SLIDE 1
Port of San Francisco Public Restroom Project Re-Bid Contract No. - - PowerPoint PPT Presentation
Port of San Francisco Public Restroom Project Re-Bid Contract No. - - PowerPoint PPT Presentation
Port of San Francisco Public Restroom Project Re-Bid Contract No. 2771R January 11, 2018 AGENDA 1. Welcome & Introductions Andre Antonio 2. Project Overview Wendy Proctor 3. CMD Finbarr Jewell 4. OLSE Anna Liu 5. Bid
SLIDE 2
SLIDE 3
AGENDA
- 1. Welcome & Introductions – Andre Antonio
- 2. Project Overview – Wendy Proctor
- 3. CMD – Finbarr Jewell
- 4. OLSE– Anna Liu
- 5. Bid Documents – Andre Antonio
- 6. Questions
SLIDE 4
SLIDE 5
- Base Bid work includes construction of a new multi-user Men’s and Women’s
public restroom inside Pier 45, minor renovations of existing single user restroom door and reconstruction of an infill wall within an existing roll up
- door. The work will include selective demolition, structural framing, installation
- f plumbing fixtures, connection to existing sanitary sewer lines and water
lines, electrical infrastructure upgrades, demolition of electrical components, installation of new panels and fixtures, installation of mechanical fans, ducts and vents, and installation of toilet accessories, compartments, finishes, and
- signage. The area of work inside Pier 45 is over land.
- Alternate Bid work includes construction of a pre-engineered single user
composting toilet in Islais Creek Park. The work will include selective site clearing, earth moving, excavation and protection, and asphalt concrete paving.
SLIDE 6
- The area of work inside Pier 45 is used for public parking which remain
- perational during construction.
- There are no known hazardous materials in the areas of demolition.
Contractor shall perform work in conformance with CAL/OSHA. Contractor shall use best practices to control and contain fungal growth in areas where demolition occurs.
- Work areas shall be secured by the contractor.
- Soils in the Islais Creek Park will need to be tested prior to disposal.
SLIDE 7
SLIDE 8
SLIDE 9
SLIDE 10
SLIDE 11
SLIDE 12
SLIDE 13
Presented By: Finbarr Jewell (415)-274-0511
- Bidder must be a CMD Certified Micro-LBE.
- LBE Subcontractor Participation goal does
not apply.
- LBE prime contractor bid discount does not
apply.
- Refer to Section 00 22 11 for details.
SLIDE 14
SLIDE 15
SLIDE 16
SLIDE 17
Presented By: Anna Liu
SLIDE 18
SLIDE 19
Employers need to match or exceed the City’s Ordinances for the following:
- Prevailing Wages
- Sick Leave
- Health Care
- Worker Compensation
SLIDE 20
SLIDE 21
- Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82
- See Section 00 73 30 for details
- Applies to both Prime Contractor and ALL Subcontractors
- Local Hire Requirement 30% by trade
- At least 50% of Apprentice project work hours within each trade shall be
performed by local residents.
NOT REQUIRED For Micro-LBE Projects
SLIDE 22
QBD Addendum
SLIDE 23
ENSUING SITE VISIT AT PIER 45 - SHED A
SLIDE 24