pikoo diamond project exploration update
play

Pikoo Diamond Project Exploration Update Companion Presentation to - PowerPoint PPT Presentation

TSXV:NAR Pikoo Diamond Project Exploration Update Companion Presentation to the September 8, 2015 Pikoo Project Press Release FORWARD LOOKING STATEMENT This presentation contains projections and forward looking information that involve


  1. TSXV:NAR Pikoo Diamond Project Exploration Update Companion Presentation to the September 8, 2015 Pikoo Project Press Release

  2. FORWARD LOOKING STATEMENT This presentation contains projections and forward looking information that involve various risks and uncertainties, including, without limitation, statements regarding the potential extent of mineralization, resources, reserves, exploration results and plans and objectives of North Arrow Minerals Inc. These risks and uncertainties include, but are not restricted to, the amount of geological data available, the uncertain reliability of drilling results and geophysical and geological data and the interpretation thereof and the need for adequate financing for future exploration and development efforts. There can be no assurance that such statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. These and all subsequent written and oral forward-looking statements are based on the estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. The Company assumes no obligation to update forward looking statements should circumstances or management's estimates or opinions change. 2

  3. PIKOO PROJECT, SK  North Arrow (80%)/Stornoway (20%) Joint Venture.  Good local infrastructure; within 10 km of SK Hwy 911 – more than 200 km from nearest kimberlite field (FALC).  Exceptional diamond results from PK150 kimberlite in 2013; 23 diamonds > 0.85 mm from 209 kg.  560 till samples were collected in 2014 to generate new target areas.  Spring 2015 drill program discovered four new kimberlites; PK150 doubled in size. 3

  4. PIKOO PROJECT, SK  North Arrow (80%)/Stornoway (20%) Joint Venture.  Good local infrastructure; within 10 km of SK Hwy 911 – more than 200 km from nearest kimberlite field (FALC).  Exceptional diamond results from PK150 kimberlite in 2013; 23 diamonds > 0.85 mm from 209 kg.  560 till samples were collected in 2014 to generate new target areas.  Spring 2015 drill program discovered four new kimberlites; PK150 doubled in size. 4

  5. PIKOO PROJECT – KIMBERLITE INDICATOR TRAINS  977 till samples have been collected from the property; including 550 in 2014.  Positive samples range from 1 to 100’s of KIM grains.  Five KIM trains or anomalous areas have been identified.  All indicator trains are probe-confirmed to be mantle derived and indicative of a kimberlitic source. Probe Confirmed Results Bigger circles = more KIM grains pyrope garnets June 2014 till sample ilmenite eclogitic garnets chromite 5

  6. SPRING 2015 DRILLING – PK150 24 drill holes (3,243 m) tested kimberlite discoveries from 2013 PK150 & new targets defined by till sampling programs in 2014. PK150 delineation drilling  Was drilled by 6 holes (bringing total number of holes to 9)  Strike extended to 150 m; depth to 199 m.  Cut off to the west but remains open to east  Eastern extension not Probe Confirmed Results constrained by high intensity pyrope garnets ilmenite magnetics; eclogitic garnets chromite  Transitional to diatreme-type textures encountered in Bigger circles = more KIM grains kimberlites eastern-most hole (PK-34) 6

  7. SPRING 2015 DRILLING – PK150 • Hole PK34 intersected 30m of kimberlite (21.5m true width) ~29m eastern stepout; weakly magnetic zone; subtle mag targets now on 2013 drilling radar. • Magmaclasts suggest transitional to diatreme facies. 2015 drilling Drill Hole PK18 PK16 PK34 Ground Magnetic Field Data of PK150 – Vertical Gradient with Total Field Contours 7

  8. SPRING 2015 DRILLING – PK150 DIAMOND RESULTS • Caustic fusion analyses of 323.02 kg of kimberlite from PK150 have resulted in the recovery of 487 diamonds larger than 0.106 mm sieve class, including 9 diamonds greater than the 0.85 mm sieve class; • Weakly magnetic transitional kimberlite discovered at the eastern end of PK150 has returned diamond counts consistent with the remainder of the kimberlite. Number of Diamonds per Sieve Size (mm Square Mesh Sieve) Sample 0.106 0.15 0.212 0.3 0.425 0.6 0.85 1.18 1.7 Total Total Weight -0.15 -0.212 -0.3 -0.425 -0.6 -0.85 -1.18 -1.7 -2.36 Stones Carats Dry Kg +0.85mm PK150 323 197 131 69 47 23 11 7 1 1 487 0.185 8

