Program Staging - Day 1, term 1, 2021 - Capacity for 750 students (additional 350 students) Day 1, Term 3, 2021 - Capacity for 1050 students Day 1, Term 1, 2022 - Completion stage - capacity for 2000 students In 2021 we will have... - Access
SLIDE 2
SLIDE 3
SLIDE 4
Program Staging -
Day 1, term 1, 2021 - Capacity for 750 students (additional 350 students) Day 1, Term 3, 2021 - Capacity for 1050 students Day 1, Term 1, 2022 - Completion stage - capacity for 2000 students
SLIDE 5
In 2021 we will have...
- Access to new learning spaces for Primary and Secondary students on
levels 4,3 and 2.
- 4 of 6 new specialist Science labs
- Maker Spaces and Lab spaces proximate to all learning spaces
- Two new kitchens including a specialist kitchen equipped to deliver the
VET Hospitality course
- A barista/cafe space equipped for VET Food and Beverage course
- New TAS specialist spaces
SLIDE 6
In 2021 we will have...
- A new Visual Arts precinct with three specially equipped learning
spaces
- A new Textiles and Design learning space
- New cantilevered bus turning loop onsite and kiss and drop loop
- New playground spaces to the South of the building including
three levels of rock climbing walls
- A new COLA at the southern entry to the school
- A new student entry foyer and student services on level 4
SLIDE 7
In 2022 we will have...
- Two new theatres - a 100 seat Drama theatre and a 200 seat
Music theatre
- Access to new learning spaces across levels 0 - 6
- The current school re-purposed for Stage 6 learning and
staff professional learning spaces
- Aurora College located on site