prefabricated residential construction
play

Prefabricated Residential Construction ARCH 030 term project - PowerPoint PPT Presentation

Prefabricated Residential Construction ARCH 030 term project Spring 2005 Ed Swierk The range of prefab manufactured logs = straw panelized frame more off-site more on-site construction construction modular frame traditional frame


  1. Prefabricated Residential Construction ARCH 030 term project Spring 2005 Ed Swierk

  2. The range of prefab manufactured logs = straw panelized frame more off-site more on-site construction construction modular frame traditional frame mobile

  3. Structural insulated panel (SIP) fabrication Kornylak block mold panel machines

  4. Structural insulated panel (SIP) fabrication Adhesive Systems Technology SIP assembly line

  5. SIP construction

  6. SIP construction Andy Asberry home http://www.asberry.net/

  7. SIP construction Andy Asberry home http://www.asberry.net/

  8. SIP construction Andy Asberry home http://www.asberry.net/

  9. SIP construction Andy Asberry home http://www.asberry.net/

  10. SIP construction Andy Asberry home http://www.asberry.net/

  11. SIP construction Andy Asberry home http://www.asberry.net/

  12. SIP construction Andy Asberry home http://www.asberry.net/

  13. SIP construction

  14. Modular fabrication MK Glidehouse

  15. Modular fabrication MK Glidehouse

  16. Modular fabrication MK Glidehouse

  17. Modular fabrication MK Glidehouse

  18. Modular fabrication MK Glidehouse

  19. Modular fabrication MK Glidehouse

  20. Modular construction MK Glidehouse

  21. Modular construction MK Glidehouse

  22. Modular construction MK Glidehouse

  23. Modular construction MK Glidehouse

  24. Modular construction MK Glidehouse

  25. Modular construction MK Glidehouse

  26. Standardized vs. customized Generic Dwelling Corp. Choose one: Small Big $599,000 $899,000 saratoga custom homes a design+build company Bill M. Bythehour, AIA president

  27. Standardized vs. customized Generic Computer Corp. Choose one: Desktop Laptop $599.00 $899.00 saratoga custom computers a design+build company Bill M. Bythehour, AICA president

  28. A third way: constrained customization

  29. A third way: constrained customization

  30. Prefab history Lustron Sears + Roebuck Lindal Cedar 1948–1950 1908–1940 1950s–today

  31. Productized architecture ● Emphasis on process , not just product – production, suppliers – marketing, customer experience – sales – pricing strategies ● Opportunities for architects to expand their skills beyond design

  32. Productized architecture: Glidehouse process example 1.Client chooses plan and options, arranges financing. 2.Client works with architect on any customizations. 3.Plan submitted to factory for final pricing. 4.Factory representative submits for permit. 5.Factory builds Glidehouse while factory rep oversees foundations, utility lines and site work. 6.4 to 6 months later, Glidehouse arrives in 2 truckloads, with all finishes, plumbing, electrical. 7.Factory rep completes “button up” work, owner moves in within 2 weeks of Glidehouse arrival.

  33. Prefab future Clever Homes MK Glidehouse Michael Graves Pavilion

  34. For more information ● Project report and presentation slides: http://tinyurl.com/dotfn ● Many more current prefab projects: http://www.fabprefab.com/ ● Sunset Breezehouse debut: May 21–22, Willow @ Middlefield, Menlo Park

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend