North Meadows Secondary Plan MUNICIPALITY OF STRATHROY-CARADOC
Initial Public Meeting – May 15, 2019
North Meadows Secondary Plan MUNICIPALITY OF STRATHROY-CARADOC - - PowerPoint PPT Presentation
North Meadows Secondary Plan MUNICIPALITY OF STRATHROY-CARADOC Initial Public Meeting May 15, 2019 Why We Are Here Introductions and Overview Examine opportunities to accommodate growth and development Gather thoughts and
Initial Public Meeting – May 15, 2019
unique or otherwise select characteristics which warrant a comprehensive study of the area;
policy guidance for a specific area;
become part of the Official Plan through an amendment; and
environment, servicing, land use justification).
The North Meadows Secondary Plan Area will include the identification of: a) Areas for low, medium and high density residential purposes, b) General road pattern and pedestrian circulation system, c) Areas to be maintained in a natural state or reserved as open space, d) Need for, location, and size of active / passive parks and school facilities, e) Buffering measures to reduce potential land use conflicts, f) Measures to enhance and improve the quality of life for future residents, and g) Measures to address water, wastewater and drainage infrastructure
Consider where different residential uses and densities should be located with respect to adjacent land uses, natural features, and the County Road (Second St.)
Consider how you and your family would use the parks in the North Meadows Secondary Planning Area. Consider what you like and what is missing from the parks that you currently use.
Consider what kinds of things would encourage you and your family to walk and bike more. The vision for the community is as a pedestrian scaled residential community. The Rotary Trail provides a vital pedestrian connection directly into downtown.
The study area has woodland, wetland, and stream natural environment features within it. These woodlands and streams in the study area create unique opportunities to integrate these features into the residential community by locating trails adjacent to them, creating natural vistas, or having houses back on to them.
Project Stage Deliverable / Milestones Timing Stage 1: Project Initiation Initial Meeting with Staff and Consultation with the Approval Authority April 2019 Stage 2: Launch of Consultation and Public Engagement Campaign Initial Public Workshop and Stakeholder Workshop Spring 2019 Stage 3: Technical Analysis Draft Technical Studies (Traffic, Servicing, Environmental, Hazards, Parks & Trails) Summer 2019 Stage 4: Presentation of Background Report and Land Use Plan Options Interim Report #1 – Draft Issues and Land Use Options Public, Stakeholder, and Council Workshop to present
Fall 2019 Stage 5: Preparation of Secondary Plan Interim Report #2 - Draft Secondary Plan with Preferred Land Use Option Early 2020 Stage 6: Presentation of Draft Plan and Adoption of Final Plan Present Draft Secondary Plan to Public & Council Adoption of Final Plan Spring 2020