NEW MEANS & METHODS for BRIDGE OVERHANG CONSTRUCTION aka - - PowerPoint PPT Presentation

new means amp methods for bridge overhang construction
SMART_READER_LITE
LIVE PREVIEW

NEW MEANS & METHODS for BRIDGE OVERHANG CONSTRUCTION aka - - PowerPoint PPT Presentation

NEW MEANS & METHODS for BRIDGE OVERHANG CONSTRUCTION aka Stay-in-Place Precast Fascia Form October 2, 2018 1 2 Overview General Components Panel Types Panel Lengths Soffit Widths Reinforcement Hardware


slide-1
SLIDE 1

NEW MEANS & METHODS for BRIDGE OVERHANG CONSTRUCTION

aka Stay-in-Place Precast Fascia Form

October 2, 2018 1

slide-2
SLIDE 2

Overview

2

  • General Components
  • Panel Types
  • Panel Lengths
  • Soffit Widths
  • Reinforcement
  • Hardware

October 2, 2018

slide-3
SLIDE 3

General Components

October 2, 2018 3

Soffit Primary Tie Secondary Tie Lower Stud Inserts Upper Stud Inserts Notch Front Face

slide-4
SLIDE 4

Panel Types – Cross Sectio

February 16, 2017

slide-5
SLIDE 5

Panel Types – Cross Sections (con’t)

October 2, 2018 5

slide-6
SLIDE 6

Soffit Width Considerations:

  • 0” at wing walls or moment slabs.
  • Standard Widths < 2’-0”
  • > 2’-0”
  • Diagonal tie deck penetration
  • Strut introduction?
  • Top flange torsional analysis
  • 4’-0” max.
  • Varied

6 October 2, 2018

slide-7
SLIDE 7

Forms & Reinforcement

October 2, 2018 7

slide-8
SLIDE 8

Panel Length

− Standard Length = 5’-0” − NYSDOT Standards for control joint spacing. − Contract control joint spacing. −

  • Max. Length (suggested) = 8’-0”

− Considerations − Crack Control − Shrinkage − Curvature − Vectorially − Varied Radii − Camber

October 2, 2018 8

slide-9
SLIDE 9

Hardware Variations

Stiff Strut-Tie Flexible Strut-Tie

October 2, 2018 9

slide-10
SLIDE 10

Tie Connection Detail - Embeds

  • Note: Lubricate Thread at end of tie rod

and install plastic sleeve around rod in deck pour for tie rod removal above sleeve nut.

October 2, 2018 10

slide-11
SLIDE 11

Frontage Road Structure (FRS) – Span 9

October 2, 2018 11

slide-12
SLIDE 12

October 2, 2018 12

slide-13
SLIDE 13

October 2, 2018 13

slide-14
SLIDE 14

Panel Shake- Out

14

slide-15
SLIDE 15

October 2, 2018 15

slide-16
SLIDE 16

October 2, 2018 16

slide-17
SLIDE 17

October 2, 2018 17

slide-18
SLIDE 18

October 2, 2018 18

slide-19
SLIDE 19

Bridge L29

October 2, 2018 19

slide-20
SLIDE 20

Erection

20

  • Layout
  • Landing
  • Connecting
  • Adjusting
  • Joint Treatment
  • Studs
  • Tie Removal

October 2, 2018

slide-21
SLIDE 21

October 2, 2018 21

slide-22
SLIDE 22

Alternate Secondary Tie

October 2, 2018 22

slide-23
SLIDE 23

October 2, 2018 23

slide-24
SLIDE 24

Deck Reinforcement

February 16, 2017 24

slide-25
SLIDE 25

October 2, 2018 25

slide-26
SLIDE 26

February 16, 2017 26

slide-27
SLIDE 27

October 2, 2018 27

slide-28
SLIDE 28

October 2, 2018 28

slide-29
SLIDE 29

29

October 2, 2018

SLIP FORM

slide-30
SLIDE 30

October 2, 2018 30

slide-31
SLIDE 31

Stay-in-Place Precast Fascia Form

February 16, 2017 31