Quarterly Commission Update 4/9/19
Powering our way of life.
Power Production Quarterly Commission Update 4/9/19 Powering our - - PowerPoint PPT Presentation
Power Production Quarterly Commission Update 4/9/19 Powering our way of life. Department Purpose and Goal Purpose: Provide safe, secure, economical, reliable and compliant power generation under the Priest Rapid Project Federal Energy
Quarterly Commission Update 4/9/19
Powering our way of life.
Purpose: Provide safe, secure, economical, reliable and compliant power generation under the Priest Rapid Project Federal Energy Regulatory Commission (FERC) License Project No. 2114 while supporting the Wanapum relationship. Goal: Execute the aforementioned tasks while championing a culture of safety and operational excellence with continuous focus on the guiding values of safety, innovation, service, teamwork, respect, integrity, and heritage.
Project
65% 70% 75% 80% 85% 90% 95% 100% January February March April May June July August September October November
2019 PP Safety Meeting Attendance
schedule
efficiencies
for activity and associated stoppages
Pressurized Equipment Perform Isolation – LOTO, Pipe Blinding, etc. Depressurize, drain, purge, and vent Relieve trapped pressure Anticipate residual pressure and fluids Avoid line of fire exposure Verify Pressure is Relieved Poor Lighting/Visibility - Indoor Provide alternative lighting Flashlight Head lamp Temporary Lighting Poor Lighting/Visibility - Outdoor Provide alternative lighting Wait or defer until visibility improves. Flashlight Head lamp Temporary Lighting Confined Space (Non-Permit Required) Review Confined Space Policy Discuss confined space entry safe work practices Conduct atmospheric testing (if required) Monitor access or entry (if required) Do not locate mobile engines near confined space Provide observer (if required) I.D. Communication Radio Emergency Contact Numbers Clearance Tags/LOTO Confirm equipment energy sources are isolated Flashlight Required PPE Head Lamp Cell Phone District Phone Emergency Contact Numbers Confined Space Permit Confirm Retrieval Equipment MSDS Review (if applicable) Confined Space Hazard Assessment Form Confined Space (Hazards eliminated and atmospheric mitigated) Review Confined Space Policy MSDS Review (if applicable) Discuss confined space entry safe work practices Conduct atmospheric testing Radio Required PPE
Table
JHA’s into Job Plans
60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% January February March April May June July August September October November December
2019 Availability By Month
Priest Wanapum Project Target
0.00% 0.05% 0.10% 0.15% 0.20% 0.25% 0.30% 0.35% 0.40% 0.45% 0.50% January February March April May June July August September October November December
2019 PP Forced Outage Percentage
Priest Wanapum Project Target
Capital O&M
Budget $25,609,386 Directs $23,189,755 Actual $845,665 $1,374,665 Remain $24,763,731 $21,815,090 Budget $4,226,729 Labor $21,549,431 Actual $695,454 $3,104,455 Remain $3,531,275 $18,444,976 Budget $29,836,115 Total $44,739,186 Actual $1,541,119 $4,479,121 Remain
$28,295,006 $1,106,703
P08 GCB RCA WAN W-10 Isophase Explosion WAN Spillway Gate Left Open on Clearance PR DS Gantry Crane Wire Rope Grip PR Spooling wire on drum WAN DT Slip/Fall WAN Foot and Cart Injury WAN Wicket Gate Slip Trip and Falls WAN Oil Spill in DT from left open nose cone valve WAN Powerhouse Fire PR Airborne Lead Release PR US Gantry Crane Wire Rope Failure QC Penstock Painting Clearance- Final Version PR Rotor Inspection Contractor death PR GSU XMFR Fire
Powering our way of life.
Grant PUD Commission Meeting – April 9, 2019
Powering our way of life.
FERC license, provide real estate support services for the District, and manage the District’s geographic information system (GIS) program.
District’s Strategic Plan objectives related to maintaining a strong financial position, providing long-term low rates, providing excellent customer service, and attaining environmental compliance.
