PEA Microgrid Prachya Laochoo Engineer Smart Grid Planning - - PowerPoint PPT Presentation

pea microgrid
SMART_READER_LITE
LIVE PREVIEW

PEA Microgrid Prachya Laochoo Engineer Smart Grid Planning - - PowerPoint PPT Presentation

PEA Microgrid Prachya Laochoo Engineer Smart Grid Planning Division, PEA, Thailand PEA Thailand 1 Microgrid IEC TS 62898-2-2018: group of interconnected loads and distributed energy resources with defined electrical boundaries that acts as a


slide-1
SLIDE 1

PEA Thailand 1

PEA Microgrid

Prachya Laochoo Engineer Smart Grid Planning Division, PEA, Thailand

slide-2
SLIDE 2

PEA Thailand 2

IEEE: a group of interconnected loads and Distributed Energy Resources (DER) with clearly defined electrical boundaries that acts as a single controllable entity with respect to the grid. It can connect and disconnect from the grid to enable operation in both grid-connected or island modes.

IEC TS 62898-2-2018: group of interconnected loads and distributed energy resources with defined electrical boundaries that acts as a single controllable entity and is able to operate in both grid-connected or island mode.

Microgrid

slide-3
SLIDE 3

PEA Thailand 3

  • To accumulate energy produced by large, less

responsive thermal generation plants (also RE) and then re-dispatch it based on peak demand.

  • Storage facilities were largely financed by

arbitrage (buying energy at a low price and selling it at a higher price).

  • Energy storage currently contributes to

reliability, efficiency, power quality, transmission optimization, black-start functions, and support Demand Response (DR) function.

9000.00 11000.00 13000.00 15000.00 17000.00 19000.00 21000.00 23000.00 25000.00 1 834 1667 2500 3333 4166 4999 5832 6665 7498 8331 9164 9997 10830 11663 12496 13329 14162 14995 15828 16661 17494 Hours ( x 2 ) System Gen (MW) 95% of Peak = 22809 MW : 87 Hours per year 90% of Peak = 21609 MW : 650 Hours per year

5% OF PEAK DEMAND < 100 HOURS

Energy Storage System (ESS)

slide-4
SLIDE 4

PEA Thailand 4

STAGE 1: Pilot

PEA Microgrid

Khun Pae

Chang Mai

R&D

Betong Yala

Mae Sariange

Mae Hongson

slide-5
SLIDE 5

PEA Thailand 5

Khun Pae Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

90kW in 2019

slide-6
SLIDE 6

PEA Thailand 6

Microgrid Controller BESS 100kW/100kWh Mobile App

Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

Remote Control Switch

slide-7
SLIDE 7

PEA Thailand 7

AC/DC AC/DC BESS PV Hydro

ชุมชน อนามัย โรงเรียน ชุมชน ชุมชน

400V 22kV S1 S2 S3 S4

ชุมชน

Grid Connected

Microgrid at Khun Pae (R&D)

slide-8
SLIDE 8

PEA Thailand 8

AC/DC AC/DC BESS PV Hydro

ชุมชน อนามัย โรงเรียน ชุมชน ชุมชน

400V 22kV S1 S2 S3 S4

ชุมชน

Islanding

Microgrid at Khun Pae (R&D)

slide-9
SLIDE 9

PEA Thailand 9

Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

slide-10
SLIDE 10

PEA Thailand 10

Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

slide-11
SLIDE 11

PEA Thailand 11

Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

slide-12
SLIDE 12

PEA Thailand 12

Khun Pae Microgrid (R&D Project) Chom Tong, Chiang Mai

BESS supply power during islanding condition (24 Apr 2018).

slide-13
SLIDE 13

PEA Thailand 13

Energy Storage (3MW/1.5MWh) to cover significant load 1 Units Micro grid Controller

with Building Energy Management System (BEMS) and Fault Location Isolation & Service Restoration (FLISR)

1 System Communication System 1 System Interface System 1 System

Mae Sariang

Microgrid at Mae Sariang

slide-14
SLIDE 14

PEA Thailand 14

  • 1. Islanding
  • 2. Intermittent Resources Integration
  • 3. Peak Shaving

Others e.g.

  • Generation PV forecast
  • Load forecast

Microgrid at Mae Sariang: Modes of Functions

slide-15
SLIDE 15

PEA Thailand 15

with Fault Location Isolation & Service Restoration (FLISR)

Microgrid at Mae Sariang

slide-16
SLIDE 16

PEA Thailand 16

with Fault Location Isolation & Service Restoration (FLISR)

Microgrid at Mae Sariang

slide-17
SLIDE 17

PEA Thailand 17

with Fault Location Isolation & Service Restoration (FLISR)

Microgrid at Mae Sariang

slide-18
SLIDE 18

PEA Thailand 18

with Fault Location Isolation & Service Restoration (FLISR)

Microgrid at Mae Sariang

slide-19
SLIDE 19

PEA Thailand 19

with Fault Location Isolation & Service Restoration (FLISR)

Microgrid at Mae Sariang

slide-20
SLIDE 20

PEA Thailand 20

Betong

Energy Storage (4MW/4MWh) to cover significant load 1 Units Micro grid Controller

with Fault Location Isolation & Service Restoration (FLISR)

1 System Communication System 1 System Interface System 1 System

Scope of Work Existing

Diesel Gen. (1MW) 7 Units

Microgrid at Betong, Yala Province

slide-21
SLIDE 21

PEA Thailand 21

Microgrid at Betong, Yala Province

slide-22
SLIDE 22

PEA Thailand 22

THANK YOU FOR YOUR ATTENTION