One Santa Fe Apartments Residents Meeting May 28, 2020 Metro Red - - PowerPoint PPT Presentation

One Santa Fe Apartments Residents Meeting May 28, 2020 Metro Red and Purple le Li Lines: s: 140,0 ,000+ 00+ daily y passenger engers Faster Red and Purple Line Service Arts District Project Area Faster ter and More Frequent uent Red


slide-1
SLIDE 1

One Santa Fe Apartments Residents Meeting May 28, 2020

slide-2
SLIDE 2

Metro Red and Purple le Li Lines: s: 140,0 ,000+ 00+ daily y passenger engers

slide-3
SLIDE 3

Faster Red and Purple Line Service

Arts District Project Area

Faster ter and More Frequent uent Red and Purpl ple e Li Line Se Service ce

slide-4
SLIDE 4

Arts District Project Area

  • Operational improvements

to the Division 20 Rail Yard that aim to accommodate increased service levels on the Metro Red & Purple Lines

  • Improvements include:

› Widening of heavy rail portal › New turnback facility › Expansion and reconfiguration of rail storage tracks

Pro roject ject Ove verview rview

One Santa Fe Tunnel Portal Turnback Facility Storage Tracks

slide-5
SLIDE 5

Arts District Project Area

Pro roject ject Timeline eline

Environmental Planning

2017-2018

Pre- Construction

2018-2019

Construction

2020-2023

Operations

2023

We are Here 5

slide-6
SLIDE 6

Look-Ahe Ahead ad Sc Schedu dule le

Arts District Project Area

*Schedule is subject to change

Activity ty Start Date End Date Pre-Construction

  • Abatement and

Demolition activities

  • National Cold Storage
  • Viertel Central Division

Facility

November 2018 Summer 2019 Construction Summer 2019 Fall 2023 ACTIV IVITY ITY MAY JUN JUN JUL JUL AUG SEP OCT

North th of 1st

st St Bridg

dge Excavation Grading South th of 1st

st St Bridge

dge Utility Relocation Work Bridge Modifications Removal and Installation of Tracks

slide-7
SLIDE 7

Look-Ahe Ahead ad Construction struction

2020 2020-2023 2023

 Construction of storage tracks  Construction of Portal Widening and Turnback Facility  1st Street Bridge modifications  Sidewalk widening and Center Street Landscaping  Welding and storage of Purple Line rail

*Work is subject to change

slide-8
SLIDE 8

Construction struction Comin ming g So Soon

 Site surveying  Potholing for utilities  Removal of asphalt and non- electrified tracks

*Work is subject to change

slide-9
SLIDE 9

Cur urrent rent Work rk

National Cold Storage Facility

Road C Slurry Cap

9

slide-10
SLIDE 10

Cur urrent rent Work rk

National Cold Storage Facility

Capping Conduits

10

slide-11
SLIDE 11

Cur urrent rent Work rk

National Cold Storage Facility

Utilities Installation

11

slide-12
SLIDE 12

Cur urrent rent Work rk

National Cold Storage Facility

Welding Area Fence Line Marks

12

slide-13
SLIDE 13

What’s Happened So Far

Demolition and Initial Grading Complete

13

slide-14
SLIDE 14

What’s Happened So Far

Demolition of Buildings and Grading of the Site

14

slide-15
SLIDE 15

What’s Happened So Far

Installation of Temporary Parking Area (Metro Vehicles Only)

15

slide-16
SLIDE 16

Utility lity Re Relocation

  • cation Activ

ivities ities

 When en: : Through Fall 2020  Where: ere:  Within the Division 20 Yard  Work to begin just north of 1st St Bridge and continue south towards Metro’s Division 20 Parking Lot  Activiti vities es include lude:  Sawcutting, trench excavation, conduit installation, backfill and paving  Antic icipated pated work rk hours: rs:  Monday through Friday  7am to 4pm

*Work is subject to change

N

Utilit lity Reloc locat ation ion Work k Area ea

slide-17
SLIDE 17

Ut Util ility ity Inst stallat allation ion

Sample of ongoing utilities work in the yard

*Work is subject to change

17

slide-18
SLIDE 18

Re Request uest for r Nigh ghttime ttime Noise se Varia riance nce

*Work is subject to change

*Work is subject to change

Because the work is being performed on an active yard, the contractor will have to wait until after operating hours to perform certain work. Work hours would be 9 p.m. to 3 a.m. In addition, an exemption will minimize construction impacts on the surrounding community by accelerating the completion of work such as:  Directional boring  Installation of underground conduits and manhole structures  Cut overs to existing tracks and systems

18

slide-19
SLIDE 19

Proposed ed Exten ended ded Work Hours

*Work is subject to change

*Work is subject to change

Extended d work hours s will:  Minimize overall duration of most significant construction impacts  Maximize efficiency  Nightt httime me Work: Overnight work within designated noise limits Propos posed d extended work hours May 2020 through December 2022  Monday through Friday: 9pm to 7am the next day  Friday: 9pm to 11:59pm  Saturda day: y: 12am to 8am and 6pm to 11:59pm  Sunday: y: 12am to 11:59pm

Metro Purple Line Extension Crew backfilling a trench at night with directed lighting fixtures

19

slide-20
SLIDE 20

Pro roposed

  • sed Work

rk Act ctivities ivities

*Work is subject to change

*Work is subject to change

Pro roposed

  • sed work

rk activities ies:

 Trenching  Directional boring  Installation of underground conduits and manhole structures  Grading  Pavement restoration  Soil testing and stockpiling  Hauling  Mobilization and demobilization of construction services

20

slide-21
SLIDE 21

Construction struction Mi Mitiga gations tions

Best st pra racti ctices ces on the const struc ructio ion si site:  Equipment and staging areas shall be located away from noise-sensitive receivers  Minimize high impact devices such as jackhammers and hoe rams  Utilize lower impact devices such as concrete crushers and pavement saws  Refrain from idling of equipment

21

slide-22
SLIDE 22

Construction struction Mi Mitiga gations tions

Noise barrier measures. Rail pile at the yard for Purple Line installation. Constant watering keeps dust down.

22

slide-23
SLIDE 23

Construction struction Mi Mitiga gations tions

Keeping dust down by watering often. Installing sound blankets.

23

slide-24
SLIDE 24

Pro roject ject Websit bsite e – metro tro.net/ .net/divis division20 ion20

25

slide-25
SLIDE 25

Ho How t w to Re Reac ach h Us

 Call l us on the Proj

  • jec

ect t Hotli line ne: : 21 213-922 922-69 6934 34  For project questions, concerns and complaints  Live during construction work hours  Monday through Friday, 7am-5pm  After 5pm: Leave a voicemail; staff with return call within 24 hours  Proje

  • ject

ct Email: l: purplelineext@metro.net Staff will reply within 24 hours  Stay Connec ecte ted  Construction notices posted online at metro.net/division20  Receive email project updates and construction notices

26

slide-26
SLIDE 26

Conta ntact ct Info

Arts District Project Area

213-922-6934 purplelineext@metro.net metro.net/division20

27