100%
none known/anticipated
responsibilities - rec site O&M, vegetation management, encroachment removals
2018 Budget Actuals as of 2/28/2019 Budget Remaining % of Budget Spent Q4 YEP % Budget to YEP CAP $37,500 $129,498 ($91,998) 345.33% $825,080 2200.21% O&M $1,321,606 ($21,435) $1,343,041
$1,846,015 139.68% Labor $1,136,019 $138,810 $997,209 12.22% $1,136,109 100.01% TOTAL $2,495,125 $246,873 $2,248,252 9.89% $3,807,204 152.59%
Q2 2019 Update
Assessment
Adjustments
GCPUD ERM: Current Business
Budget
KEY DETAILS The Risk Department budget is dominated by insurance premiums.
GCPUD ERM: Current Business
KEY DETAILS Completion of overhanging work and reorientation of loss control and other programs.
California Power Demand: California Imports
KEY DETAILS 2010 data, in millions of MWH. California imported a quarter of its needs at publication. Graph source: https://www.realclearenergy.org/charticles/2012/01/30/california_must_import_one-quarter_of_its_electricity.html
north to south, east to west
demand is a prime mover for western power prices.
California Power Demand: Supply Dynamics
KEY DETAILS Hypothetical regional supply stack; the greater the energy demanded from the market, the higher the clearing price. Graph source: https://www.eia.gov/todayinenergy/detail.php?id=7590
California Power Demand: 2007 CAISO Load
KEY DETAILS Regular climb to a broad, wide peak – supports higher HLH prices. Graphic Source: https://www.caiso.com/Documents/2007AnnualReportonMarketIssuesandPerformance.pdf
California Power Demand: 2007 CAISO Load
KEY DETAILS Regular climb to a broad, wide peak – supports higher HLH prices. Graphic Source: https://www.caiso.com/Documents/2007AnnualReportonMarketIssuesandPerformance.pdf
HLH Hours
California Power Demand: Load Dynamics
KEY DETAILS This load data includes DG (behind-the-meter) solar installations.
California Power Demand: Load Dynamics
KEY DETAILS This load data includes DG (behind-the-meter) solar installations.
California Power Demand: Load Dynamics
KEY DETAILS This load data includes DG (behind-the-meter) solar installations.
California Power Demand: Load Dynamics
KEY DETAILS This load data includes DG (behind-the-meter) solar installations.
California Power: Renewable Generation
KEY DETAILS This data represents solar, wind, and other wholesale renewable plants within California.
California Power: Renewable Generation
KEY DETAILS This data represents solar, wind, and other wholesale renewable plants within California.
Wind
California Power: Renewable Generation
KEY DETAILS This data represents solar, wind, and other wholesale renewable plants within California.
Wind Solar
California Power Demand: Imports
KEY DETAILS Imports are a function of the net load minus the wholesale renewable generation.
California Power Demand: Imports
KEY DETAILS Imports are a function of the net load minus the wholesale renewable generation.
California Power Demand: Imports
KEY DETAILS Energy Efficiency, DG and Wholesale solar within California are causing bulk imports to ebb, placing pressure on western HLH bulk power prices.
3-4mm people between 2007 and 2018
GDP
Portland reducing load and demand growth
Enterprise Dashboard
Areas
inform the decision- making with boots-
information
prone to move
QUADRANT ANALYSIS The center of the grid is a $100,000 impact and 50% likelihood.
Enterprise Dashboard
prone to move
QUADRANT ANALYSIS The center of the grid is a $100,000 impact and 50% likelihood.
Danger Zone
Data Gathering
actually causes
across 54 functional areas
RISK CATALOG We tailored the list of risks for GCPUD through management interviews and industry-specific data supplied by Logic Manager.
Data Gathering
actually causes
across 54 functional areas
RISK CATALOG We tailored the list of risks for GCPUD through management interviews and industry-specific data supplied by Logic Manager.
Data Gathering
actually causes
across 54 functional areas
RISK CATALOG We tailored the list of risks for GCPUD through management interviews and industry-specific data supplied by Logic Manager.
