Princeton Wastewater Servicing Study
Public Information Centre No 2 Public Information Centre No. 2 April 11, 2012
Slide 1
Princeton Wastewater Servicing Study Public Information Centre No 2 - - PowerPoint PPT Presentation
Princeton Wastewater Servicing Study Public Information Centre No 2 Public Information Centre No. 2 April 11, 2012 Slide 1 Water System Update System will be commissioned in May and ready for connections All properties will receive
Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Existing Data Collection Review and Analysis Phase 1 Problem or Opportunity Development and Evaluation of Alternative Solutions Analysis Problem or Opportunity Phase 2 Alternative Solutions
Princeton Wastewater Servicing Study
Development and Evaluation of Alternative Design Concepts for Implementation of the Phase 3 Alternative Design Concepts for Preferred Solution
We Are Here Servicing Study involves completion of Phases 1 to 4 of
Completion of an Environmental Study Report (ESR) and placement on public record for 30 day Design Concepts for Implementation of the Preferred Alternative Preferred Solution Phase 4 Environmental Study Report (ESR)
the Municipal Class EA process
(ESR) and placement on public record for 30‐day review period Design and Construction of the Preferred Solution (ESR) Phase 5 Implementation
Slide 6
Slide 7
Existing Septic Systems Number of systems that are now between 0 37 (18%) and 25 years old (Constructed between 1987 and the present) Number of systems that are now between 25 16 (8%) and 35 years old (Constructed between 1977 and 1987) Number of systems that are now more than 35 154 (74%) y years old (Constructed before 1977) ( ) Total number of systems 207 (100%)
Slide 8
Slide 9
Existing Septic Systems E ti t d b f ti h th i ti t i l 52 (25%) Estimated number of properties where the existing system is less than 35 years old (constructed in 1977 or later) 52 (25%) Estimated number of properties with existing systems more than 35 years old that can accommodate a conventional septic system 90 (43%) Estimated number of properties with existing systems more than 35 years old that can accommodate an advanced treatment system 52 (25%) Estimated number of properties with existing systems more than 35 12 (6%) years old that cannot accommodate a conventional or advanced treatment system and will require a holding tank Total number of systems 207 (100%)
Slide 10
Slide 11
Slide 12
500 1600
Total Population and Flow Projections for Community
250 300 350 400 450 500 800 1000 1200 1400 1600
pulation
50 100 150 200 200 400 600 Projected Flo Projected Pop Year
2011 Future
P Year
Residential and Non-Residential Population Flow Projection
Slide 13
Slide 14
Alternative Solution Description Alternative 1 – “Do Nothing” No action to address existing systems by either t th C t property owners or the County Alternative 2 – Upgrade Existing Private On-Site Wastewater Treatment Systems Upgrade existing systems to Class 4 or 5 systems to meet current Ontario Building Code requirements Individual property owners would
upgrade their systems when needed over time Alternative 3 – New communal wastewater collection system and wastewater Construction of lower cost septic tank effluent type wastewater collection system and new treatment collection system and wastewater treatment system to service Princeton wastewater collection system and new treatment facility in Princeton to collect and treat wastewater Alternative 4 – New wastewater collection system and diversion of wastewater for Construction of conventional sewers, a new pumping station, a new forcemain and upgrades y treatment to the Woodstock Wastewater Treatment Plant (WWTP) p p g pg at the Woodstock WWTP to convey and treat wastewater from Princeton at the Woodstock WWTP
Slide 15
Alternative Solution Description Alternative 5 – New wastewater collection Construction of conventional sewers, a new Alternative 5 New wastewater collection system and diversion of wastewater for treatment to the Drumbo Wastewater Treatment Plant (WWTP) Construction of conventional sewers, a new pumping station, a new forcemain and upgrades at the Drumbo WWTP to convey and treat wastewater from Princeton at the D b WWTP Drumbo WWTP Alternative 6 – New wastewater collection system and diversion of wastewater for treatment to the Paris WWTP Construction of conventional sewers, a new pumping station, a new forcemain and upgrades at the Paris WWTP to convey and treatment to the Paris WWTP upgrades at the Paris WWTP to convey and treat wastewater from Princeton at the Paris WWTP in Brant County
Slide 16
Slide 17
N t l E i t S i l E i t Natural Environment Impacts on water resources Impacts on terrestrial resources Social Environment Impacts on residents during operation Impacts on residents during construction Impacts on groundwater resources Technical Environment System complexity Impacts on future development Economic Environment Estimated capital cost System complexity Increased operating requirements Need for additional studies Estimated capital cost Estimated Annual O&M cost 20 Year Life Cycle Cost Approval requirements Risk Potential to stage implementation Need for property acquisition
Slide 18
Alternative Summary of Evaluation
Alternative 1 – “Do Nothing”
resources and groundwater systems Nothing resources, and groundwater systems.
Alternative 2 – Upgrade Private On-Site
Private On Site Wastewater Treatment Systems Development will be allowed to proceed on new lots in Village that can accommodate a septic system.
Building Code can be used to allow installation of a conventional system that does not meet the clearance requirements as long as the capacity of the new system does not exceed the old system capacity system capacity.
Alternative 3 New
Alternative 3 – New Communal Wastewater Collection System and Treatment System to Service Princeton
Slide 19
Alternative Summary of Evaluation
Alternative 4 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Woodstock Wastewater Treatment Pl (WWTP)
wastewater generated in the Grand River Watershed to be discharged to the Upper Thames River Watershed. C f $10 0 f f $10 6 Plant (WWTP)
Alternative 5 – New Wastewater Collection System and Diversion of Waste ater for Treatment to the
selection Wastewater for Treatment to the Drumbo WWTP selection.
Alternative 6 New Wastewater
Alternative 6 – New Wastewater Collection System and Diversion of Wastewater for Treatment to the Paris WWTP in Brant County
selection.
Slide 20
High impacts on water resources, groundwater resources,
High risk that the required intra-basin transfer exception will not
Slide 21
High Life Cycle Costs and requirements for additional study
Potentially high risk that negotiations could be unsuccessful Potentially high risk that negotiations could be unsuccessful
Slide 22
Slide 23
Alternative 2 – Upgrade Existing On-Site Wastewater Treatment Systems
Alternative requirements Replacement of existing systems with Class 4 and Class 5 systems that meet the current Ontario Building Code (OBC) requirements where existing systems have current Ontario Building Code (OBC) requirements where existing systems have exceeded their design life. Specific requirements are:
Estimated Capital Cost $3.0M (conceptual level cost estimate) Estimated Annual O&M Cost $127K (total cost to all residents) Potential Implementation Period Implementation would be the responsibility of individual property owners and would proceed on an as-needed basis as existing systems require replacement Concerns/ Issues with this Alternative
properties in the existing Village boundary can only proceed if the property can Alternative properties in the existing Village boundary can only proceed if the property can accommodate the installation of a Class 4 sewage system
property owners
Where OBC Compliance Alternatives are used to support the replacement of an existing system, no increase in capacity will be allowed
Slide 24
$10,000 $12,000 $14,000 Cost
$2,000 $4,000 $6,000 $8,000 Annual O&M C
$0 50 100 150 200 250 300 350 400 Wastewater Generation Rate (L/person/d) 1 Person Occupancy 2 Person Occupancy
3 Person Occupancy 4 Person Occupancy Slide 25
Alternative 3 – New Communal Wastewater Collection and Treatment System to Service Princeton
Alt ti i t C t ti f STEP/STEG l t t ll ti t Alternative requirements Construction of new STEP/STEG communal wastewater collection system, a new pumping station, and a Recirculating Sand Filter treatment facility with a subsurface discharge Estimated Capital Cost $7.2M (Conceptual level cost estimate) p ( p ) Estimated Annual O&M Cost $114K Potential Implementation Period Implementation of new treatment facility can be staged to meet servicing requirements q Concerns/ Issues with this Alternative Property acquisition will be required for a new treatment facility in Princeton Notes: 1. STEP/ STEG – septic tank effluent pumping system/ septic tank effluent gravity system 2. Estimated capital cost does not include costs of any works on private property (connection and interceptor tank) 3. Existing residents will receive CSAP funding and will pay $12,500/ connection. CSAP funding does not cover costs for required works located on private property
Slide 26
Costs Alternative 2 - Upgrade Existing Private On-Site Wastewater Treatment Systems Alternative 3 – New Communal Wastewater Collection System and Treatment System to Service Princeton Estimated Capital Cost $3.0M $7.2M Estimated Capital Cost/ Lot $6,500 - $17,500 depending on technology required $12,500 after CSAP (existing lots) $27,500 (development lots) $ $ Estimated Annual O&M Cost $127K $114K Estimate of Annual O&M Cost/Lot $100/yr - $13,000/yr depending on technology, water use and occupancy $544/existing lot/yr Estimated 20 Year Cost to Residents $4 7M $8 7M Estimated 20 Year Cost to Residents $4.7M ($22,800/existing lot) $8.7M ($24,700/existing lot)
Notes: 1. Community Servicing Assistance Plan (CSAP) funding will apply a 25% grant for the public sector costs for existing developed properties. 2. Alternative 2 costs will be borne directly by individual property owners. 3 Alt ti 3 t d t i l d t hi h ill b i d b t f i t t ti f t t t 3. Alternative 3 costs do not include any costs which will be incurred by property owners for private property portion of wastewater system connections. 4. Alternative 2 estimated 20 Year Cost to Residents includes present value of capital cost and the present value of individual systems operating costs over a 20 year period based on an interest rate of 4%. 5. Alternative 3 estimated 20 Year Cost to Residents includes present value of capital cost after the CSAP funding and the present value of wastewater rate fees over 20 year period based on an interest rate of 4% wastewater rate fees over 20 year period based on an interest rate of 4%. 6. Conceptual level cost estimates. Expected accuracy of -30% to +50%. 7. All costs are in 2012 dollars. CSAP funding will be indexed to construction costs in future.
Slide 27
Slide 28
Slide 29
Slide 30