Tab 23 Presentation of the Draft SHOPP Guidelines May 15, 2019 Teri Anderson, CTC Assistant Chief Engineer 1 Draft Guidelines Development Process Collaboration with Caltrans Public workshop held on March 28, 2019 2 Purpose of the


slide-1
SLIDE 1

Tab 23

Presentation of the Draft SHOPP Guidelines

May 15, 2019 Teri Anderson, CTC Assistant Chief Engineer

1

slide-2
SLIDE 2

Draft Guidelines Development Process

  • Collaboration with Caltrans
  • Public workshop held on

March 28, 2019

2

slide-3
SLIDE 3

Purpose of the SHOPP Guidelines

Set policy, standards, criteria and procedures for the development, adoption, and management of the SHOPP.

3

slide-4
SLIDE 4

Proposed Changes: Key Highlights

4

slide-5
SLIDE 5

Section Alignment

The information within the guidelines was rearranged to better align with the flow of a project through project delivery.

5

slide-6
SLIDE 6

State Highway System Management Plan

Assembly Bill 515 (Frazier, Statutes of 2017) amended Streets and Highways Code Section 164.6 to require the preparation of the State Highway System Management Plan (SHSMP), which replaced the Ten- Year SHOPP Plan and Five-Year Maintenance Plan.

6

slide-7
SLIDE 7

Project Initiation Document

The existing guidelines used the terminology “Project Study Report”. A generic term for a project scoping document is Project Initiation Document.

7

slide-8
SLIDE 8

Right of Way Capital

Projects with right of way capital of $10 million or greater to receive Commission approval for project allocations.

8

slide-9
SLIDE 9

Right of Way Support

  • Increase the time for expenditure of Right of Way

support from 36 months to 72 months.

9

slide-10
SLIDE 10

Change Management

Commission approval required for changes to project performance measures.

10

slide-11
SLIDE 11

SHOPP Baseline Agreements

  • Baseline Agreement Threshold:

Total project cost ˃ $40 million

  • Commission approval within two Commission

meetings after a project has achieved project approval and completion of the environmental document.

11

slide-12
SLIDE 12

Commission Resolutions to be updated

  • G-12

Allocation Adjustments

  • G-05-16

Minor Program

  • G-01-09

R/W Capital Lump Sum

12

slide-13
SLIDE 13

Questions?