MMRP – PRESENTATIO N TO IA C
RESIDENTS O F: 35 O ’SHA N ASSY STREET, N ORTH MELBO URNE
MM R P P R E S EN T A T I O N T O I A C R E S I DEN T S O F : 35 O - - PowerPoint PPT Presentation
MM R P P R E S EN T A T I O N T O I A C R E S I DEN T S O F : 35 O S HA N A SS Y S T R EE T , N O R T H ME L BO U R NE A SS UMED L O C A T I O N C HA R A C T E R I S T I C S S ou r c e: EE S -C h a pte r 13- No i s e & V i b r a t i on
RESIDENTS O F: 35 O ’SHA N ASSY STREET, N ORTH MELBO URNE
Sourc e: EES-C h a pter 13- Noise & Vibra tion (p a g e 13 -1)
Th e w orst effe cte d house in Ard e n pre cin ct
tra ms or trains noise a nd vibra tion
m ajor c onstru ction sites in close proximity
fre esta nding d w ellings, with living are as on ground or b elo w ground le v el (ofte n Herita g e liste d) – THE M OST VULNERABLE Pote ntially th e w orst affe cte d are a on th e e ntire M MRP route
DIVERSE C HARA CTERISTICS O F DIFFERENT PRECIN CTS ALO N G THE RO UTE MUST BE C O NSIDERED A ND MUST BE IN C ORPORATED IN TO DESIG N C O NSTRAINTS A ND SOLUTIO NS
TUNNEL DEPTH:
C O MMUNITY CENTRE, N ORTH MELBOURNE)
MMRA 28/Ja n/2016, Ref: D O C /16/4851
– Se ction dra wing – Ard e n tunn el pre cin ct Western Distributors information info booth. Good example of community consultation. Located in front of library for 7 consecutive days.
TUNNEL ROUTE: Curzon, O’Shanassy & Courney Streets
Errol Street, O’Shanassy Street & Curzon Street
Th e sh allo w est tunn el un d er th e m ost vuln era ble resid e ntial are a Th e high est non c o m plia n c e along th e sh allo w est p art of th e tunn el
qu ality outc o m es through d esign N OT through mitig a tion, retrofit or re nov a tion” – City O f
M elb ourn e EES Sub mission
involving:
(noise a nd vibra tion)
im p a ct during c onstru ction tim e a nd ong oing issu es with o p era tion al noise a nd vibra tion
Source: EES: Technical Appendix: E - Figure E 26
tunn el c a n’t b e lo w ere d a nd th a t high er mitig a tion te c hniqu e d o esn’t exist (Ard e n pre cin ct re quires “v ery high a tte nu a tion” to a c hie v e minimum re quire m e nts)?
m ainte n a n c e noise a nd vibra tion? (M MRA h a v e v este d interest in th e proje ct a nd is not c onsid ere d “ind e p e nd e nt”, M MRP is a PPP proje ct – c ould th e m onitoring e nd up in th e h a nds of a priv a te c orp ora tion a nd ho w w ould th e c orp ora tion prote ct th e interest of resid e nts vs profit?)
exc e e d e d le v els of o p era tion al vibra tion a nd noise, a nd ho w w ould th e affe cte d resid e nt b e c o m p e nsa te d (whic h A ct c ov ers th ese situ a tions?)
Approx. 12-13 m Houses with below ground living or working areas TUNNEL DEPTH INFORMATION AS PROVIDED BY MMRA:
C O MMUNITY CENTRE, N ORTH MELBOURNE)
D O C /16/4851
Ard e n tunn el pre cin ct
noise a nd vibra tion not c ondu cte d along ‘Tunn el pre cinct”
rela te d to M MRP route a nd not “ e quiv ale nt” to tunn el pre cinct lo c a tion
p ara m eters might im p a ct/influ e n c e pre dicte d noise a nd vibra tion le v els
noises a nd vibra tion le v els in existing houses a b ov e th e tunn el pre cin ct is not re quire d. C o m munity disa gre e.
