Redwood Road in Saratoga Springs Project Update November 1, 2018 Phase 1 (Completed in 2017): Newly paved road from Village Parkway to the south 10 miles. Phase 2 (Completed in 2018): Five-lane roadway and bike lanes from 400 South


slide-1
SLIDE 1

Redwood Road in Saratoga Springs Project Update

November 1, 2018

slide-2
SLIDE 2

Phase 1 (Completed in 2017):

  • Newly paved road from Village

Parkway to the south 10 miles.

Phase 2 (Completed in 2018):

  • Five-lane roadway and bike lanes

from 400 South to Lake View Terrace Road.

  • Dual left-turn lanes at Grandview

Boulevard.

  • Multiuse trail from Pioneer

Crossing to 400 South.

slide-3
SLIDE 3

Phase 3 (Complete in 2019):

  • East-west Continuous Flow

Intersection (CFI) at Pioneer Crossing.

  • Five-lane roadway and bike lanes

from Lake View Terrace Road to Village Parkway.

  • Traffic signals at Ring Road and

Stillwater Drive.

slide-4
SLIDE 4

Residential to Commercial Connection:

  • Approximately two miles of a

new multiuse trail connects

  • ver four miles of existing trail.
  • This missing trail segment

connects residents to a fast growing commercial area.

slide-5
SLIDE 5

Continuous Flow Intersection (CFI) Overview Video:

slide-6
SLIDE 6

Continuous Flow Intersection (CFI) – Active Transportation Features

Green Thermoplastic Bike Ramp Bike Turn Box Pedestrian Refuge

slide-7
SLIDE 7

Questions and Comments