Nine Dot Solutions Consulting Mechanical Engineers Pieter van Zyl - - PowerPoint PPT Presentation
Nine Dot Solutions Consulting Mechanical Engineers Pieter van Zyl About Nine Dot Nine Dot is a consulting engineering company that specialises in structural analysis and design Specialities include - Structural audits and failure analyses by
Consulting Mechanical Engineers
Pieter van Zyl
Nine Dot is a consulting engineering company that specialises in structural analysis and design Specialities include
Similar
analyses
procedures
evaluation or continuous monitoring purposes
supporting calculations are used as base line for refurbishment plans and possible capacity upgrades
Bucket Wheel Reclaimer capacity upgrade 1775tph – 2250tph
Detailed installation procedure Manufacturing drawings of new/modified equipment
Addition of Tippler top stop mechanism
accurately simulate slew bearing element forces
bearing life based on structural configuration and construction details
finite life, due to harsh
results and structural inspection reports are used to estimate expectancies
3 Cracks 20, 50, 30mm S&F 2010 O’Connor Corrosion on cab support S&F 2010 O’Connor 3 Cracks on take up 35, 15, 15mm S&F 2010 O’Connor Corrosion luff connection S&F 2010 O’Connor Corrosion on mast pivot S&F 2010 O’Connor 4 Cracks 25, 30, 30, 25mm Corrosion S&F 2010 Corrosion S&F 2010 2 Cracks 90, 30mm S&F 2010 Corrosion S&F 2010 Corrosion S&F 2010 1 Cracks 60mm S&F 2010 1 Crack 40mm S&F 2010 Corrosion S&F 2010 Corrosion S&F 2010 Corrosi
180, 90, 80 Cracks 20, 20mm S&F 2010 Corrosion S&F 2010 Corrosion 1 Crack 40mm 3 Cracks 30, 25mm S&F 2010 Corrosion
bar 3 Cracks 20, 20mm S&F 2010 6 Cracks 100, 80, 80, 50, 100, 80, 50, 20mm S&F 2010 Several cracks 30, 30, 30mm S&F 2010 Corrosion Corrosion Corrosion Corrosion Corrosion Corrosion on boom tip S&F 2010 O’Connor Severe corrosion on boom S&F 2010 O’Connor
client requirements
specifications including, ISO, SANS and FEM
structures/ identified components
220 m3 bin – fixed installation
GMEP – Semi Mobile ROM tip
Rotaside to unit train tippler designs and upgrades
Matching of wear patterns Material flow pattern and build-up Material spillage
Simulation for different Equipment orientations Simulate equipment movement Throughput assessment and blockage elimination