Prefabricated Residential Construction ARCH 030 term project - - PowerPoint PPT Presentation

prefabricated residential construction
SMART_READER_LITE
LIVE PREVIEW

Prefabricated Residential Construction ARCH 030 term project - - PowerPoint PPT Presentation

Prefabricated Residential Construction ARCH 030 term project Spring 2005 Ed Swierk The range of prefab manufactured logs = straw panelized frame more off-site more on-site construction construction modular frame traditional frame


slide-1
SLIDE 1

Prefabricated Residential Construction

ARCH 030 term project Spring 2005 Ed Swierk

slide-2
SLIDE 2

The range of prefab

more on-site construction more off-site construction

panelized frame logs = straw manufactured mobile modular frame traditional frame

slide-3
SLIDE 3

Structural insulated panel (SIP) fabrication

Kornylak block mold panel machines

slide-4
SLIDE 4

Structural insulated panel (SIP) fabrication

Adhesive Systems Technology SIP assembly line

slide-5
SLIDE 5

SIP construction

slide-6
SLIDE 6

SIP construction

Andy Asberry home http://www.asberry.net/

slide-7
SLIDE 7

SIP construction

Andy Asberry home http://www.asberry.net/

slide-8
SLIDE 8

SIP construction

Andy Asberry home http://www.asberry.net/

slide-9
SLIDE 9

SIP construction

Andy Asberry home http://www.asberry.net/

slide-10
SLIDE 10

SIP construction

Andy Asberry home http://www.asberry.net/

slide-11
SLIDE 11

SIP construction

Andy Asberry home http://www.asberry.net/

slide-12
SLIDE 12

SIP construction

Andy Asberry home http://www.asberry.net/

slide-13
SLIDE 13

SIP construction

slide-14
SLIDE 14

Modular fabrication

MK Glidehouse

slide-15
SLIDE 15

Modular fabrication

MK Glidehouse

slide-16
SLIDE 16

Modular fabrication

MK Glidehouse

slide-17
SLIDE 17

Modular fabrication

MK Glidehouse

slide-18
SLIDE 18

Modular fabrication

MK Glidehouse

slide-19
SLIDE 19

Modular fabrication

MK Glidehouse

slide-20
SLIDE 20

Modular construction

MK Glidehouse

slide-21
SLIDE 21

Modular construction

MK Glidehouse

slide-22
SLIDE 22

Modular construction

MK Glidehouse

slide-23
SLIDE 23

Modular construction

MK Glidehouse

slide-24
SLIDE 24

Modular construction

MK Glidehouse

slide-25
SLIDE 25

Modular construction

MK Glidehouse

slide-26
SLIDE 26

Standardized vs. customized

Generic Dwelling Corp.

Choose one: Small $599,000 Big $899,000

saratoga custom homes

a design+build company Bill M. Bythehour, AIA president

slide-27
SLIDE 27

Standardized vs. customized

Generic Computer Corp.

Choose one: Desktop $599.00 Laptop $899.00

saratoga custom computers

a design+build company Bill M. Bythehour, AICA president

slide-28
SLIDE 28

A third way: constrained customization

slide-29
SLIDE 29

A third way: constrained customization

slide-30
SLIDE 30

Prefab history

Lustron Sears + Roebuck Lindal Cedar

1908–1940 1948–1950 1950s–today

slide-31
SLIDE 31

Productized architecture

  • Emphasis on process, not just product

– production, suppliers – marketing, customer experience – sales – pricing strategies

  • Opportunities for architects to expand their skills

beyond design

slide-32
SLIDE 32

Productized architecture: Glidehouse process example

1.Client chooses plan and options, arranges financing. 2.Client works with architect on any customizations. 3.Plan submitted to factory for final pricing. 4.Factory representative submits for permit. 5.Factory builds Glidehouse while factory rep

  • versees foundations, utility lines and site work.

6.4 to 6 months later, Glidehouse arrives in 2 truckloads, with all finishes, plumbing, electrical. 7.Factory rep completes “button up” work, owner moves in within 2 weeks of Glidehouse arrival.

slide-33
SLIDE 33

Prefab future

Clever Homes Michael Graves Pavilion MK Glidehouse

slide-34
SLIDE 34

For more information

  • Project report and presentation slides:

http://tinyurl.com/dotfn

  • Many more current prefab projects:

http://www.fabprefab.com/

  • Sunset Breezehouse debut:

May 21–22, Willow @ Middlefield, Menlo Park