SLIDE 1
Prefabricated Residential Construction ARCH 030 term project - - PowerPoint PPT Presentation
Prefabricated Residential Construction ARCH 030 term project - - PowerPoint PPT Presentation
Prefabricated Residential Construction ARCH 030 term project Spring 2005 Ed Swierk The range of prefab manufactured logs = straw panelized frame more off-site more on-site construction construction modular frame traditional frame
SLIDE 2
SLIDE 3
Structural insulated panel (SIP) fabrication
Kornylak block mold panel machines
SLIDE 4
Structural insulated panel (SIP) fabrication
Adhesive Systems Technology SIP assembly line
SLIDE 5
SIP construction
SLIDE 6
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 7
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 8
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 9
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 10
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 11
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 12
SIP construction
Andy Asberry home http://www.asberry.net/
SLIDE 13
SIP construction
SLIDE 14
Modular fabrication
MK Glidehouse
SLIDE 15
Modular fabrication
MK Glidehouse
SLIDE 16
Modular fabrication
MK Glidehouse
SLIDE 17
Modular fabrication
MK Glidehouse
SLIDE 18
Modular fabrication
MK Glidehouse
SLIDE 19
Modular fabrication
MK Glidehouse
SLIDE 20
Modular construction
MK Glidehouse
SLIDE 21
Modular construction
MK Glidehouse
SLIDE 22
Modular construction
MK Glidehouse
SLIDE 23
Modular construction
MK Glidehouse
SLIDE 24
Modular construction
MK Glidehouse
SLIDE 25
Modular construction
MK Glidehouse
SLIDE 26
Standardized vs. customized
Generic Dwelling Corp.
Choose one: Small $599,000 Big $899,000
saratoga custom homes
a design+build company Bill M. Bythehour, AIA president
SLIDE 27
Standardized vs. customized
Generic Computer Corp.
Choose one: Desktop $599.00 Laptop $899.00
saratoga custom computers
a design+build company Bill M. Bythehour, AICA president
SLIDE 28
A third way: constrained customization
SLIDE 29
A third way: constrained customization
SLIDE 30
Prefab history
Lustron Sears + Roebuck Lindal Cedar
1908–1940 1948–1950 1950s–today
SLIDE 31
Productized architecture
- Emphasis on process, not just product
– production, suppliers – marketing, customer experience – sales – pricing strategies
- Opportunities for architects to expand their skills
beyond design
SLIDE 32
Productized architecture: Glidehouse process example
1.Client chooses plan and options, arranges financing. 2.Client works with architect on any customizations. 3.Plan submitted to factory for final pricing. 4.Factory representative submits for permit. 5.Factory builds Glidehouse while factory rep
- versees foundations, utility lines and site work.
6.4 to 6 months later, Glidehouse arrives in 2 truckloads, with all finishes, plumbing, electrical. 7.Factory rep completes “button up” work, owner moves in within 2 weeks of Glidehouse arrival.
SLIDE 33
Prefab future
Clever Homes Michael Graves Pavilion MK Glidehouse
SLIDE 34
For more information
- Project report and presentation slides:
http://tinyurl.com/dotfn
- Many more current prefab projects:
http://www.fabprefab.com/
- Sunset Breezehouse debut: