TSXV:NAR Pikoo Diamond Project Exploration Update Companion Presentation to the September 8, 2015 Pikoo Project Press Release FORWARD LOOKING STATEMENT This presentation contains projections and forward looking information that involve


slide-1
SLIDE 1

TSXV:NAR

Pikoo Diamond Project Exploration Update

Companion Presentation to the September 8, 2015 Pikoo Project Press Release

slide-2
SLIDE 2

This presentation contains projections and forward looking information that involve various risks and uncertainties, including, without limitation, statements regarding the potential extent of mineralization, resources, reserves, exploration results and plans and objectives of North Arrow Minerals Inc. These risks and uncertainties include, but are not restricted to, the amount of geological data available, the uncertain reliability of drilling results and geophysical and geological data and the interpretation thereof and the need for adequate financing for future exploration and development efforts. There can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. These and all subsequent written and oral forward-looking statements are based on the estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward looking statements should circumstances or management's estimates or opinions change. 2

FORWARD LOOKING STATEMENT

slide-3
SLIDE 3

PIKOO PROJECT, SK

  • North Arrow (80%)/Stornoway

(20%) Joint Venture.

  • Good local infrastructure; within

10 km of SK Hwy 911– more than 200 km from nearest kimberlite field (FALC).

  • Exceptional diamond results from

PK150 kimberlite in 2013; 23 diamonds > 0.85 mm from 209 kg.

  • 560 till samples were collected

in 2014 to generate new target areas.

  • Spring 2015 drill program

discovered four new kimberlites; PK150 doubled in size.

3

slide-4
SLIDE 4

PIKOO PROJECT, SK

  • North Arrow (80%)/Stornoway

(20%) Joint Venture.

  • Good local infrastructure; within

10 km of SK Hwy 911– more than 200 km from nearest kimberlite field (FALC).

  • Exceptional diamond results from

PK150 kimberlite in 2013; 23 diamonds > 0.85 mm from 209 kg.

  • 560 till samples were collected

in 2014 to generate new target areas.

  • Spring 2015 drill program

discovered four new kimberlites; PK150 doubled in size.

4

slide-5
SLIDE 5
  • 977 till samples have

been collected from the property; including 550 in 2014.

  • Positive samples range

from 1 to 100’s of KIM grains.

  • Five KIM trains or

anomalous areas have been identified.

  • All indicator trains are

probe-confirmed to be mantle derived and indicative of a kimberlitic source.

pyrope garnets ilmenite eclogitic garnets chromite

Probe Confirmed Results

PIKOO PROJECT – KIMBERLITE INDICATOR TRAINS

5

Bigger circles = more KIM grains June 2014 till sample

slide-6
SLIDE 6

24 drill holes (3,243 m) tested kimberlite discoveries from 2013 & new targets defined by till sampling programs in 2014. PK150 delineation drilling

  • Was drilled by 6 holes

(bringing total number of holes to 9)

  • Strike extended to 150 m;

depth to 199 m.

  • Cut off to the west but

remains open to east

  • Eastern extension not

constrained by high intensity magnetics;

  • Transitional to diatreme-type

textures encountered in eastern-most hole (PK-34)

SPRING 2015 DRILLING – PK150

6

Bigger circles = more KIM grains kimberlites pyrope garnets ilmenite eclogitic garnets chromite

Probe Confirmed Results

PK150

slide-7
SLIDE 7

SPRING 2015 DRILLING – PK150

Drill Hole PK34

  • Hole PK34 intersected 30m of

kimberlite (21.5m true width) ~29m eastern stepout; weakly magnetic zone; subtle mag targets now on radar.

  • Magmaclasts suggest transitional to

diatreme facies.

Ground Magnetic Field Data of PK150 – Vertical Gradient with Total Field Contours

2015 drilling 2013 drilling

7

PK16 PK18

slide-8
SLIDE 8
  • Caustic fusion analyses of 323.02 kg of kimberlite from PK150 have resulted in the

recovery of 487 diamonds larger than 0.106 mm sieve class, including 9 diamonds greater than the 0.85 mm sieve class;

  • Weakly magnetic transitional kimberlite discovered at the eastern end of PK150 has

returned diamond counts consistent with the remainder of the kimberlite.

SPRING 2015 DRILLING – PK150 DIAMOND RESULTS

8

Number of Diamonds per Sieve Size (mm Square Mesh Sieve) Sample 0.106 0.15 0.212 0.3 0.425 0.6 0.85 1.18 1.7 Total Total Weight

  • 0.15
  • 0.212
  • 0.3
  • 0.425
  • 0.6
  • 0.85
  • 1.18
  • 1.7
  • 2.36

Stones Carats Dry Kg +0.85mm PK150 323 197 131 69 47 23 11 7 1 1 487 0.185

slide-9
SLIDE 9

1 10 100 1000 10000 100000 1000000 10000000 100000000 1E+09 1E+10 0.000010 0.000100 0.001000 0.010000 0.100000 1.000000 SPHTUI STN SZ

PK150 2015 (323kg) PIKOO HK (210kg)

PK150 MICRO DIAMOND RESULTS – 2013 vs. 2015

K P

PK150 2015 (323 kg) PK150 2013 (210 kg)

Microdiamond Results (Stones Per Unit Interval)

9

slide-10
SLIDE 10

1 10 100 1000 10000 100000 1000000 10000000 100000000 1E+09 1E+10 0.000010 0.000100 0.001000 0.010000 0.100000 1.000000 SPHTUI STN SZ

15PK150_18 15PK150_16 15PK150_34 PIKOO 2015

PK150 MICRODIAMOND RESULTS – DRILL HOLES VS. TOTAL

2015 PK150 – Hole 18 2015 PK150 – Hole 16 2015 PK150 – Hole 34 2015 PK150 Total (323 kg)

C K K P

Microdiamond Results (Stones Per Unit Interval)

10

slide-11
SLIDE 11

1 10 100 1000 10000 100000 1000000 10000000 100000000 1E+09 1E+10 0.000010 0.000100 0.001000 0.010000 0.100000 1.000000 SPHTUI STN SZ

CH6(1500kg) KDI 8/13 (1100kg) KDI 10/12 HK (394kg) PK150

Chidliak CH6 (Peregrine) - 1500 kg Kelvin KDI 8/13 (Kennady) - 1500 kg Kelvin KDI 10/12 HK (Kennady) - 394 kg PK150 Total (North Arrow) – 533 kg

C K K P

PK150 MICRODIAMOND RESULTS – TOTAL VS. OTHER

Microdiamond Results (Stones Per Unit Interval)

11

slide-12
SLIDE 12

PK311 – drilling collared into a weathered micaceous unit confirmed by KIM analysis as kimberlite; more drilling required to define

  • rientation/extent of body.

PK312 – 1.5 m near vertical dyke; 14.5 kg sample returned five diamonds; abundant olivine, garnet, ilmenite & chrome diopside macrocrysts; further delineation required. PK314 - 25 m wide; >40 m strike length; drilled to 213m; high chrome pyrope geochem; ~475 kg being processed for microdiamonds.

SPRING 2015 DRILLING – NEW DISCOVERIES

12

Bigger circles = more KIM grains kimberlites pyrope garnets ilmenite eclogitic garnets chromite

Probe Confirmed Results

PK314 PK312 PK311

slide-13
SLIDE 13

SPRING 2015 DRILLING – PK314

2015 drilling

Airborne Magnetics

2013 drilling PK 314 – target apparent

  • nly on ground mag; four

holes drilled; 25 m wide body; >40 m strike length; drilled to 213 m depth

Ground Magnetics

pyrope garnets ilmenite eclogitic garnets chromite

Probe Confirmed Till Results

High chrome pyrope garnet

Structure hosting narrow kimberlite dikes

13

slide-14
SLIDE 14

28

PIKOO - THE WAY FORWARD

  • PK314 microdiamond results – due late September 2015.
  • Heli-mag survey of key target areas - September and October 2015.
  • Fixed-wing mag survey of Pikoo East option properties – September, 2015.
  • Winter/ spring 2016 drilling:
  • Fully define known kimberlites
  • Drill-test targets defined by heli-mag survey.

14

slide-15
SLIDE 15

TSXV: NAR

Ken Armstrong

President & CEO

Nick Thomas

Investor and Community Relations Suite 960-789 West Pender Street Vancouver, BC Canada V6C 1H2 Tel: +1.604.668.8354 Fax: +1.604.336.4813 info@northarrowminerals.com www.northarrowminerals.com @narminerals northarrowminerals