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $10MM Average Assurance: 6 Functional Areas: Forecasting/Planning, Bond Compliance, Accounting, Audit, HR, PMO, Records, IT, Distribution Automation, Origination/Contract Management Mitigation Requests: Data Warehouse/Lake, further leverage existing systems, broaden access, improve data culture/discipline through training
KEY DETAILS Information Silos, Lack of a Single Source System, Multiple Sources of “Truth”, Inability to Organize/Integrate Data, Lack of Historical Data
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $8MM Average Assurance: 6 Functional Areas: All PMO, Electric Shop, HR Compensation/Benefits, Transportation, Procurement, Records, IT Mitigation Requests: Better leverage existing systems, better define what a ‘complete’ IT implementation will do for the team.
KEY DETAILS Obsolescence/lagging behind market, Integration difficulties, Lack of adequate automation, Cybersecurity
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $7MM Average Assurance: 6 Functional Areas: Forecasting/Planning, Accounting, Network Operations, Priest Rapids, Power Production Maintenance, Electric Shop, Security Mitigation Requests: Improve automation/data management, cultivate analysis of situations rather than processing through hiring and development
KEY DETAILS Loss of institutional knowledge through attrition (+), Lack of trained backup individuals, Market salaries increasing faster than revenues, Declining employee morale, Overworked staff
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $6MM Average Assurance: 6 Functional Areas: Electric Shop, Wanapum Operations, Priest Rapids Operations, Security, Transportation, Facilities, Distribution Automation Mitigation Requests: Continue reinvestment and better
KEY DETAILS Age and condition – increases noted in Facilities and Distribution
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $6MM Average Assurance: 6 Functional Areas: Distribution Automation, IT Network Operations, IT Systems & Programming, Transportation, Facilities, Telecom Engineering Mitigation Requests: Create plan with hierarchies of need and function so all participants are aligned. Consider exercises or stress tests.
KEY DETAILS Lack of planning, Cyberattack Risk, Seismic Risk, Terrorism threat. Changes noted in Security and IT.
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $6MM Average Assurance: 5 Functional Areas: Forecasting/Planning, Power Delivery PMO, Large Customer Care, Origination, Retail Product Development Mitigation Requests: communicate company and customers’ respective positions better to key areas, trigger “Good Profit” culture
KEY DETAILS Customer needs are not understood and prioritized, Stakeholders unwilling to compromise, Competitive retail markets/customer migration
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk : $9MM Average Assurance: 5 Functional Areas: Project Management, Procurement, Transportation, Safety, Facilities, Electric Shop, Audit, Forecasting Planning/Analysis Mitigation Requests: Clarify functional area alignment with central ownership of corporate roles, Foster inter- unit cooperation and documentation.
KEY DETAILS Conflicting priorities or agendas, Ineffective Coordination, Scheduling rigidity, Plans not socialized across disciplines ahead of time, Users not involved in establishing priorities. Improvements in Finance, Safety, Meter Reading.
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $5MM Average Assurance: 5 Functional Areas: Safety, Telecom Engineering, Accounting, Forecasting/Planning, Records, all PMO Mitigation Requests: Increase delegation of decision making and ownership, Foster culture of analysis rather than processing alone, solve data problems
KEY DETAILS Inadequate forecasting and budgeting, Inappropriate use of leading/lagging indicators, Lack of due diligence, Ineffective risk identification, Inadequate Correction for Deficiencies. Moved on improved assurance in financial functions.
GCPUD ERM: Company-Wide Risks
Annual Contributory Risk: $6MM Average Assurance: 4 Functional Areas: Priest Rapids Operations, Power Production Maintenance, Regulatory Affairs, IT Network Operations, Bond Compliance, Audit, Origination Mitigation Requests: proactively engage governmental stakeholders, make realistic promises, steep understanding of the positions through more key areas
KEY DETAILS New and more expensive NERC/FERC regulatory requirements, new WA state requirements, changing political environment
PROGRESS Demonstrate measurable accomplishment of goals with demonstrable value to the District.
