of DryPorts Development in Nepal Gopal Prasad Sigdel, Joint - - PowerPoint PPT Presentation

of
SMART_READER_LITE
LIVE PREVIEW

of DryPorts Development in Nepal Gopal Prasad Sigdel, Joint - - PowerPoint PPT Presentation

Status of DryPorts Development in Nepal Gopal Prasad Sigdel, Joint secretary, Ministry of Physical Planning and Transport Nepal New Delhi ,Aug 1-2, 2018 1 NEP AL CHINA Area : 147,181 Sq. Km. Population: 27.8 Mill. GDP Per capita :


slide-1
SLIDE 1

Gopal Prasad Sigdel, Joint secretary, Ministry of Physical Planning and Transport Nepal New Delhi ,Aug 1-2, 2018

Status

  • f

DryPorts Development in Nepal

1

slide-2
SLIDE 2

Kathmandu

NEP AL

Area : 147,181 Sq. Km. Population: 27.8 Mill. GDP Per capita : US$865

CHINA

2

slide-3
SLIDE 3

Rasuwa (R asuwa) Yari (Humla) Olang chung

  • la

Kimathanka (T aplejung) (Sankhuwasabha) Nechung (Mus tang)

NORTH

R iwu L izi Pulan Larke (Gorkha) Mugu (Mugu) Hyazimang Dodhara Chadani (Kanchanpur) ICD (Under Construction) (First Phase) Second Phase(MOU) Third Phase(MOU) Inland ClearanceDepots (ICDs) Under Operation Integrated Check Posts (ICPs)Proposed Th hird CFS/ICD

Major Trade & Transit Points of Nepal

Survey DesigningStage Nepal Intermodal Transport Development Board, Kathamndu, Nepal, Phone: +977-1-4440936, 4439664, Email: nitb@wlink.com.np

slide-4
SLIDE 4

Rasuwa (R asuwa) Olang chung

  • la

(T aplejung) Yari (Humla) Kimathanka (Sankhuwasabha) Nechung (Mus tang)

NORTH

R iwu L izi Pulan Larke (Gorkha) Mugu (Mugu) Hyazimang Dodhara Chadani (Kanchanpur) Existing Railway Connectivity Proposed Railway Connectivity CFS/ICD

Status of Railway Connectivity

Nepal Intermodal Transport Development Board, Kathamndu, Nepal, Phone: +977-1-4440936, 4439664, Email: nitb@wlink.com.np

slide-5
SLIDE 5

TRANSPORT INFRASTRUCTURE(2016)

ROADS LENGTH

STRATEGIC ROAD NETWORK 12498 KM LOCAL ROAD NETWORK 57632 KM RAILWAYS J AYNAGAR(INDIA)-J ANAKPUR 51 KM RAXAUL(INDIA)- BIRGUNJ ICD 5 KM AIRFIELDS INTERNATIONAL 1 NO DOM ESTIC 48 NOS DRY PORTS ROAD BASED 4 NOS RAIL BASED 1 NO

slide-6
SLIDE 6

ROADS CONNECTING DRY PORTS

DRY PORTS ROADS LENGTH CONNECTING STATUS AND FUTURE PLANS

BIRGUNJ ICD 29Km E/ W HIGHWAY Pathalaiya 6 Lane road under construction ICD under Operation BIRATNAGAR ICD 31KM E/ W HIGHWAY Itahari 6 Lane Road under construction ICD under consideration KAKARBHITTA ICD 1 KM E/ W HIGHWAY Kakadbhitta Under Operation BHAIRAHAWA ICD 24 KM E/ W HIGHWAY Butwal 6 Lane Road under construction TATOP ANI ICD 114 KM Kathmandu UNDER CONSTRUCTION RASUAWAGADI 84 KM Galchhi Prithvi Highway UNDER CONSTRUCTION DODHARA CHANDINI 9 KM M ahendranagar E/ W HIGHWAY UNDER CONSTRUCTION KOROLLA 110 KM Jomsom Planned KATHM ANDU CHOBHAR 9 KM Kathmandu UNDER CONSTRUCTION

slide-7
SLIDE 7

FOREIGN TRADE SITUATION

Status of Nepal as perDoing Business Report 2015 Export Cost per container US$ 2545 Export Time 40 days Import cost per container US$ 2650 Import Time 39 days Stream Share of Total Trade(2016/17) Export 6.9 % Import 93.09% 100% India 64.92% Overseas 35.08% 100%

