mike dillon and ilham
play

Mike Dillon and Ilham IMPROVING PRODUCTIVITY AND COMPETITIVENESS - PowerPoint PPT Presentation

Mike Dillon and Ilham IMPROVING PRODUCTIVITY AND COMPETITIVENESS SEKOLAH TINGGI PERIKANAN creating young samurai ! q Established in 1962 q Based in Jakarta q Vocational HE, managed by KKP q 4-year Diploma q Offers Fishing Technology, Fisheries


  1. Mike Dillon and Ilham IMPROVING PRODUCTIVITY AND COMPETITIVENESS

  2. SEKOLAH TINGGI PERIKANAN creating young samurai ! q Established in 1962 q Based in Jakarta q Vocational HE, managed by KKP q 4-year Diploma q Offers Fishing Technology, Fisheries Engineering, Fish Processing Technology, Aquaculture, Aquatic Resource Management, and Fisheries Extension q 10,000 graduates q 10000 Samurai if we use them !!

  3. Indonesia challenges ? … COVID Low productivity Poor innovation little Work with industry

  4. The relative value from continuous improvement and innovation as versus occasional improvement and doing the same as usual

  5. STP Internship – under SMART-Fish support N W E PREPARATION S DESIGN PLACEMENT DATA COLLECTION REPORT

  6. Naufal Fakhri – OEE q PT Panca Mitra Multi Perdana, Situbondo, East Java q OEE (Overall Equipment Effectiveness) analysis to improve the effectiveness of the performance of vanammei shrimp freezing machine

  7. OEE 100% 90% Hasil 80% 70% Standar 60% 50% 40% 30% 20% 10% 0% Nilai Nilai Nilai Quality OEE Availability Performance Hasil 96% 65,84% 99% 62,87% Standar 90% 95% 99% 85%

  8. Six Big Losses 35,00% 30,00% 25,00% 20,00% 15,00% 10,00% 5,00% 0,00% Hasil Persentase Idle and Minor Stoppage Loss 33,02% Reduce Speed Loss 30,87% Setuo and Adjusment Loss 7,05% Equipment Failure Loss 2,11% Deffet Loss 0,62% Reduce Speed Loss 0,43%

  9. Potential loss from electricity usage Diketahui: Kerugian waktu : 3 jam Kwh : 100 Biaya listrik : 1.467,28 Ditanyakan : Kerugian dalam jangka panjang? Jawab: 1 hari = 3,4 x 100 x 1467,28 = Rp 440.184 1 minggu = 6 hari kerja x Rp 440.184 = Rp 2.641.104 1 bulan = 25 hari kerja x Rp 440.184 = Rp 11.004.600 1 tahun = 300 hari kerja x Rp 440.184 = Rp. 132.055.200

  10. Rekha Riani Samura – Kaizen q PT Expravet Nasuba, Medan, North Sumatera q Improvement of transportation technique of harvested Pangasius

  11. g n s t i e a r v H g i n a d o L

  12. ROOT CAUSE ANALYSIS WITH THE “5 WHY’s” 1. Why did the yield/product quality is low? – Fish quality is poor! 2. Why is the fish quality poor? – Has too many fish died! 3. Why too many fish died? – A shortage of oxygen during transport 4. Why shortage of oxygen occurs? – The water tank is not aerated! 5. Why is the water tank is not Root cause of aerated? – No blower, never the problem proposed to the management office

  13. 1 Yield 2 Broken products 3 Three circle loops static $$$

  14. Project Title Reducing the dead fish % being processed through the factory Project Information Leader : Charles – Farm Manager Team Members 1. Joni – Processing Section Head 2. Josef Tobing – Animal Health & QC Supervisor 3. Rekha Riani Samura – intern student Project Start Date February/March 2018 Project Completion Date May 2018 Cost Impact of Failure >42% mortality without blower Project Goals Reducing the % of dead fish arriving in the factory from 42% to 10% Measurement of success Percentage of fish deaths decreased Process problem steps Importance in relation Process Measurement to Project Less of oxygen; installing air High 1. Measurement DO in fish blower in fish container container 2. Water circulation Harvest time High Measure harvest time Unloading time High Measure unloading time Project Milestone Measure DO Measure harvest Water circulation inside container with and unloading and cause analysis and without blower time with Kaizen team Date Every harvesting Every harvesting Every container

  15. Process steps and importance in relation to project High High Receiving area High Transport High Blower installation High Harvesting Harvest Prep

  16. Without intervention SMALL intervention

  17. Improvement 80 70 60 50 Percentage 40 30 20 10 0 Dead Live Dead Live August November

  18. Impact on economic performance (ie. Filleting yield) 0.65% Gain 50,000kg x 260 6.5 gr/kg 676 juta/tahun = USD 48,285/year Rp 13,000,000/ g k / 0 6 2 p R wk

  19. Harvesting and Blower Installation

  20. Receiving Area

  21. Fish mortality level - 2018 45 Target 40 10% 35 30 25 March 20 15 April 10 5 0 Genset Battery Without blower

  22. BUSSINESS VS ACADEMIA- getting samurai trained ACADEMIA BUSSINESS

  23. Higher Education Institution and Industry should collaborate

  24. • Improving productivity and competitiveness needs smart thinking • We need young samurai to set up better systems • Institute of Productivity work with IPRIDE4FISH to help make this happen • Lets Help Indonesia Compete by using best ASSET# • Her People !!

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend