monthly public programs
play

Monthly public programs Programs to community groups Annual - PowerPoint PPT Presentation

Founded 2002 in Prescott Approximately 200 members Promotes a sustainable water future in the Upper Verde River Basin and the Prescott Active Management Area by educating the public, encouraging citizen action, and advocating


  1. • Founded 2002 in Prescott • Approximately 200 members • Promotes a sustainable water future in the Upper Verde River Basin and the Prescott Active Management Area by educating the public, encouraging citizen action, and advocating responsible governmental decision-making • Monthly public programs • Programs to community groups • Annual candidate forum • Attend and monitor public meetings

  2. PRESCOTT ACTIVE MANAGEMENT AREA

  3. PRESCOTT ACTIVE MANAGEMENT AREA (PrAMA) c. 2004 6 MILES

  4. WELL 15-01-23-BAD PrAMA MONITORED WELLS SHOWING WATER-LEVEL CHANGE, FT 1994-2010 WATER-LEVEL CHANGE IN MONITORED WELLS 1939 TO PRESENT MOSTLY −50 OR MORE FEET

  5. WATER LEVEL DEPTH, ELEVATION, FT FT 4,612 270 280 4,602 4,592 290 4,582 300 4,572 310 4,562 320 0 0 4,552 330 4,542 340 4,532 350 4,522 360 370 4,512 1980 1990 1960 1970 2000 2010

  6. PrAMA OVERDRAFT 1985-THROUGH 2012 AND 2019 20,000 CUMULATIVE CUMULATIVE OVERDRAFT, ACRE-FEET ANNUAL OVERDRAFT, ACRE-FEET OVERDRAFT (MOSTLY 1995 10,000 THROUGH 2012): 252,625 ACRE-FEET; 0 4.9 – 8.4% OF -25,000 AQUIFER STORAGE -10,000 -125,000 THROUGH 2017 (ESTIMATED): -225,000 CUMULATIVE OVERDRAFT 2012 = -20,000 331,663 ACRE-FEET APPROX 252,625 ACRE-FEET 6.4 – 11.1% OF -325,000 2000 1985 1990 1995 2005 2010 AQUIFER STORAGE YET MANY THOUSANDS YEAR OF NEW HOMES ARE “ON THE BOOKS”

  7. UPPER VERDE RIVER

  8. VERDE RIVER BASIN Paulden VERDE RIVER: • ONE OF ARIZONA’S FEW REMAINING PERENNIAL RIVERS Camp Verde Streamgage USGS Streamga gage ge • FLOWS ESSENTIALLY FREELY FROM ITS HEADWATER SPRINGS FOR APPROXIMATELY 137 MILES TO HORSESHOE RESERVOIR • THEN ANOTHER 51 MILES TO ITS CONFLUENCE WITH THE SALT RIVER NEAR FOUNTAIN HILLS

  9. BIG CHINO VALLEY LITTLE SATURATED THICKNESS OF CHINO SUB-BASIN YOUNG SEDIMENTS AND VERDE VOLCANIC ROCKS VALLEY VERDE PAULDEN VALLEY STREAMGAGE

  10. BIG CHINO VALLEY AND LITTLE CHINO SUB-BASIN WATER-LEVEL CONTOURS, FT. GROUNDWATER FLOW DIRECTION

  11. BIG CHINO VALLEY 4 THREATS TO THE UPPE VERDE RIVER • BIG CHINO WATER RANCH 8,000 AF/Y = 11 cfs • BIG CHINO VALLEY PUMPED STORAGE PROJECT INITIAL FILL 27,000 AF/Y = 15 CFS ANNUAL 1,200 AF/Y = 1.7 CFS • POTENTIAL HOMES @ 4 HOMES/AF 75,OOO HOMES 18,750 AF/Y = 26 CFS • NEW “BIG” AG ____? • VS ANNUAL ”LOW FLOW” AT PAULDEN GAGE 13,000 AF/Y = 18 CS 2010 THRU 2017; 11,000 AF/Y = 15 CFS IN 2018

  12. POTENTIAL MITIGATING STRATEGIES • Drought-tolerant landscaping; • Residential, commercial-area, and public-land rainwater harvesting for landscape irrigation, non-potable indoor use, groundwater recharge; • Minimizing groundwater exploitation by land-use management; • Purchase of development rights (conservation easements) on yet- undeveloped tracts; • Storm-water management that supports aquifer recharge; • Regulation of groundwater pumping; • Formation of a Big Chino water-management district with authority to manage groundwater in the Big Chino Valley so as to protect domestic wells and the base flow of the Verde River

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend