MORVERN COMMUNITY HYDRO SCHEMES Project Introduction March 2017 HYDRO BASICS The Elements It all depends on the head Head (H) H Units - Head 1m = 3.2808 ft = 0.981 bar ( 10m 1bar ) 1m = 0.5468 fathoms = 0.0497 chains The


slide-1
SLIDE 1

MORVERN COMMUNITY HYDRO SCHEMES Project Introduction

March 2017

slide-2
SLIDE 2

HYDRO BASICS

slide-3
SLIDE 3

The Elements

“It all depends on the head”

Head (H) H

slide-4
SLIDE 4

Units - Head

1m = 3.2808 ft = 0.981 bar ( 10m  1bar ) 1m = 0.5468 fathoms = 0.0497 chains

slide-5
SLIDE 5

The Elements

Head (H) Flow rate (Q) Q H

slide-6
SLIDE 6

Units - Flow

1m3/s = 1 cubic metre of water travelling at 1m/s = 1 CUMEC = 35.315 CUSECS (ft3/s) = 1000 litres/s = 86.40 MLD = 19.03 MGD = 13215 Gallons/min

slide-7
SLIDE 7

Units - Power

1 milliWatt mW = 1/1000 of a Watt 1 Watt W 1 kiloWatt kW = 1 thousand Watts 1 MegaWatt MW = 1 million Watts = enough for 1000 - 1500 homes.

slide-8
SLIDE 8

Power Equation

  • Quick Method & Head Comparison

QUICK WAY….

 Ne = k.H.Q

where k = 7.0 Consider, for Medium Head :

Head = 100m Flow = 1m³/s

Ne = 7.100.1 = 700 kW

for Low Head :

Head - 10m Flow = 10m³/s

Ne = 7.10.10 = 700 kW

slide-9
SLIDE 9

Ardtornish Estate Company Ltd

slide-10
SLIDE 10

Ardtornish Estate Company Ltd

Schemes Constructed: Tearnait Rannoch Uileann Achranich Socaich

slide-11
SLIDE 11

Ardtornish Estate Company Ltd

Tearnait

slide-12
SLIDE 12

Ardtornish Estate Company Ltd

Rannoch

slide-13
SLIDE 13

Ardtornish Estate Company Ltd

Uileann

slide-14
SLIDE 14

Ardtornish Estate Company Ltd

Achranich

slide-15
SLIDE 15

Ardtornish Estate Company Ltd

Socaich

(under construction)

slide-16
SLIDE 16

The Schemes

Achadh Forsa

  • Upper
  • Lower

Barr River

slide-17
SLIDE 17

Scheme Layout – Achadh Forsa (Upper)

slide-18
SLIDE 18

Scheme Layout – Achadh Forsa (Lower)

slide-19
SLIDE 19

Scheme Layout – Achadh Forsa (Both)

slide-20
SLIDE 20

Scheme Layout – Barr River

slide-21
SLIDE 21

Scheme Layout – Barr River

slide-22
SLIDE 22

Planning

a. Archaeology

  • b. Birds

c. Bryophytes

  • d. Fisheries

e. Habitat f. Landscape

  • g. Hydrology
  • h. Mammals

i. Noise

slide-23
SLIDE 23

Grid Connection

slide-24
SLIDE 24

Upper Achadh Forsa Powerhouse

slide-25
SLIDE 25

Upper Achadh Forsa Powerhouse

slide-26
SLIDE 26

Upper Achadh Forsa Powerhouse

slide-27
SLIDE 27

Upper Achadh Forsa Intake

slide-28
SLIDE 28

Lower Achadh Forsa Powerhouse

slide-29
SLIDE 29

Lower Achadh Forsa Powerhouse

slide-30
SLIDE 30

Lower Achadh Forsa Powerhouse

slide-31
SLIDE 31

Lower Achadh Forsa Intake

slide-32
SLIDE 32

Barr River Powerhouse

slide-33
SLIDE 33

Barr River Powerhouse

slide-34
SLIDE 34

Barr River Powerhouse

slide-35
SLIDE 35

Barr River Intake 2-1

slide-36
SLIDE 36

Barr River Intake 2-2

slide-37
SLIDE 37

Barr River Intake 2-3

slide-38
SLIDE 38

Barr River – Typical Minor Intake

slide-39
SLIDE 39

What will it look like?

Upper Achadh Forsa Powerhouse

slide-40
SLIDE 40

What will it look like?

Upper Achadh Forsa Powerhouse

(Lower Achadh Forsa intake just visible at left of image)

slide-41
SLIDE 41

What will it look like?

Lower Achadh Forsa Powerhouse

slide-42
SLIDE 42

What will it look like?

Lower Achadh Forsa Powerhouse

slide-43
SLIDE 43

What will it look like?

Barr River Powerhouse

slide-44
SLIDE 44

What will it look like?

Barr River Powerhouse

slide-45
SLIDE 45

What will it look like?

Barr River Intake 2-1

slide-46
SLIDE 46

What will it look like?

Barr River Intake 2-1

slide-47
SLIDE 47

For more information, please do not hesitate to get in touch with us: Telephone: 01202 886622 info@hydroplan.co.uk