MET COAL SAFETY OVERVIEW SUMMARY
The Met Coal business recorded:
to June consequence dates).
fracture, Emp-back strain).
The Met Coal SLT VFL completion rate was slightly above target at 109% for June (YTD 101%). Met Coal recorded 20 critical control deficiencies in June (4xOpen Cut; 16xUnderground, 12 reported as affecting the integrity of the controls due to monitoring not completed at Grosvenor following gas and spon com events. No risk to personnel as no access to underground). Met Coal has 17 outstanding tasks based on ‘real due date’ for June:
5 overdue investigations:
TARP Status:
Level 1; Dawson moved from Level 2 to Level 1
injury event and subsequent spon com event this month. 2020 Met Coal Targets approved June 2020 = 10% reduction target against 2019 results. Group wide incentivised targets will be TRCFR 15% reduction based on 3 year average results = 7.77%. COVID-19 tracking: In last 7 days, Queensland Health has reported:
Met Coal CMW’s testing continues to increase, vulnerable persons absent remains stable, slight increase in those absent due to flu like symptoms, and slight decrease in those self-
AAMC.001.031.0045
CONFIDENTIAL
3 INTERNAL
ACTUALS V TARGETS
2020 Met Coal Targets approved June 2020 = 10% reduction target against 2019 results. Group wide incentivised targets will be TRCFR 15% reduction based on 3 year average results = 7.77%. Note: Exploration-Aus counts=incidents assigned to Met Coal Exploration-Aus entity in Enablon. Exploration incidents assigned to a site will be managed externally to reflect total exploration incidents. HPH Expectations:AAMC.001.031.0046
CONFIDENTIAL
4 INTERNAL
OPERATIONAL RISK MANAGEMENT
Controls CC Actively monitored as per requirements Mine Site # Controls Monitored this month # Deficient controls - Affected Controls (all in) # Overdue Controls Deficiencies without Actions
Capcoal Open Cut
54 37 0 (2) 5
Dawson
109 59 0 (2)
Capcoal Grasstree
138 60 0 (3)
Grosvenor
122 51 12 (13)
Moranbah North
237 48 0 (0)
Exploration - Aus
91 33 0 (0)
Met Coal
751 288 12 (20) 5 AAMC.001.031.0047
CONFIDENTIAL
5 INTERNAL
SAFETY INTERVENTION TARP
Site Previous Month TARP STATUS Current Month TARP STATUS Flagged Trigger Intervention Actions
Capcoal Grasstree Level 1 Normal State Capcoal Open Cut Level 1 Normal State Dawson Level 2 Level 1 1 TRC 1 HPI within 3 mths Aquila Project Level 1 Level 1 2 TRCs Moranbah Normal State Level 1 2 TRCs Exploration – Australia Normal State Normal State Grosvenor Level 3 Level 3 1 HPI within 3 mths LW remains under control of DNRME, mining has not resumed and investigation continues at this time. Extensive communications, risk assessments and planning for mine re-entry work have been implemented.
Critical Control factors
AAMC.001.031.0048
CONFIDENTIAL
6 INTERNAL
LAST DATE INFORMATION
Note: Number of Days has been calculated as at 01/07/2020 * Exploration counts include incidents assigned to ‘Met Coal Exploration – Australia’ entity.
