N L A T CR R I V E R R D R4 S.4.1.227 Permitted Dwelling Type (R2, R5 4.1.227 R2 R6 R4, R5, R6, RM4): OS1 T O W T O W / Single-Detached P T ON CR I E S K P U S P U S S R5 Speed River RM4 S.4.1.187 R2 Permitted Dwelling Type (RM4): R5 OLIVEWOOD Hespeler Mill Pond WAY (H)R4 RM4 / Semi-detached R2 S.4.1.187 R5 MCMEEKEN DR / Townhouses RM4 R5 S.4.1.187 OS1 R4 S.4.1.232 / Duplex, Triplex, Fourplex R E N N E R D R R6 R D R6 S.4.1.232 RM4 N O S.4.1.187 R4 S / Mixed Terrace R R6 E D R5 R6 L E N D E A V A O U R D R KARALEE CRE R2 S R5 OS4 Red Wildfong Park R5 R5 R6 Low Density Residential (R) R4 G IBB ST R6 R6 R5 R6 R4 Medium High Density Residential (RM) R6 M E LRAN DR R5 R6 R2 R5 UEEN E CAMBRIDGE RIVER ROAD SECONDARY PLAN

  14. BACKGROUND REVIEW ENVIRONMENTAL CONTEXT Natural Environment and Environmental Features, based on: / Current information from Grand River Conservation Authority (GRCA) for wetlands, woodlands, fmoodplain, etc. To be refjned through an Environmental Impact Statement (EIS) associated with a development (GRCA) application CAMBRIDGE RIVER ROAD SECONDARY PLAN

  15. BACKGROUND REVIEW CULTURAL HERITAGE CONTEXT Existing and potential cultural heritage resources 11 CAMBRIDGE RIVER ROAD SECONDARY PLAN

  16. BACKGROUND REVIEW CULTURAL HERITAGE CONTEXT Designated - Part IV CHR1 537 River Road CHR10 4790 Townline Road CAMBRIDGE RIVER ROAD SECONDARY PLAN

  17. BACKGROUND REVIEW CULTURAL HERITAGE CONTEXT Potential Cultural Heritage Resources (Examples) CHR2 413 River Road CHR5 404 River Road CHR8 430 River Road Potential Cultural Heritage Resources that may merit evaulation to determine whether they contain cultural heritage value. CAMBRIDGE RIVER ROAD SECONDARY PLAN

  18. BACKGROUND REVIEW TRANSPORTATION CONTEXT Objectives / Base Year (2020) Background Traffjc Conditions / Horizon Year (2031) Background Traffjc Conditions / Horizon Year (2031) Development Traffjc Conditions / Horizon Year (2031) Total Traffjc Conditions CAMBRIDGE RIVER ROAD SECONDARY PLAN

  19. BACKGROUND REVIEW TRANSPORTATION CONTEXT Base Year (2020) RIVER RD RIVER RD Background Level of A (B) A (A) Service AM (PM) Peak RIVER ROAD A (A) SECONDARY PLAN Hour TOWNLINE RD A (A) GUELPH AVE B (B) GUELPH AVE M ELRAN D R M ELRAN D R M ELRAN D R A (B) D (C) D (F) A (A) D ( A (A) C (D) A (B) QUEEN STREET W STREET QUEEN STRE QUEEN STREET E A (C) A (A) D ( A DAM S TREET A (B) ) A (C) COOPER STRE D (F) A (A) TOWNLINE RD A (A) D (F) D (D) A (B) A (A) D (F) COOPER STREET A D ( DAM S TREET D ( D ( D ( D (F) D ( D (F) D (F) CAMBRIDGE RIVER ROAD SECONDARY PLAN A (A) A A (A) D ( A A D ( D ( A D ( A D ( D (F) D (F) D (C) D (F) D (F) A D ( A D ( A A D ( D (

  20. BACKGROUND REVIEW TRANSPORTATION CONTEXT Existing Weekday Morning and Afternoon Peak Traffjc Periods Intersection Weekday Morning (AM) Peak Weekday Afternoon (PM) Peak River Road and Townline Road 7:30 am – 8:30 am 4:45 pm – 5:45 pm River Road and Melran Road 8:00 am – 9:00 am 4:45 pm – 5:45 pm Melran Road and Townline Road 7:45 am – 8:45 am 4:45 pm – 5:45 pm Queen Street East and Cooper 7:45 am – 8:45 am 4:30 pm – 5:30 pm Street Queen Street East/ West and 7:30 am – 8:30 am 3:00 pm – 4:00 pm Guelph Avenue/ Adams Street CAMBRIDGE RIVER ROAD SECONDARY PLAN

  21. BACKGROUND REVIEW SERVICING CONTEXT Objectives To provide a viable municipal servicing strategy for the future development of lands adjacent to River Road, including: / Municipal potable water supply; / Sanitary servicing; and / Storm drainage and storm water management. CAMBRIDGE RIVER ROAD SECONDARY PLAN

  22. BACKGROUND REVIEW SERVICING CONTEXT - DRAFT - Study Area LEGEND Storm Sanitary Watermain RF Cables Butternut Tree (25m Buffer) Floodplain Fiber Optics Wetlands Servicing Assessment - Existing Conditions CAMBRIDGE RIVER ROAD SECONDARY PLAN

  23. BACKGROUND REVIEW SERVICING CONTEXT Servicing Considerations / Ensure capacity for water servicing / Ensure sanitary sewer sizing is based on peak fmows / Stormwater management consistent with Master Storm Drainage Study / Grading achieves overland fmow from development limits CAMBRIDGE RIVER ROAD SECONDARY PLAN

  24. 2 River Road BACKGROUND REVIEW OPPORTUNITIES 5 2 Townline Road 1 S k 1 - Vacant Parcels and Potential 5 i d o p o w e t v o l i O 2 n C Soft Sites r e s 5 c e n t 2 1 2 - Improved Vehicular, Cycling and McMeeken Drive Renner Drive 3 Pedestrian Connections 1 Speed River 3 - Appropriate Transitions to 3 2 Existing Residential s e C r e e a l r a K 4 A l 4 - Improved Streetscapes and d Endeavour Drive e r s o n Public Realm D Gibbs St r 5 5 - Improved Views and Melran Drive 3 Connections to River and Natural Features 1 CAMBRIDGE RIVER ROAD SECONDARY PLAN

  25. BACKGROUND REVIEW OPPORTUNITIES Potential to Enhance ~306 ~292 Views and Vistas 1 2 1 4 2 3 River Rd Melran Dr 5 6 Townline Rd 3 4 5 6 CAMBRIDGE RIVER ROAD SECONDARY PLAN

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.