Final: 4/29/2017 Overview of White Plains United Methodist Church Proposed Parking Lot Expa nsion And Offsite Drainage Issues Presentation for White Plains Members & Friends April 30, 2017 1 No place to park! We cant hear Ray.so


slide-1
SLIDE 1

Overview of White Plains United Methodist Church Proposed Parking Lot Expansion And Offsite Drainage Issues

Presentation for White Plains Members & Friends

April 30, 2017

1

Final: 4/29/2017

slide-2
SLIDE 2

No place to park!

We can’t hear Ray….so let’s just go!!!

slide-3
SLIDE 3

3

slide-4
SLIDE 4

What are the Two Projects?

  • 1. Expand the WPUMC Campus

Parking Lot by 35 Spaces

  • 2. Correct the Storm Water Runoff

problem significantly impacting

  • ur neighbors

4

slide-5
SLIDE 5

First …Proposed Parking Expansion

A Typical Sunday Morning at WPUMC

5

slide-6
SLIDE 6

(Removed)

WPUMC....Property Overview

Storm Water Impacted Area

6

slide-7
SLIDE 7

What Parking Expansion Would Look Like

7

slide-8
SLIDE 8

Concept Drawing

  • f Proposed

Parking Lot Addition

Another view …

8

slide-9
SLIDE 9

9

slide-10
SLIDE 10

10

slide-11
SLIDE 11
slide-12
SLIDE 12

Minimum Required Parking Spaces**

  • Fire-Rated Capacity of Sanctuary = 576 persons
  • Minimum Required Spaces = 576/3 = 192 spaces
  • Current Parking Spaces = 164 spaces
  • Shortage = 28 spaces
  • Proposed net Addition = 35 spaces

**Required for Major Building Upgrades or Additions

12

slide-13
SLIDE 13

13

slide-14
SLIDE 14

14

slide-15
SLIDE 15

Next …. The Off-Campus Storm Water Improvement

15

slide-16
SLIDE 16

16

Location of the Problem Ditch

Lower End of WPUMC Parking Lot

Previous Temporary Fix Location of the Storm Water Project Previous Temporary Fix

slide-17
SLIDE 17

17

slide-18
SLIDE 18

Storm Water Over Runs Temporary Wall

18

slide-19
SLIDE 19

19

slide-20
SLIDE 20

20

slide-21
SLIDE 21

A look at What’s Proposed

Some Tree Removals; Re-grading; and Construction of a Wide, Rip-Rap-lined Channel to Handle the Storm Water Flow

21

slide-22
SLIDE 22

Comments ... Questions???

slide-23
SLIDE 23
slide-24
SLIDE 24

Appendix 2

Letter to Storm Water Impacted Neighbors