Nen enskra kra dam am in Georgia rgia
Febru ruary ry 2016
www. w.bankw kwatc tch.or
- rg
Nen enskra kra dam am in Georgia rgia Febru ruary ry 2016 - - PowerPoint PPT Presentation
Nen enskra kra dam am in Georgia rgia Febru ruary ry 2016 www. w.bankw kwatc tch.or org Basic facts ts Name: Nenskra HPP Location ation: : Georgia gia Capacity ity: : 280 280 MW Type: storage ge dam Projec
www. w.bankw kwatc tch.or
www. w.bankw kwatc tch.or
ation: : Georgia gia
ity: : 280 280 MW
ge dam
ect promote ter: : Korea a Water r Resourc rces es Corpor
ation; Georgia gian state JSC Partners rship ip Fund
divers ersity ity impac acts: territory tory of the planned d Upper Svanet eti Nation
al Park
ial l impacts ts: : effects ts on Svan indigen igenou
ities
ehold lds
ities
ans - indigen igenou
les with
guag age, laws ws, custom
ary use of lands ds and tradit ition ions
al lands for subsis iste tence e agric icultu lture re, , grazin ing, g, timber
e popula lation ion
rnally ally displac aced people from Abkhaz azia ia live e in the affec ecte ted villag lages
www. w.bankw kwatc tch.or
Nenskra ra will l cause: e:
ical al resettlem lement ent of families ilies in the power r house e area
g of communal al land d (pastu ture res and forests ts)
t econ
ic liveho ehood
t vuln lnerable able people (inte tern rnally lly displac aced d people le, , women) Projec ect ESIA fails ls to:
ify the affecte ted population lation
io-econ
ic impacts ts
gation tion
www. w.bankw kwatc tch.or
ic consultat ltation ions meetings gs – no timely ly notic ice, , ESIA available ilable in 1 communit ity only ly, no risks presente ted at public ic hearin rings gs
substantial revision“
r - pre re-con
truction tion works commenced
ber r – environ ironmenta ental l and constru truction ion permits ts issued ed, no signif ific ican ant t chan anges ges to ESIA made
ing g 2016
– construct uction works ks start – Stakeho holder Engagement Plan missing – Environm nmental al and Social al Management nt Plan n lacki king – It is alread ady late for meaning ngful ul cons nsultations ns with h the affected people
www. w.bankw kwatc tch.or
ra HPP may increas rease e the geo risks:
– Multi tiple existi ting g mudflow
lands dslide des s in the project t area – Debris covering the Nakr kra villag age – Dam faciliti ties s to increase ase the flood
g risks ks
ra ESIA fails ils to:
– Identi tify y exi xisti ting g mudflows
ts – Assess mudflow
de risks ks – Propose adequate te mitiga gati tion
measures www. w.bankw kwatc tch.or
ra is located ated in Upper Svan anetia tia region
HPPs planned ed in the area a size of Mallo lorc rca islan and
lative ive impac acts on the Engu guri river basin ecosyste tems
ide e the planned ed Upper Svan aneti ti Nation
al Park >h >hydro ro develop
t clash with conservation rvation effor
ts
www. w.bankw kwatc tch.or
www. w.bankw kwatc tch.or
David Chipashvili Green Alternative/CEE Bankwatch Network Georgian Campaigner dchipashvili@greenalt.org
www. w.bankw kwatc tch.or
Impact Assessment consultation process