Overview of CFL Verification Testing Results Jan 2010-Apr 2014 ENERGY STAR Road mapping call on future verification testing of lamps: July 31 st 2014 Taylor Jantz-Sell, EPA CFL Verification Testing Summary 424 models tested from Jan
SLIDE 1
SLIDE 2
CFL Verification Testing Summary
- 424 models tested
from Jan 2010-Apr 2014
- Note products could have
experienced a marginal failure
- n one test and a full failure on a
another test so they count as full failures
SLIDE 3
Products failing one or more tests
- Marginal failure was defined
in CFL 4.0 as one sample exceed the allowable failure rate for one test.
– E.g. 2/6 samples failed rapid cycle when the spec requires 5/6 to pass – Marginal failure triggers elective retesting.
27 68 51 16 12 10 20 30 40 50 60 70 80 Marginally Failed Failed One Test Failed Two Tests Failed Three Tests Failed Four Tests Number of Models
SLIDE 4
Summary of failures by test & batch
- All other tests include
- Start time
- Power factor
- Efficacy
- CRI
- ETLOR
- Very low failure rates
were observed for these tests
SLIDE 5
Interim Life Failures
# of models # Models Tested Passed Marginal Failure Full Failure All Models 424 363 14 47 Bare Spiral 258 226 10 22 Bare Specialty 31 27 1 3 Covered 135 110 3 22
The interim life test looks at how many units are operational at 40% of the lamp’s rated lifetime claim. Note 1 unit failure is considered a pass and 2 unit failures is a marginal failure which allows for elective retesting.
SLIDE 6
Interim Life Failure Results
- Of the 61 models that failed interim life 27 fully failed only
this test
– 9 failed interim life and marginally failed another test
- We’ve had sample sets with 0 surviving lamps
– (0 out of 20 in batch 4)
- 20 models had 50% or less of their samples survive
- 12 models had 25% or less of their samples survive