Entity # of HPI’s YTD # Days since Last HPI Date of last HPI # of TRC’s YTD # Days since last TRC Date of last TRC # of LTI’s YTD # Days since last LTI Date of Last LTI
Capcoal Open Cut 223 21/11/2019 2 51 11/05/2020 278 27/09/2019 Dawson 2 73 19/04/2020 8 11 20/06/2020 6 36 26/05/2020 Grasstree 549 30/12/2018 6 44 18/05/2020 2 146 6/02/2020 Grosvenor 2 56 6/05/2020 11 56 6/05/2020 9 56 6/05/2020 Moranbah North 2 93 30/03/2020 5 22 8/06/2020 2 25 6/06/2020 Exploration Aus 422 6/05/2019 221 23/11/2019 221 23/11/2019 Aquila Project 6 19 13/06/2020 3 33 29/05/2020 Brisbane Misc- Projects 198 16/12/2019
AAMC.001.031.0049
CONFIDENTIAL
7 INTERNAL
HPI/HPH DETAILS FOR MONTH
Entity Event ID Event Date Consequence Date Event Summary HPI HPH
Capcoal Grasstree IN.00226737 09/06/2020 12/ 06/ 2020 E Stop engaged on #94 Shield to make slack in crossover hose easier to re-hang. Hi Set Pressure failed to dump, only system pressure dumped. HPH Capcoal Open Cut IN.00227285 17/06/2020 17/ 06/ 2020 During morning inspection the mining superintendent found a slot had been cut through the windrow ,there were no controls in place stop sign or red hats circuit was not running at the time however the drill was walking down the ramp EX 359 was relocated so there was interaction with heavy machines service truck was active on the circuit HPH Capcoal Open Cut IN.00227461 21/06/2020 21/ 06/ 2020 When completing weekly inspection on OD201 trades technician found air tank dump valve had been bent to allow removal of tank cap without opening dump valve to drain air tank . HPH Capcoal Open Cut IN.00228336 30/06/2020 01/ 07/ 2020 German Creek HME Bulk Oil Tank Access System not fit for purpose and could allow CMW to fall backwards or sideways while climbing down the ladder. HPH Dawson IN.00226121 03/06/2020 03/ 06/ 2020 Operator of Rd127 failed to identify LV 138 at intersection. HPH Dawson IN.00226275 08/06/2020 08/ 06/ 2020 Non-rated attachment for the HV cable to be support and ability for personnel to walk under the cable area. HPH Dawson IN.00226276 04/06/2020 08/ 06/ 2020 Light vehicle 138 found in dump park up area not chocked HPH Dawson IN.00226277 02/06/2020 02/ 06/ 2020 Operator of LV 4-5 was returning from pit 27 dump when he crossed through an intersection onto the wrong side of the haul road and traveled towards RD3985. HPH Dawson IN.00227958 26/06/2020 26/ 06/ 2020 There is not hard barrier preventing access under ROM bins along the ROM transfer conveyor access walkways (ie CV111, CV121 and CV151 walkways). HPH Dawson IN.00228127 25/06/2020 29/ 06/ 2020 After a circuit breaker failure at Dawson CHPP, the metal isolator mounting bracket and isolator actuator handle was measured at 240V. At no time should the mounting bracket and isolator actuator handle be live. HPH Dawson IN.00228150 29/06/2020 29/ 06/ 2020 Lanyard wire and runner have not been inspected periodically for structural integrity and compliance as per the Australian Standard requirements HPH Grosvenor IN.00227727 20/06/2020 24/ 06/ 2020 Near miss of Heavy Vehicle (Truck) and Light Vehicle. Light vehicle failed to give way at intersection which was Giveway signed posted. Fully loaded heavy vehicle had to come to a complete stop to avoid interacting with light vehicle. HPH Grosvenor IN.00227739 19/05/2020 24/ 06/ 2020 While CMW was conducting leak detection (soapy water) inspection on diesel exhaust system, the connection joint from exhaust pipe to exhaust conditioner failed the inspection. Further inspection found 2 x bolt sheared and 1 x bolt missing of the four M12 socket head cap screw bolts and evidence of impact damage to exhaust conditioner (scrubber tank) PJB Minecruiser tagged out of service and investigation commenced HPH
AAMC.001.031.0050
CONFIDENTIAL
8 INTERNAL
HPI/HPH DETAILS FOR MONTH (CONT)
Entity Event ID Event Date Consequence Date Event Summary HPI HPH