EES_Chapter 13- Baseline Vibration Measurement EES_Chapter 13- Baseline Noise Measurement
c alc ula tions of pre dicte d vibra tion d ose v alu e on th a t criteria.
train fre qu e n cy in e a c h tunn el will b e 1-3 min.
th a t would allo w for mu c h high er vibra tion v alu es, a nd would h a v e a mu c h m ore signific a nt im p a ct on affe ct resid e nts living a b ov e tunn el
a c c ord a n c e to EES’s Sum m ary se ction d escription of servic es as: “…continuous trains elimin a ting th e n e e d for tim eta bling.”
INTERMITTENT: c o ming a nd g oing at interv als : not c ontinuous. Starting,
sto p ping, a nd starting a g ain : not c onsta nt or ste a dy.
Sourc e: M erria m-W e bster
Diction ary C O NTINUO US Vibra tion c ontinu es uninterrupte d for a d efin e d p erio d of tim e (usu ally throughout d a ytim e a nd / or night-tim e).
Sourc e: BS 6472–1992
0.5-1.5 Min
Level of continuous noise?
Sourc e: MMRA – Briefing to North M elb ourn e resid e nts, July 2016
Pre dicte d c ontinuous o p era tion al ground b orn e noise le v el: Pre dicte d c ontinuous o p era tion al ground b orn e vibra tion le v el: Wh a t is th e physic al interpreta tion
ground b orn e noise le v el a nd ho w it c o m p ares with existing noise le v els?
Sourc e: MMRA – Briefing to North M elb ourn e resid e nts, July 2016
Wh a t is th e physic al interpreta tion
ground b orn e vibra tion le v el a nd ho w it c o m p ares with existing vibra tion le v els?
a c c ess, o p era tion al c onstraints, im p a ct on busin esses a nd institutions, proje ct c ost & d eliv ery tim e
th e “Tunn el Pre cin ct” Resulting in:
m ost vuln era ble resid e ntial are as, rela ying on a v ery high a tte nu a tion to b arely m e et minimum noise a nd vibra tion re quire m e nts prescrib e d by th e rele v a nt guid elin es.
living a b ov e th e “Tunn el pre cin ct”. Typic ally, m ajority of im p a ct a n alysis in EES fo c us on sta tion pre cin cts.
existing flora a nd fa un a a b ov e “Tunn el Pre cin ct” a nd p ote ntial M MRP’s im p a ct on th e m.
h a v e a n im p a ct on v ery old, esta blish e d Pla ta nus tre es with a substa ntial ro ot syste m a nd in-ground fa un a (ground b orn e noise).
und ersta nding of sp e cific lo c a tion c h ara cteristics. (city vs inn er city n eighb ourho o d c h ara cteristics).
Ard e n a nd A b b otsford stre et with a total d e pth (in cluding footings) of 10-12m b elo w n a tural ground le v el. Th e tunn el runs und er th e site.
und erground living sp a c es. It se e ms th a t EES d o esn’t in clud e d etaile d surv ey th a t w ould allo w re alisa tion th a t th e tunn el d e pth und er so m e houses will b e only a b out 7m -8m.
m e asure m e nt not c ondu cte d along th e “Tunn el Pre cin ct”.
pro p osal to exclud e tunn els fro m d e v elo p m e nt pla n th a t is subje ct to Pla nning A p prov al (City of M elb ourn e EES draft sub mission; Se ction 13.2.1 A p prov al of D e v elo p m e nt Pla ns (p a g e 104)): "Although th e In c orp ora te d Do c um e nt f a cilit ates th e use a nd d e v elo p m e nt of la nd for th e e ntire proje ct in cluding tunn els as w ell as st a tion, p ort als a nd asso cia te d infrastru cture, th e re quire m e nt to sub mit a d e v elo p m e nt pla n for a p prov al rela tes only to th e p arts of th e proje ct a b ov e a nd a t ground le v el a nd up to tickete d are as." "Th e pla nning a p prov al will b e th e prim ary st a tutory a p prov al for th e e ntire proje ct. As su c h, it is sub mitte d th a t it should re quire d e v elo p m e nt pla ns to b e sub mitte d for th e e ntire proje ct."
traffic closure, c ong estions a nd relo c a tions, are also not a d dresse d by EES.
displa c e m e nt: CBD South Sta tion - ”Th e EES d o es not sa tisfa ctorily a d dress th e so cial im p a cts of th e proje ct on all se ctions of th e c o m munity a nd th e displa c e m e nt of vuln era ble c o m munities."