  9. PK150 MICRO DIAMOND RESULTS – 2013 vs. 2015 Microdiamond Results (Stones Per Unit Interval) 1E+10� 1E+09� 100000000� 10000000� 1000000� SPHTUI� 100000� 10000� PK150� 2015� (323kg)� K PK150 2015 (323 kg) 1000� P PK150 2013 (210 kg) 100� PIKOO� HK� (210kg)� 10� 1� 0.000010� 0.000100� 0.001000� 0.010000� 0.100000� 1.000000� 9 STN� SZ�

  10. PK150 MICRODIAMOND RESULTS – DRILL HOLES VS. TOTAL Microdiamond Results (Stones Per Unit Interval) 1E+10� 1E+09� 100000000� 10000000� 1000000� SPHTUI� 100000� 10000� C 2015 PK150 – Hole 18 15PK150_18� 2015 PK150 – Hole 16 K 1000� 15PK150_16� 2015 PK150 – Hole 34 K 15PK150_34� 100� 2015 PK150 Total (323 kg) P PIKOO� 2015� 10� 1� 0.000010� 0.000100� 0.001000� 0.010000� 0.100000� 1.000000� 10 STN� SZ�

  11. PK150 MICRODIAMOND RESULTS – TOTAL VS. OTHER Microdiamond Results (Stones Per Unit Interval) 1E+10� 1E+09� 100000000� 10000000� 1000000� SPHTUI� 100000� 10000� CH6(1500kg)� C Chidliak CH6 (Peregrine) - 1500 kg 1000� KDI� 8/13� (1100kg)� Kelvin KDI 8/13 (Kennady) - 1500 kg K KDI� 10/12� HK� (394kg)� Kelvin KDI 10/12 HK (Kennady) - 394 kg K 100� PK150� PK150 Total (North Arrow) – 533 kg P 10� 1� 0.000010� 0.000100� 0.001000� 0.010000� 0.100000� 1.000000� 11 STN� SZ�

  12. SPRING 2015 DRILLING – NEW DISCOVERIES PK311 – drilling collared into PK314 a weathered micaceous unit confirmed by KIM analysis as kimberlite; more drilling PK312 required to define orientation/extent of body. PK311 PK312 – 1.5 m near vertical dyke; 14.5 kg sample returned five diamonds; abundant olivine, garnet, ilmenite & chrome diopside macrocrysts; further delineation required. PK314 - 25 m wide; >40 m Probe Confirmed Results strike length; drilled to 213m; pyrope garnets ilmenite high chrome pyrope eclogitic garnets chromite geochem; ~475 kg being Bigger circles = more KIM grains processed for kimberlites microdiamonds. 12

  13. SPRING 2015 DRILLING – PK314 Probe Confirmed Till Results Airborne Magnetics pyrope garnets ilmenite eclogitic garnets chromite 2013 drilling 2015 drilling PK 314 – target apparent Structure only on ground mag; four hosting narrow holes drilled; 25 m wide kimberlite dikes body; >40 m strike length; drilled to 213 m depth Ground Magnetics High chrome pyrope garnet 13

  14. PIKOO - THE WAY FORWARD  PK314 microdiamond results – due late September 2015.  Heli-mag survey of key target areas - September and October 2015.  Fixed-wing mag survey of Pikoo East option properties – September, 2015.  Winter/ spring 2016 drilling:  Fully define known kimberlites  Drill-test targets defined by heli-mag survey. 28 14

  15. TSXV: NAR Ken Armstrong President & CEO Nick Thomas Investor and Community Relations Suite 960-789 West Pender Street Vancouver, BC Canada V6C 1H2 Tel: +1.604.668.8354 Fax: +1.604.336.4813 info@northarrowminerals.com @narminerals northarrowminerals www.northarrowminerals.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend