Programmatic Approach Presented by Arcadis May 2016 Programmatic - - PowerPoint PPT Presentation

programmatic approach
SMART_READER_LITE
LIVE PREVIEW

Programmatic Approach Presented by Arcadis May 2016 Programmatic - - PowerPoint PPT Presentation

Programmatic Approach Presented by Arcadis May 2016 Programmatic Approach Introduction Speaker: Scott Lumbrezer, PE W: 419 213 1634 M: 419 450 1560 E: scott.lumbrezer@arcadis.com Safety Comment Awareness of Changing Conditions About


slide-1
SLIDE 1

Programmatic Approach

Presented by Arcadis

May 2016

slide-2
SLIDE 2

Programmatic Approach

Introduction

Speaker: Scott Lumbrezer, PE Safety Comment

Awareness of Changing Conditions

W: 419 213 1634 M: 419 450 1560 E: scott.lumbrezer@arcadis.com

slide-3
SLIDE 3

About Arcadis

slide-4
SLIDE 4

Our Global Reach

North America

∼6,400

United Kingdom

∼3,700

Continental Europe

∼5,900

Middle East

∼2,200

Asia

∼5,000

Australia

∼600

27,000 people │ 400+ offices │ 40+ countries │ 30,000+ projects

Australia Abu Dhabi – UAE Bahrain Belgium Brazil Brunei Canada Chile China Czech Republic Dubai – UAE France Germany Hong Kong India Indonesia Italy Jordan Kazakhstan Korea Macau Malaysia Mexico Mozambique Netherlands Oman Peru Philippines Poland Qatar Romania Russia Saudi Arabia Serbia Singapore Slovakia Spain Switzerland Taiwan Thailand United Kingdom United States Vietnam Head Office ARCADIS NV ‘Symphony’ Gustav Mahlerplein 97-103 1082 MS Amsterdam P.O.Box 7895 1008 AB Amsterdam The Netherlands +31 (0)20 2011 011 info@arcadis.com www.arcadis.com

Our global network enables us to seamlessly bring our knowledge and experience

  • f projects worldwide and apply that expertise to specific local needs and

situations

LatAm

∼3,200

slide-5
SLIDE 5

Arcadis United States Coverage

Reno - 9 Las Vegas - 11 Portland - 28 Seattle – 45 Liberty Lake - 2 Helena - 12 Butte - 2 Buffalo - 23 San Louis Obispo - 23 Tucson - 13 Phoenix - 119 Scottsdale - 16 San Diego - 23 Carlsbad - 16 Roseville - 46

  • San Francisco, CA - 48
  • Emeryville, CA - 47
  • Walnut Creek, CA - 37
  • San Rafael, CA - 19
  • San Jose, CA - 26
  • Los Angeles, CA - 102
  • Long Beach, CA - 2
  • Riverside, CA - 5
  • Irvine, CA - 132

Boulder - 12 Denver - 20 Lakewood - 52 Highlands Ranch - 268 Lenexa - 24 Tulsa - 12 Little Rock - 4 Dallas - 25 Fort Worth - 12 Midland - 19 El Paso - 19 Austin - 30 San Antonio - 3 Corpus Christi - 5 Houston - 142 Lufkin – 5 Baton Rouge - 51 Metairie, LA - 16 Mobile - 10 Birmingham - 25

  • Boynton Beach – 57
  • Plantation, FL - 15

Pensacola – 3 Tallahassee - 25 Jacksonville - 67 Maitland - 11 Tampa - 93 Sarasota - 2 Kennesaw - 36 Atlanta – 184 Augusta

  • 12

Greenville - 24 Lexington - 19 Russellville - 2

  • Raleigh - 71
  • Durham - 13
  • Greensboro - 9
  • Charlotte - 9

Bluefield

  • 8

Minneapolis - 26 Milwaukee - 46 Hoffman Estates - 31 Chicago - 128 Indianapolis - 60

  • Ft. Wayne - 4 Toledo - 61
  • Detroit - 11
  • Lansing - 15
  • Brighton - 53
  • Novi - 74

Columbus - 106 Cincinnati - 43 Akron - 54 Cleveland - 35 Wexford - 70 Buffalo - 32 Chesapeake Area

  • Richmond, VA - 38
  • Newport News, VA - 41
  • Virginia Beach, VA - 10
  • Arlington, MD - 55
  • Washington DC - 3
  • Columbia, MD - 51
  • Annapolis,MD - 3
  • Millersville,MD - 41
  • Laurel, MD - 5
  • Baltimore, MD - 77

Philadelphia Area

  • Wilmington - 25
  • Philadelphia - 50
  • Newtown - 80

NJ - NYC Area

  • Cranbury, NJ - 54
  • Edison, NJ - 15
  • Branchburg, NJ - 34
  • Fair Lawn, NJ - 77
  • New York, NY - 71
  • Long Island City, NY - 43
  • Melville, NY - 31
  • White Plains, NY - 178

Syracuse - 269 Clifton Park - 97 MA – CT - RI

  • Middletown Ct - 49
  • Manchester, CT - 41
  • Springfield, MA - 7
  • Warwick, RI - 12
  • Braintree, MA - 19
  • Boston, MA - 9
  • Wakefield, MA - 14
  • Chelmsford, MA - 33

Knoxville - 33 Chattanooga - 57 Nashville- 7

  • Puerto Rico – 34,two offices
  • Anchorage, AK – 38
  • Honolulu, HI - 12
slide-6
SLIDE 6

Programmatic Approach – Why?

  • Drivers Creating the Demand
  • Economic Opportunities
  • Regulatory
  • Efficiencies
  • Safety
  • Technology
  • Specialized Expertise
  • Recognize Challenges Facing Organizations
  • Staffing constraints
  • Organizational structure
  • Speed to Market
  • Priority overload
slide-7
SLIDE 7

Benefits of a Programmatic Approach

Standardized Solutions Efficient Implementation Minimal Disruption to Current Workload

Drives Consistent Results

Result: Improve the value

slide-8
SLIDE 8

Key Components of a Programmatic Approach

  • Core Teams
  • Owner Operations Representative(s)
  • Planning/Engineering Resources
  • Equipment/Material Suppliers
  • Construction Contractor Resources
  • Communication with Stakeholders
  • Pilot Testing / Continuous Feedback

Plan Do Check Adjust

slide-9
SLIDE 9

Program Opportunities

  • New Markets/Customers
  • Increase/Optimize Thruput

Strategic Initiatives

  • Facility Integration

Acquisitions

  • Vapor Recovery Program

System Optimization

slide-10
SLIDE 10

Examples of Programs

  • Facility Drawing Updates
  • New Product/Additive Integration
  • Fire Protection Systems
  • Vapor Control Systems
  • Electrical Maintenance
  • Facility Integration
  • Pipeline Water Crossing
slide-11
SLIDE 11

Asset Management

  • Drawing Accuracy Verification
  • Valve/Equipment Identification
  • Maintenance Record Keeping
  • Pipe Integrity
  • System Analysis
  • Electrical Documentation/Validation
  • Cathodic Protection
  • Pavement Maintenance
slide-12
SLIDE 12

Regulatory Compliance

  • Fire Protection
  • SPCC Plans
  • Groundwater Monitoring
  • Air Permitting
  • Arc Flash
  • Leak Detection
slide-13
SLIDE 13

Other Programs

  • Technology Enhancements
  • Facility Automation
  • Safety
  • Fall Protection
  • Site Security Infrastructure
  • Construction Oversight
  • Electrical Safety
  • Coastal Resiliency
  • Incident Response
slide-14
SLIDE 14

Summary

  • Programmatic Approaches promote:
  • Standard Systems
  • Consistent Results
  • Repeatability
  • Speed to Market

Results lead to added value and improving your company’s bottom line

slide-15
SLIDE 15

Questions/Discussion

Scott Lumbrezer, PE | Program Manager | scott.lumbrezer@arcadis.com

  • T. +1 419 213 1634