SLIDE 1
PalPilot Power Cord Shenzhen Plant Location: GongMing - - PowerPoint PPT Presentation
PalPilot Power Cord Shenzhen Plant Location: GongMing - - PowerPoint PPT Presentation
PalPilot Power Cord Shenzhen Plant Location: GongMing Loucun 2 nd Industrial park Shenzhen China Area: 13,8000 m^2(land) , 55,000 m^2(manufacturing) Employees: 1,500 Awin Cable & Wire ISO9001
SLIDE 2
SLIDE 3
ISO9001 认证 ISO140001认证 SONY GP/SPP认证 Awin Cable & Wire
The 2nd of top 500 enterprises in Guang Dong China in 2013 “Distinguish Industrial Park in Shenzhen ” Award in 2013 Member of wire and cable of China National Standard Committee
SLIDE 4
Sales Turnover
20 40 60 80 100 120 140 160 180 2009 2010 2011 2012 2013 2014 50 75 91 121 139 163 USD mil
Cable :USD 34 mil Power cord:USD105 mil
SLIDE 5
Partners
SLIDE 6
Partners
SLIDE 7
Product Range
Power Cords
SLIDE 8
Vertical Chain
SLIDE 9
Engineering
PVC Development
SLIDE 10
Quality Management
SLIDE 11
SLIDE 12
Function Requirement:
- 200% of the safety requirement
- 150% of customer requirement
IPQC Control
- On line inspection every 2 hours
- CPK test (> 1.33) for CTF
Test Mark
- a dot marked by tester automatically
when pass high-pot test Quality Management
SLIDE 13
Target in 2014
ITEM TARGET Frequency Measurement
Customer Satisfaction ≥90% Yearly Customer Survey Paper Quality Complaint Monthly FG Pass Rate ≥99.9% Monthly Shipped F/G Lots / Total Lots *100% Hazardous Substance Monthly Incoming material rate ≥99.5% Monthly Incoming check lot /Total incoming lot ×100%
Quality Goal
SLIDE 14
Environment Management
- EU ROHS directive and EU REACH Regulation
- China ROHS directive; Norway PoHS directive
- California 65 proposal and HR4040
- PAHS ( polycyclic aromatic hydrocarbons ) control
- Adjacent benzene two formic acid salt control
Comply with the latest rules of Global environment 0rganization
SLIDE 15
Production Facilities
Copper Wiring Lines
PVC Lines
Copper Wire Twisting Lines
SLIDE 16
Cable Extrusion Lines
18 Extrusion Lines Capacity
25 mil meters/month Production Facilities
SLIDE 17
Power Cord lines
42 Production Lines
Capacity
17 mil PCS /Month Production Facilities
SLIDE 18
Safety Approval
SLIDE 19
Environmental Lab
- Comprehensive tester
- Mechanical tester
- Bending test
- Pull test
- Projector
- Aging chamber
- Electrical tester
- Hi-pot test
- Voltage drop test
- Flame retardance test
- Environment tester
- ROHS test
Test Laboratory
SLIDE 20
Test Laboratory
SLIDE 21