Nor orth Sh Shor ore L Levee Cities of Aberdeen and Hoquiam Funding: Chehalis River Basin Flood Authority Design Team: KPFF Consulting Engineers Watershed Science & Engineering GeoEngineers Maul, Foster, & Alongi


  1. Nor orth Sh Shor ore L Levee Cities of Aberdeen and Hoquiam Funding: • Chehalis River Basin Flood Authority Design Team: • KPFF Consulting Engineers • Watershed Science & Engineering • GeoEngineers • Maul, Foster, & Alongi

  2. Existing C Conditions s – Flood Ri Risk (Dec ecem ember er 10, 10, 20 2015 high t tide ) F Street in Aberdeen Riverside Avenue in Hoquiam

  3. Existing C Conditions s – Flood Ri Risk (Janu nuary 4 4-5, 5, 2 2015 015 rainfall e event ) Conger Street in Aberdeen Oak Street in Aberdeen

  4. Existing C Conditions s – FE FEMA M Mapping (Blue = = S Speci cial F Flood ood Hazard Area)

  5. Aberdeen a and Hoquiam c m currently p pay $ $1.78 millio illion in in annual N l NFIP p premiu iums (40.4% o of premiums ms paid i in Chehalis B Basin).

  6. Paid id NFIP c cla laim ims in in Aberdeen en a and Hoq oquiam t m tot otal $6.5 millio illion sin ince 1 1978 (7% o of cla laim ims p paid id in in the C Chehalis B Basin since 197 1978).

  7. Not ote: Trend s shows on ongoing l los oss of NFIP c coverage a e and t therefore less p le public licly ly a availa ilable le d data. Pos ossible e explanation ons f for or trend: Switch t h to pr private e po policies es t that a t are e • no not ba backed ed b by NFIP Low pr prices es a are enab e enabling cash sh • tran ansa sactions w s witho hout need f t need for mortga gage Sel Seller ers are e act cting a as pr private l e lender enders • Low rea eal es estate a e activi vity ( (ho homes a es are e • pa paid off a and few ne new m mortgages) es)

  8. Living i in a Spec ecial Flood H Hazard Area ea • Properties are at risk for flooding. ($$$) • NFIP regulations add cost and complexity to development and redevelopment. • Redevelopment: If cumulative value of improvements made to a structure over past five years exceeds 50% of market value, structure must be brought into compliance with flood code. ($$$) • Flood insurance is mandatory with mortgages. • Rates are high and are increasing annually. ($$$)

  9. Living i in a Spec ecial Flood H Hazard Area ea • Properties are at risk for flooding. ($$$) • NFIP regulations add cost and complexity to development and redevelopment. • Redevelopment: If cumulative value of improvements made to a structure over past five years exceeds 50% of market value, structure must be brought into compliance with flood code. ($$$) • Flood insurance is mandatory with mortgages. • Rates are high and are increasing annually. ($$$) ECONOMIC LOSS, STIFLED INVESTMENT, AND LOW PROPERTY VALUES

  10. Living i in a Spec ecial Flood H Hazard Area ea • Properties are at risk for flooding. ($$$) • NFIP regulations add cost and complexity to development and redevelopment. • Redevelopment: If cumulative value of improvements made to a structure over past five years exceeds 50% of market value, structure must be brought into compliance with flood code. ($$$) • Flood insurance is mandatory with mortgages. • Rates are high and are increasing annually. ($$$) ECONOMIC LOSS, STIFLED INVESTMENT, AND LOW PROPERTY VALUES BUILD LEVEE AND DRAINAGE IMPROVEMENTS, GET OUT OF SFHA

  11. Levee  Remove 3 No North S Shore L 3,100 p 100 properties s from SFHA.

  12. Des esign & gn & Con onstruct ction P Proces ess 1. Surveying, Modeling, & Analysis • Aerial photography and photogrammetry • On-ground topographic surveying • Bathymetric surveying • Hydrologic and hydraulic modeling • Geotechnical investigation 2. First Phase of Public Outreach, Government & Agency Coordination 3. Develop Preliminary Design & Science Package, Submit to FEMA 4. Receive Conditional Letter of Map Revision (CLOMR) – Important! 5. Second Phase of Public Outreach, Government & Agency Coordination 6. Final Design, Permitting, & ROW Acquisition 7. Construction Levee Certification & Letter of Map Revision (LOMR)  Protected Areas Change from 8. SFHA to Zone X

  13. Des esign & gn & Con onstruct ction P Proces ess 1. Surveying, Modeling, & Analysis • Aerial photography and photogrammetry • On-ground topographic surveying • Bathymetric surveying • Hydrologic and hydraulic modeling • Geotechnical investigation 2. First Phase of Public Outreach, Government & Agency Coordination 3. Develop Preliminary Design & Science Package, Submit to FEMA 4. Receive Conditional Letter of Map Revision (CLOMR) – Important! 5. Second Phase of Public Outreach, Government & Agency Coordination We are here. 6. Final Design, Permitting, & ROW Acquisition 7. Construction Levee Certification & Letter of Map Revision (LOMR)  Protected Areas Change from 8. SFHA to Zone X

  14. Wor ork Com Completed ed 1. Surveying, Modeling, & Analyses

  15. Wor ork Com Completed ed 2. First Phase of Public Outreach, Government & Agency Coordination

  16. Wor ork Com Completed ed 3. Develop Preliminary Design & Science Package, Submit to FEMA

  17. Wor ork Com Completed ed 4. Receive Conditional Letter of Map Revision (CLOMR)

  18. Upc pcoming T g Tasks 5. Second Phase of Public Outreach, Government & Agency Coordination 6. Final Design, Permitting, & ROW Acquisition 7. Construction 8. Levee Certification & Letter of Map Revision (LOMR)  Protected Areas Change from SFHA to Zone X

  19. Upc pcoming T g Tasks 5. Second Phase of Public Outreach, Government & Agency Coordination * 6. Final Design, Permitting, & ROW Acquisition 7. Construction 8. Levee Certification & Letter of Map Revision (LOMR)  Protected Areas Change from SFHA to Zone X In progress, funded through Chehalis River Basin Flood Authority and State * Supplemental Capital Budget ($4.6 million).

  20. Upc pcoming T g Tasks 5. Second Phase of Public Outreach, Government & Agency Coordination * 6. Final Design, Permitting, & ROW Acquisition 7. Construction 8. Levee Certification & Letter of Map Revision (LOMR)  Protected Areas ** Change from SFHA to Zone X In progress, funded through Chehalis River Basin Flood Authority and 2018 State * Supplemental Capital Budget ($4.6 million) ** $75 million needed -- 2019-2021 Biennium State Capital Budget request

  21. Part of of t the TimberWorks s Master er P Plan

  22. Fry Cr Creek eek Pro roject Coordina nation: n: Future P Pump St Station on

  23. Tha hank Y You ou Kris Koski, PE City Engineer City of Aberdeen (360) 537-3218 kkoski@aberdeenwa.gov www.ezview.wa.gov/aberdeenfloodrelief

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.