Devon Williams Risk Manager Dwilliams@gcpud.org 509.754.6604
grantpud.org
2018 Audit Results
April 9, 2019
Better Together: Moss Adam s & GCPUD 2
Public Utility District No. 2 of Grant County, Washington
Board of Commissioners
Dear Commissioners: Thank you for your engagement of Moss Adams LLP. We are pleased to have the opportunity to meet with you to discuss the results of our audit of the financial statements of the District as of and for the year ended December 31, 2018. The accompanying presentation, which is intended solely for the use
be and should not be used by anyone other than these specified parties, presents important information regarding the District’s financial statements and our audit that we believe will be of interest to you. We conducted our audit with the objectivity and independence that you expect. We received the full support and assistance of District
District as its independent public accountants and look forward to our continued relationship.
Better Together: Moss Adam s & GCPUD 3
Agenda
Better Together: Moss Adam s & GCPUD 4
Audit Reports Issued
Utility District, which are presented fairly and in accordance with U.S. Generally Accepted Accounting Principles
reporting in accordance with Governm ent Auditing Standards
Better Together: Moss Adam s & GCPUD 5
Areas of Audit Emphasis
testing of additions, retirements, overhead application, capitalized interest and depreciation
premiums, capitalized interest, and compliance with covenants
and Avangrid Renewables, Inc
Better Together: Moss Adam s & GCPUD 6
Areas of Audit Emphasis (continued)
unrestricted
support the various financial reporting systems
with authoritative disclosure checklists and our knowledge of industry best practices
Better Together: Moss Adam s & GCPUD 7
Communications with Those Charged with Governance
Better Together: Moss Adam s & GCPUD 8
Our Responsibility Under U.S. Generally Accepted Auditing Standards and Government Auditing Standards
To express our opinion on whether the financial statements prepared by management with your
respects, and in accordance with U.S. GAAP. However, our audit does not relieve you or management of your responsibilities. To consider internal control over financial reporting as a basis for designing audit procedures but not for the purpose of expressing an opinion on its effectiveness or to provide assurance concerning such internal control. To perform an audit in accordance with generally accepted auditing standards issued by the AICPA and Government Auditing Standards issued by the Comptroller General of the United States, and design the audit to obtain reasonable, rather than absolute, assurance about whether the financial statements are free of material misstatement. To communicate findings that, in our judgment, are relevant to your responsibilities in overseeing the financial reporting process. However, we are not required to design procedures for the purpose of identifying other matters to communicate to you.
8
Better Together: Moss Adam s & GCPUD
statements
December 31, 2018
Than Pensions
Required Communications
9
Better Together: Moss Adam s & GCPUD
Uncertainties
statements in Note 10
staff throughout the audit term
regulations.
Required Communications (continued)
10
Better Together: Moss Adam s & GCPUD
Upcoming Accounting Pronouncements
11
retirement obligations.
GASB 83 – Asset Retirement Obligations
recognizing that leases are financings of the right to use an underlying asset.
GASB 87 - Leases
fashion; requested schedules and draft financial statements were received on a timely basis.
courteous, responsive, and fulfilled all of our requests in a timely manner.
requests and discussion points.
Thank you!
Acknowledgements
12
Better Together: Moss Adam s & GCPUD
Better Together: Moss Adam s & GCPUD 13
Contact Us
Gene Austin Compliance Manager April 09, 2019
April 09, 2019
Reliability Compliance Program
2
April 09, 2019
Reliability Compliance Program
3
~650 Level 1 Requirements (~ 1,300 Total Reqmts)
(2) new (1) Q4-2018 (2) 2017 Audit
April 09, 2019
Reliability Compliance Program
4
April 09, 2019
Reliability Compliance Program
5
April 09, 2019
Reliability Compliance Program
5
$998,314 $550,448 $83,600 $333,766 $30,500 $78,537 $0 $10,402 $67,410 $725 Total CAP O&M Labor Travel and Training
April 09, 2019
Reliability Compliance Program
6