NEIGHBORHOOD STORAGE PROJECT Hibbard Park & Community Rec Center Underground Storage PRESENTATION OUTLINE 1. Summary of Hibbard Park Flood Storage 2. Community Rec Center Future Facility Assessment 3. Underground Storage Configuration 4.
PRESENTATION OUTLINE
- 1. Summary of Hibbard Park Flood Storage
- 2. Community Rec Center Future Facility Assessment
- 3. Underground Storage Configuration
- 4. Next Steps
HIBBARD PARK FLOOD STORAGE
Underground Flood Storage = 10 acre-ft
HIBBARD PARK SITE PLAN
HIBBARD PARK PROGRAM ANALYSIS
HIBBARD PARK PROGRAM DIAGRAM
CONCEPT FACILITY
ONE FLOOR
EXISTING FACILITY
CONCEPT FACILITY REVISED
SCHEME A – TWO FLOORS
CONCEPT FACILITY REVISED
SCHEME B – TWO FLOORS
CONCEPT FACILITY REVISED
SCHEME C – TWO FLOORS
UNDERGROUND STORAGE CONFIGURATION
- Underground Storage
- Volume = 10 acre-ft
- Height of system = 5’8”
- Average depth of cover ≈2 ft
- No pump station required
- Tree Survey
- Completed March 2019
- Approximately 40 trees within
footprint
- Opportunities for
replacement on perimeter
- Existing Amenities Replaced
- Skate park, parking, open
space
- Site drainage improvements
- Geotechnical Analysis
- Silty Clay/Lean Clay Soils
- Groundwater varies
NEXT STEPS
- Continue discussions with Park District
- Site meeting on April 24, 2019
- 30% design development of underground storage