Gopal Prasad Sigdel, Joint secretary, Ministry of Physical Planning and Transport Nepal New Delhi ,Aug 1-2, 2018
Status
- f
DryPorts Development in Nepal
1
of DryPorts Development in Nepal Gopal Prasad Sigdel, Joint - - PowerPoint PPT Presentation
Status of DryPorts Development in Nepal Gopal Prasad Sigdel, Joint secretary, Ministry of Physical Planning and Transport Nepal New Delhi ,Aug 1-2, 2018 1 NEP AL CHINA Area : 147,181 Sq. Km. Population: 27.8 Mill. GDP Per capita :
Gopal Prasad Sigdel, Joint secretary, Ministry of Physical Planning and Transport Nepal New Delhi ,Aug 1-2, 2018
1
Kathmandu
Area : 147,181 Sq. Km. Population: 27.8 Mill. GDP Per capita : US$865
CHINA
2
Rasuwa (R asuwa) Yari (Humla) Olang chung
Kimathanka (T aplejung) (Sankhuwasabha) Nechung (Mus tang)
NORTH
R iwu L izi Pulan Larke (Gorkha) Mugu (Mugu) Hyazimang Dodhara Chadani (Kanchanpur) ICD (Under Construction) (First Phase) Second Phase(MOU) Third Phase(MOU) Inland ClearanceDepots (ICDs) Under Operation Integrated Check Posts (ICPs)Proposed Th hird CFS/ICD
Major Trade & Transit Points of Nepal
Survey DesigningStage Nepal Intermodal Transport Development Board, Kathamndu, Nepal, Phone: +977-1-4440936, 4439664, Email: nitb@wlink.com.np
Rasuwa (R asuwa) Olang chung
(T aplejung) Yari (Humla) Kimathanka (Sankhuwasabha) Nechung (Mus tang)
NORTH
R iwu L izi Pulan Larke (Gorkha) Mugu (Mugu) Hyazimang Dodhara Chadani (Kanchanpur) Existing Railway Connectivity Proposed Railway Connectivity CFS/ICD
Status of Railway Connectivity
Nepal Intermodal Transport Development Board, Kathamndu, Nepal, Phone: +977-1-4440936, 4439664, Email: nitb@wlink.com.np
TRANSPORT INFRASTRUCTURE(2016)
ROADS LENGTH
STRATEGIC ROAD NETWORK 12498 KM LOCAL ROAD NETWORK 57632 KM RAILWAYS J AYNAGAR(INDIA)-J ANAKPUR 51 KM RAXAUL(INDIA)- BIRGUNJ ICD 5 KM AIRFIELDS INTERNATIONAL 1 NO DOM ESTIC 48 NOS DRY PORTS ROAD BASED 4 NOS RAIL BASED 1 NO
DRY PORTS ROADS LENGTH CONNECTING STATUS AND FUTURE PLANS
BIRGUNJ ICD 29Km E/ W HIGHWAY Pathalaiya 6 Lane road under construction ICD under Operation BIRATNAGAR ICD 31KM E/ W HIGHWAY Itahari 6 Lane Road under construction ICD under consideration KAKARBHITTA ICD 1 KM E/ W HIGHWAY Kakadbhitta Under Operation BHAIRAHAWA ICD 24 KM E/ W HIGHWAY Butwal 6 Lane Road under construction TATOP ANI ICD 114 KM Kathmandu UNDER CONSTRUCTION RASUAWAGADI 84 KM Galchhi Prithvi Highway UNDER CONSTRUCTION DODHARA CHANDINI 9 KM M ahendranagar E/ W HIGHWAY UNDER CONSTRUCTION KOROLLA 110 KM Jomsom Planned KATHM ANDU CHOBHAR 9 KM Kathmandu UNDER CONSTRUCTION
Status of Nepal as perDoing Business Report 2015 Export Cost per container US$ 2545 Export Time 40 days Import cost per container US$ 2650 Import Time 39 days Stream Share of Total Trade(2016/17) Export 6.9 % Import 93.09% 100% India 64.92% Overseas 35.08% 100%
4
Source: WB & GON
8
Roads Local Roads (57,632 Km) Strategic Roads (12,473 Km) Railways
Jayanagar (India) - Janakpur (Nepal)
(51 KM) Raxaul (India) – Birgunj (Nepal) (5 KM)
Airfields 48 Nos. (registered) Dryports Road based (3+1) Rail based(1)
Dry Ports (Roadbased)
10
BIRA TNAGAR BHAIRAHA W A T A T OP ANI K A K A RBHITT A
BHAIRAHAWA
TATOP ANI KAKARHITTA
13
DRY PORTS
Bhairahawa
Kakarbhitta Biratnagar Tatopani (Under Construction)
20
15
(Construction period is extended due to earthquake)
–
Rasuwa: (Assistance : PRChina)
– CFS/ICD at Kathmandu Valley (Assistance: WB):
– Korola (Mustang):
– Dodhara Chadani (Kanchanpur)-AH2:
23
Layout Design
Admin Building 5000 Sq.M Warehouse 750 Sq.M. Appraisal Shed 2nos. Total 2080 Sq.M. Parking Area for 350 trucks
Kathmandu CFS/ ICD (Google View )
18
Korola (M ustang)
19
Dodhara Chadani (Kanchanpur)
20
30
Way Forward:
logistics and transit transportation for landlocked countries is > 15% than coastal countries
needs to address capacity activities for managerial, technical and building awareness issues regarding dry port taking in mind
its importance
transshipment, guidelines related to Registration of LOCODE, Locate dry port leasing, port on the international shipping map, etc.
ports
31