Per erfo formance rmance-Based Based Proj ojec ect t Se Sele - - PowerPoint PPT Presentation

per erfo formance rmance based based proj ojec ect t se
SMART_READER_LITE
LIVE PREVIEW

Per erfo formance rmance-Based Based Proj ojec ect t Se Sele - - PowerPoint PPT Presentation

Per erfo formance rmance-Based Based Proj ojec ect t Se Sele lection ction AMPO Annual Conference September 27, 2018 Go Goals ls of of th the e Regionally-balanced Process ocess Transparent Objective Data-driven decisions


slide-1
SLIDE 1

Per erfo formance rmance-Based Based Proj

  • jec

ect t Se Sele lection ction

AMPO Annual Conference September 27, 2018

slide-2
SLIDE 2

Go Goals ls of

  • f th

the e Process

  • cess

Regionally-balanced Transparent Objective Data-driven decisions

slide-3
SLIDE 3

Dev evelopmen elopmen t

Selection lection Process ess

FAST Act (Feder eral al Perfo formanc rmance e Measures) ures) HB HB-20 (State e Perfo formanc rmance e Measures) ures) Peer Agenc ncies es Criteri eria a and Process esses es TPB Priori rities ties and Direct ction ion TAC Review ew and Feedback back

slide-4
SLIDE 4

Project ject Call Criter teria

Safet ety Infra rast structu ructure e Condi

  • nditi

tion Cong

  • nges

esti tion Reduc ucti tion Syste tem m Reliabi iability lity Frei eight t Move

  • veme

ment t and Econo

  • nomic

mic Vitality tality Enviro ironme mental tal Sustai tainability ability Reduc uced ed Pro roje ject t Deliv liver ery y Dela lays Pro roje ject Readin adines ess Cong

  • nges

esti tion and Mobility

  • bility
  • Multimo

ltimodal dal Eleme ements ts

  • Safety

ty Tra ravel el Time me Savin ings gs Regio ional l Impac act Econo

  • nomic

mic Develo elopme pment Social ial and d Envir ironmen mental tal Impact acts Fundin ding Match Plannin ing Proc rocess ss Syste tem m Pres eser ervatio ation

Ali lignment ent wi with h Nationa nal l Goals ls

slide-5
SLIDE 5

Project ject Call Criter teria

Safet ety y and Secur urit ity Syste tem m Pres eser ervatio ation Land d Use and Tra ransp sporta rtati tion Conn

  • nnec

ectiv ivit ity Effic icie iency y and Perfo rforma mance Enviro ironme ment Noise

  • ise and

d Nei eigh ghbo borhood d Char aract acter er Air ir Qual alit ity y and Ener ergy gy Social ial Equit uity Cos

  • st

t Effec ecti tive Pro roje ject Dela lay Econo

  • nomy

my Mobility

  • bility and

Acces ess Pro roje ject Readin adines ess

  • Cong
  • nges

esti tion and Mobility

  • bility
  • Multimo

ltimodal dal Eleme ements ts

  • Safet

ety

  • Tra

ravel el Time me Savin ings gs

  • Regio

ional l Impac act

  • Econo
  • nomic

mic Develo elopme pment

  • Social

ial and d Envir ironmen mental tal Impact acts

  • Fundin

ding Match

  • Plannin

ing g Pro roces ess

  • Syste

tem m Pres eser ervatio ation

  • Ali

lignment ent wi with h Long-Rang nge e Pla lan

slide-6
SLIDE 6

Project Score Planning Factors Project Readiness Cost/Benefit Analysis

Project ect Selec lectio tion n Proce cess ss

slide-7
SLIDE 7

Project Score Planning Factors Project Readiness Cost/Benefit Analysis

Project ect Selecti lection

  • n

Proce cess ss

slide-8
SLIDE 8

Project Score Planning Factors Project Readiness Cost/Benefit Analysis

Project ect Selec lectio tion n Proce cess ss

slide-9
SLIDE 9

Scori ring ng Cate tego gorie ries

Roadway ITS-Operations Transit Active Transportation Other TDM

slide-10
SLIDE 10

Pla lann nning ng Fact ctors rs

slide-11
SLIDE 11

Pla lann nning ng Fact ctor Sco cori ring ng

slide-12
SLIDE 12

Project Score Planning Factors Project Readiness Cost/Benefit Analysis

Project ect Selec lectio tion n Proce cess ss

slide-13
SLIDE 13

Cost st/Benefi /Benefit t Analy lysis sis fo for r Project ect Sco cori ring ng

Roadway ITS/Operations Transit Active Transportation Other

Performance Measure Planning Factors (50%) Cost/Benefit Analysis (50%)

slide-14
SLIDE 14

Cost st/Benefi /Benefit t Ana nalys lysis is fo for r Project ect Sco cori ring ng

