PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
PROPOSED MARKVILLE NORTH REDEVELOPMENT
Appendix 'B'
PROPOSED MARKVILLE NORTH REDEVELOPMENT Appendix 'B' JUNE 20, 2016 - - PowerPoint PPT Presentation
PROPOSED MARKVILLE NORTH REDEVELOPMENT Appendix 'B' JUNE 20, 2016 P E TR O FF PROPOSED MARKVILLE NORTH REDEVELOPMENT LEGEND STATISTICS CENTENNIAL STATION EXISTING MALL TOTAL LOT AREA: +/- 70.3 ACRES EXISTING SEARS (VACANT) ZONING
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
Appendix 'B'
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016 BUILDING ENTRANCES
MASTER PLAN - EXISTING CONDITION
EXISTING MALL EXISTING SEARS (VACANT) EXISTING VEHICULAR ACCESS EXISTING PEDESTRIAN ACCESS EXISTING TRANSIT STOP
LEGEND
MCCOWAN ROAD CENTENNIAL STATION INDUSTRIAL USE RESIDENTIAL USE CENTENNIAL COMMUNITY CENTRE
CF MARKVILLE
HIGHWAY 7 AUSTIN DRIVE BULLOCK DRIVE COMMERCIAL USE RESIDENTIAL USE INDUSTRIAL USE
STATISTICS TOTAL LOT AREA: +/- 70.3 ACRES ZONING DISTRICT: DISTRICT COMMERCIAL ZONE EXISTING MALL GLA: +/- 93,440 SM EXISTING PARKING: 5,078 SPACES
EXISTING SEARS +/- 12,136 SM / 2 FLOORS
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016 BUILDING ENTRANCES
STATISTICS TOTAL LOT AREA: +/- 70.3 ACRES ZONING DISTRICT: DISTRICT COMMERCIAL ZONE PROPOSED MALL GLA: +/- 95,091 SM PROVIDED PARKING: 5,068 SPACES
MASTER PLAN - PROPOSED
EXISTING MALL
REDEVELOPMENT AREA CENTENNIAL STATION INDUSTRIAL USE RESIDENTIAL USE CENTENNIAL COMMUNITY CENTRE
CF MARKVILLE
HIGHWAY 7 MCCOWAN ROAD AUSTIN DRIVE BULLOCK DRIVE COMMERCIAL USE RESIDENTIAL USE INDUSTRIAL USE
DEMOLISHED SEARS BOUNDARY NEW RETAIL NEW RESTAURANT NEW SECOND FLOOR OFFICE
LEGEND STATISTICS TOTAL LOT AREA: +/- 70.3 ACRES ZONING DISTRICT: DISTRICT COMMERCIAL ZONE PROPOSED MALL GLA: +/- 95,091 SM PROVIDED PARKING: 5,068 SPACES STATISTICS TOTAL LOT AREA: +/- 70.3 ACRES ZONING DISTRICT: DISTRICT COMMERCIAL ZONE PROPOSED MALL GLA: +/- 95,091 SM PROVIDED PARKING: 5,066 SPACES
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
MCCOWAN ROAD B U L L O C K D R I V E
DEMOLISHED SEARS BOUNDARY NEW RETAIL NEW RESTAURANT NEW SECOND FLOOR OFFICE
LEGEND
NEW VEHICULAR ACCESS (RI/RO) NEW PEDESTRIAN GATEWAYS NEW ENHANCED PEDESTRIAN WALKWAY
SITE PLAN
P O T E N T I A L P A D ( B Y T E N A N T ) + /
7 5 S M S E C O N D F L O O R O F F I C E + /
, 3 4 S M B U I L D I N G + /
, 7 6 4 S M L O B B Y 1 S T Y R E T A I L + /
, 1 1 9 S M U P P E R R E T A I L ( R E N O V A T E D S E A R S ) + /
, 5 3 5 S M B U I L D I N G + /
, 4 S M E X I S T I N G U P P E R M A L L 1 S T Y R E T A I L + /
, 7 6 6 S M
BUILDING ENTRANCES
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
BIRD VIEW - SOUTH WEST
ARTIST CONCEPT
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
VIEW DOWN THE PATH
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
BIRD VIEW - NORTH WEST
ARTIST CONCEPT
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
PROPOSED BUILDING MATERIALS:
ARTIST CONCEPT
VIEW OF RENOVATED SEARS
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016 ARTIST CONCEPT
VIEW TO SOUTH ELEVATION PROPOSED BUILDING MATERIALS:
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016 ARTIST CONCEPT
VIEW FROM INTERSECTION OF McCOWAN RD. & BULLOCK DR. EXISTING VIEW PROPOSED BUILDING MATERIALS:
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
VIEW FROM INTERSECTION TO GO TRAIN STATION EXISTING VIEW PROPOSED BUILDING MATERIALS:
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016 ARTIST CONCEPT
VIEW TO NORTH ELEVATION PROPOSED BUILDING MATERIALS:
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
Redevelopment Sustainable Design Features
SITE DESIGN
pedestrian, cycling and transit connections
WATER CONSERVATION
natural ground percolation at landscaped open spaces
xtures equipped with hands free sensors
proposed North landscaped area is under review.
ENERGY EFFICIENCY
ltration through the thermal envelope
ciency HVAC systems. Current energy management practices have yielded a 20% reduction in total mall energy usage. The existing BAS would tie into the new building for control and monitoring of all base building lighting and HVAC systems.
eld to proposed North green space and installation of of light coloured cool roofi ng at proposed buildings.
DURABILITY
ltration through rain-screen design and ventilated wall cavities
nishes including masonry and metal paneling
WASTE REDUCTION
would participate in the existing waste management programs.
BIRD FRIENDLY DESIGN & DARK SKY COMPLIANCE
vegetation so that vegetation does not refl ect in glass.
P E TR O FF
PROPOSED MARKVILLE NORTH REDEVELOPMENT
JUNE 20, 2016
Schedule & Timing
Window of opportunity is limited based on sequencing for this 20 month construction program to meet projected turnover dates for the new retail spaces:
.