4

Source: WB & GON

slide-8
SLIDE 8

Transport Infrastructure (2016)

8

Roads Local Roads (57,632 Km) Strategic Roads (12,473 Km) Railways

Jayanagar (India) - Janakpur (Nepal)

(51 KM) Raxaul (India) – Birgunj (Nepal) (5 KM)

Airfields 48 Nos. (registered) Dryports Road based (3+1) Rail based(1)

slide-9
SLIDE 9

DRY PORTS(RAIL BASED)

slide-10
SLIDE 10

Dry Ports (Roadbased)

10

BIRA TNAGAR BHAIRAHA W A T A T OP ANI K A K A RBHITT A

slide-11
SLIDE 11

Dry Ports (Roadbased)

  • BIRATNAGAR

BHAIRAHAWA

slide-12
SLIDE 12

Dry Ports (Roadbased)

TATOP ANI KAKARHITTA

slide-13
SLIDE 13

13

slide-14
SLIDE 14

DRY PORTS

Bhairahawa

Birgunj

Kakarbhitta Biratnagar Tatopani (Under Construction)

UNES C A P

20

slide-15
SLIDE 15

Future Dryports

15

  • Under Construction:
  • Tatopani ICD
  • Source: PR China (Turn Key)
  • Connectivity: Asian Highway 42 (AH42)

(Construction period is extended due to earthquake)

  • Proposed:

Rasuwa: (Assistance : PRChina)

  • Detail Design is about tofinalize.
  • Construction contract will be awarded soon.

– CFS/ICD at Kathmandu Valley (Assistance: WB):

  • Awaiting for Construction Tender Process.

– Korola (Mustang):

  • Pre-feasibility study has been completed.

– Dodhara Chadani (Kanchanpur)-AH2:

  • Feasibility study is ongoing.
slide-16
SLIDE 16

Tatopani Dry Port (Under Construction)

23

Rescue Project

slide-17
SLIDE 17

Rasuwa Dry Port

Layout Design

Admin Building 5000 Sq.M Warehouse 750 Sq.M. Appraisal Shed 2nos. Total 2080 Sq.M. Parking Area for 350 trucks

slide-18
SLIDE 18

Kathmandu CFS/ ICD (Google View )

18

slide-19
SLIDE 19

Korola (M ustang)

19

slide-20
SLIDE 20

Dodhara Chadani (Kanchanpur)

20

slide-21
SLIDE 21

Challenges

  • Geological status of Roadsand

Infrastructure

  • International Recognition of Dryports
  • Transshipment facility and additional Port

Connectivity

  • International Guidelines for leasingout of

ports

  • Road carriage act and Regulation
  • Rail carriage act and regulation
  • Dry Port Management issues

(Managerial/Technical/Awareness)

  • Reduction in Import/ExportProcess

30

slide-22
SLIDE 22

Way Forward:

  • Cost
  • f

logistics and transit transportation for landlocked countries is > 15% than coastal countries

  • UNESCAP

needs to address capacity activities for managerial, technical and building awareness issues regarding dry port taking in mind

  • f

its importance

  • Should conduct national levelactivities also
  • International agency should focus on bringing out

transshipment, guidelines related to Registration of LOCODE, Locate dry port leasing, port on the international shipping map, etc.

  • Ratification of Intergovernmental Agreement on Dry

ports

31

slide-23
SLIDE 23

Thank Y

  • u For Y
  • ur

Attention!