Purpose: pose:

  • Sor
  • rt

t Projec

  • jects

ts

  • Base

se on

  • n Data

ta

Regional and local Land Use and Transportation growth estimates Projects included in 2040 Plan Crash statistics for the CAMPO region Crash reduction effectiveness measures

Not

  • t int

ntende ended d to

  • reflect

flect ful ull-scal scale e Co Cost st/Benefit Benefit of projects

  • jects
slide-15
SLIDE 15

Roadwa way Cate tegor gory y

  • Travel

el Time me

Data from regional model, test with/without project CBA spreadsheet – convert time saving to $Value

  • Sa

Safet ety

Need Effectiveness of project Cost Combine

  • Each

h 50% o % of CB CBA score e or 25% o % of ov

  • ver

erall ll score

slide-16
SLIDE 16

Safe fety ty

Nee eed

Crash rating for facility type (lookup) Rate by County, by facility class, and urban/rural

Crash Rate per VMT Bastrop Burnet Caldwell Hays Travis Williamson Rural Interstate/Freeway N/A N/A 0.0009 N/A N/A N/A Principal Arterial 0.0010 0.0007 0.0008 0.0012 0.0006 0.0008

  • Min. Arterial, Maj. Collector

0.0014 0.0010 0.0022 0.0017 0.0020 0.0015 Urban Interstate/Freeway 0.0013 N/A N/A 0.0003 0.0009 0.0008 Principal Arterial 0.0019 0.0037 0.0021 0.0018 0.0021 0.0018

  • Min. Arterial, Maj. Collector

0.0032 0.0025 0.0054 0.0034 0.0029 0.0024

Source: CRIS data, TxDOT published VMT 2016

slide-17
SLIDE 17

Safe fety ty

Effec ecti tivenes veness

Estimate for reduction in crash rates due to project design Highway Safety Improvement Program (HSIP) lookup table

Examples

slide-18
SLIDE 18

Combine

Safety: Need Effectiveness Cost Combine

slide-19
SLIDE 19

ITS/Oper /Operations tions Cate tego gory y

Tool for Oper erati ations

  • ns Bene

nefit fit Cost t Ana nalys ysis is (TO TOPS PS- BC)

T ravel Time Savings Improved T ravel Time Reliability Crash Reduction Fuel Consumption Savings Proj

  • jec

ects ts rank nked ed by y reduct ductio ion n in in vehicle icle mil iles es traveled veled and scored

  • red

Ridership estimates, mode splits by TAZ VMT savings, etc. +Suffici ficient docum cumen entat ation ion, , plan, , pil ilot

  • t consid

siderat eration ion

FHWA Tool for Operations Benefit Cost Analysis (TOPS-BC)

T ra rans nsit Cate tegor

  • ry

y

slide-20
SLIDE 20

Act ctive ve Tra rans nspo porta rtation tion Cate tego gory y

Proje jects cts impa pacti ting ng number ers s of T Traffic c Area ea Zones es

TAZ is a proxy for density and mix of uses Buffer project limits, count TAZs Document

  • Highe

her num umber er of T TAZ AZs affec ected ed res esul ult t in hi highe her r normali lize zed d score

slide-21
SLIDE 21

Project Score Planning Factors Project Readiness Cost/Benefit Analysis

Project ect Selec lectio tion n Proce cess ss

slide-22
SLIDE 22

Sco cori ring ng Proce cess ss

slide-23
SLIDE 23

App pprova val l Proce cess ss

TPB Publi lic c Input TAC

slide-24
SLIDE 24

Qu Quest estions? ions?

Ryan Collins Capital Area Metropolitan Planning Organization ryan.collins@campotexas.org David d Paine ne Freese and Nichols david.paine@freese.com