PROPOSITION 1
FY 2015 Project Priorities
PROPOSITION 1
Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL.
1
PROPOSITION 1 PROPOSITION 1 Map tiles by CartoDB, under CC BY 3.0. - - PowerPoint PPT Presentation
FY 2015 Project Priorities PROPOSITION 1 PROPOSITION 1 Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL. 1 FY2015 Prop 1 Funds FY2015 Prop 1 Funds $1.74 billion deposited in Highway Fund $1.74 billion deposited in
Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL.
1
Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL.
2
Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL.
3
Map tiles by CartoDB, under CC BY 3.0. Data by OpenStreetMap, under ODbL.
4
$191M - $191M - Major ajor Freeway Freeway R i R i Reconstruct econstruction
$65M - $65M - Other ther Highway Highway Reconstruction Reconstruction $22M - $22M - Highway ighway Rehabilitation Rehabilitation Rehabilitation Rehabilitation $10M - $10M - Beaumont eaumont District Projects District Projects
5
1.
US 59 S
– Continue Reconstruction to Interstate Design
2.
US 290
– Finish Corridor Reconstruction to FM 2920
6
3. 3. FM 2234 FM 2234
– Widen Widen
4. 4. US 90A US 90A
– Widen
5. 5. FM FM 6 646 5. 5. 6 6 6 6
– Widen
6. 6. BW 8 BW 8
– Aux Lanes
7. 7. IH 45 IH 45 @ Allen @ Allen Pkwy Pkwy
– Reconfigure Ramp
8. 8. FM 2978 FM 2978
– Widen
9. 9. IH 69N IH 69N
– Construct Frontage Rd
7
10.
FM 523
– Base Repair & Overlay
11.
IH 45 S
– Overlay/Surface Treatment
12 12 FM 3083 FM 3083 12
FM 3083
– Base Repair & Overlay
8
13.
FM 1405
– Reconstruct Roadway
14.
IH 10 E
– Relocate Ramp Relocate Ramp
9
$191M - $191M - Major ajor Freeway Freeway R i R i Reconstruct econstruction
$65M - $65M - Other ther Highway Highway Reconstruction Reconstruction $22M - $22M - Highway ighway Rehabilitation Rehabilitation Rehabilitation Rehabilitation $10M - $10M - Beaumont eaumont District Projects District Projects