Nen enskra kra dam am in Georgia rgia Febru ruary ry 2016 - - PowerPoint PPT Presentation

nen enskra kra dam am
SMART_READER_LITE
LIVE PREVIEW

Nen enskra kra dam am in Georgia rgia Febru ruary ry 2016 - - PowerPoint PPT Presentation

Nen enskra kra dam am in Georgia rgia Febru ruary ry 2016 www. w.bankw kwatc tch.or org Basic facts ts Name: Nenskra HPP Location ation: : Georgia gia Capacity ity: : 280 280 MW Type: storage ge dam Projec


slide-1
SLIDE 1

Nen enskra kra dam am in Georgia rgia

Febru ruary ry 2016

www. w.bankw kwatc tch.or

  • rg
slide-2
SLIDE 2

www. w.bankw kwatc tch.or

  • rg

Basic facts ts

  • Name: Nenskra HPP
  • Location

ation: : Georgia gia

  • Capacity

ity: : 280 280 MW

  • Type: storage

ge dam

  • Projec

ect promote ter: : Korea a Water r Resourc rces es Corpor

  • ration

ation; Georgia gian state JSC Partners rship ip Fund

  • Biodiv

divers ersity ity impac acts: territory tory of the planned d Upper Svanet eti Nation

  • nal

al Park

  • Socia

ial l impacts ts: : effects ts on Svan indigen igenou

  • us communitie

ities

slide-3
SLIDE 3

Affected ected Sva van population ulation

  • 400 Svan househo

ehold lds

  • 2 communitie

ities

  • Svan

ans - indigen igenou

  • us people

les with

  • wn langu

guag age, laws ws, custom

  • mary

ary use of lands ds and tradit ition ions

  • Dependency on communal

al lands for subsis iste tence e agric icultu lture re, , grazin ing, g, timber

  • Low incom
  • me

e popula lation ion

  • Intern

rnally ally displac aced people from Abkhaz azia ia live e in the affec ecte ted villag lages

www. w.bankw kwatc tch.or

  • rg
slide-4
SLIDE 4

Nensk skra ra dam socia cial l impacts acts

Nenskra ra will l cause: e:

  • Physic

ical al resettlem lement ent of families ilies in the power r house e area

  • Floodin
  • ding

g of communal al land d (pastu ture res and forests ts)

  • Impact

t econ

  • nom
  • mic

ic liveho ehood

  • ds
  • Affect

t vuln lnerable able people (inte tern rnally lly displac aced d people le, , women) Projec ect ESIA fails ls to:

  • identif

ify the affecte ted population lation

  • assess socio

io-econ

  • nom
  • mic

ic impacts ts

  • propose mitiga

gation tion

www. w.bankw kwatc tch.or

  • rg
slide-5
SLIDE 5

Consu nsultati tation

  • ns

s with h affect ected ed comm mmunit unities ies - flawed ed

  • June 2015 - Public

ic consultat ltation ions meetings gs – no timely ly notic ice, , ESIA available ilable in 1 communit ity only ly, no risks presente ted at public ic hearin rings gs

  • May – German external review deems the ESIA as „in need of

substantial revision“

  • September

r - pre re-con

  • nstru

truction tion works commenced

  • Octobe

ber r – environ ironmenta ental l and constru truction ion permits ts issued ed, no signif ific ican ant t chan anges ges to ESIA made

  • Sprin

ing g 2016

– construct uction works ks start – Stakeho holder Engagement Plan missing – Environm nmental al and Social al Management nt Plan n lacki king – It is alread ady late for meaning ngful ul cons nsultations ns with h the affected people

www. w.bankw kwatc tch.or

  • rg
slide-6
SLIDE 6

Natural hazards ds – inadequat quate assessm sment ent

  • Nenskra

ra HPP may increas rease e the geo risks:

– Multi tiple existi ting g mudflow

  • ws and

lands dslide des s in the project t area – Debris covering the Nakr kra villag age – Dam faciliti ties s to increase ase the flood

  • ding

g risks ks

  • Nenskra

ra ESIA fails ils to:

– Identi tify y exi xisti ting g mudflows

  • ws effects

ts – Assess mudflow

  • w and landslide

de risks ks – Propose adequate te mitiga gati tion

  • n

measures www. w.bankw kwatc tch.or

  • rg
slide-7
SLIDE 7
  • Nenskra

ra is located ated in Upper Svan anetia tia region

  • n
  • 35 H

HPPs planned ed in the area a size of Mallo lorc rca islan and

  • Cumula

lative ive impac acts on the Engu guri river basin ecosyste tems

  • Insid

ide e the planned ed Upper Svan aneti ti Nation

  • nal

al Park >h >hydro ro develop

  • pment

t clash with conservation rvation effor

  • rts

ts

www. w.bankw kwatc tch.or

  • rg

Multiple tiple hydro ro combined mbined impact act

slide-8
SLIDE 8

Plann nned ed hydropo dropowe wer plants ts Upper er Sva vaneti netia, a, Georgia

  • rgia

www. w.bankw kwatc tch.or

  • rg
slide-9
SLIDE 9

For r more re information:

  • rmation:

David Chipashvili Green Alternative/CEE Bankwatch Network Georgian Campaigner dchipashvili@greenalt.org

www. w.bankw kwatc tch.or

  • rg
  • Briefing on the Nenskra HPP
  • Comments on the Nenskra ESIA
  • Preliminary comments on the Nenskra hydropower plant Environmental and Social

Impact Assessment consultation process

  • Photo story: Above the clouds, below the dam
  • Map of planned hydropower plants in Upper Svanetia
  • Review of Nenskra HEP ESIA study