Moranbah North IN.00225650 29/05/2020 01/ 06/ 2020 During development at MG113 belt chamber, several reports of cowling, belting/guttering at roof/rib interface, shears, joints, audable roof bumping and increased tell-tale movement were made and continued after development. Additional roof support was installed to stop the roof deformation. HPH Moranbah North IN.00226016 02/06/2020 04/ 06/ 2020 Cutting TG - MG in a cavity, CMW was on roof support 42, no PM32 alarm/warning, shield then started to lower. ERZC at RS 41 then hit E stop, shearer at RS 44, CMW manually advancing RS45. HPH Moranbah North IN.00226380 31/05/2020 09/ 06/ 2020 Repowered SB010 outlets to LW and Dev without notifying CRO or ERZ Controller HPH Moranbah North IN.00226732 31/05/2020 12/ 06/ 2020 On packing DR23 on go line saw wash cap on gas sensor has been left on from SAT N/S HPH Moranbah North IN.00226762 09/06/2020 12/ 06/ 2020 Producing on maingate to tailgate cutline run. Shearer was at PRS 61. All supports had advanced to PRS 59 as per automatics. PRS 54 lowered and set. Then PRS 53 lowered, advanced and set. HPH Moranbah North IN.00228237 29/06/2020 30/ 06/ 2020 When inspecting monorail found broken monorail joining bracket HPH
AAMC.001.031.0051
CONFIDENTIAL
9 INTERNAL
INJURY DETAILS FOR MONTH
Entity Event ID Event Date Event Title Actual Consequence Potential Consequence
Aquila Project IN.00227269 12/06/2020 Pinched Left Ring Finger Medical Treatment Case Medical Treatment Case IN.00227370 13/06/2020 Operator rolled ankle stepping out of container Medical Treatment Case Lost Time Injury Dawson IN.00227444 20/06/2020 CMW caught hand on a protruding screw Medical Treatment Case Medical Treatment Case Moranbah IN.00226256 06/06/2020 DNRM SA / LTI - Fall from truck trailer resulting in injury Lost Time Injury Lost Time Injury IN.00226365 08/06/2020 MTC / DNRM NRI - Outbye Operator Back Pain Medical Treatment Case Medical Treatment Case
AAMC.001.031.0052
CONFIDENTIAL
10 INTERNAL
MET COAL TRC IMPACT ANALYSIS – 2020 YTD
Analysis Calculator considers the actual or predicted outcome of Total Recordable Case (TRC) injuries based
worker and the potential compensation costs of each case. Each TRC is allocated a numerical score for each consideration, with the total score equating to an overall impact of low, moderate or high.
3 4 3 2 3 5 1 2 1 3 5 1 1 5 2 4 6 8 10 12 14 January February March April May June Low impact Moderate impact High impact
AAMC.001.031.0053
CONFIDENTIAL
11 INTERNAL
MET COAL OVERDUE INCIDENT INVESTIGATIONS
Entity Incident ID Incident Date Incident Summary: HPI/HPH
Moranbah North IN.00196054 20/02/2019 On 20th June 2019, an Underground Grader came into contact with a personnel carrier in the man and materials drift. HPI IN.00222655 30/03/2020 The driven pulley on PP303, Warman 10/8 filtrate pump at the CHPP failed during normal operations, resulting in damage to the pulley guard and projecting metal fragments around the localized area. There were no personnel in the immediate area at the time of the incident. HPI Aquila Project IN.00224366 30/04/2020 While Conducting an Inspection of Critical Fibre infrastructure an IM Officer has discovered and issue with the Network after testing, he has discovered damage to a fibre line from intentional cutting. Upon further investigation by the Aquila tea it was discovered that several high Tension cables had been cut and removed rom site. HV switch yard chains and locks had been cut - Exposure to 66kv and 11kv infrastructure - and switch room parts taken from enclosures. A vehicle had been driven around the site and used to transport the goods, upon further investigation it was discovered that other store items had been tampered with and components removed. Video footage has been reviewed with no evidence available HPH IN.00223004 6/04/2020 During the recent issue of COML it was identified that boreholes marked on the mine plan(Grasstree) were found to be in a different location when physically checked underground and on the mine surface by the Survey
Mine plan 25501. This hole was not previously visible on the recent Permit To Mine NE Mains 57-62 A-C & 901 TG to 2 c/t HPH Grosvenor IN.00224943 6/05/2020 At 2:57pm an ignition of gas occured on the longwall face of the LW104 panel. At the the time of the event the longwall (shearer) had been idle for approximately five minutes and the longwall operators were in the process
The five operators working in the area received significant burns as a result of the ignition. HPI
AAMC.001.031.0054
CONFIDENTIAL
12 INTERNAL
MET COAL – OVERDUE TASKS BASED ON REAL DUE DATE
Entity Task ID Task Name Original Due Date Real Due Date Task Assignee
NIL
HIGH PRIORITY TASKS: CRITICAL CONTROL TASKS:
Entity Task ID Task Name Original Due Date Real Due Date Task Assignee
Met Coal Exploration - Australia TS.01205472 Legal Compliance Audit Corrective Actions - Item 11 1/ 05/ 2020 1/ 05/ 2020 Glass Brendon - 6040027_Mc TS.01205476 Legal Compliance Audit Corrective Actions - Item 116 30/ 06/ 2020 30/ 06/ 2020
AUDIT TASKS:
Entity Task ID Task Name Original Due Date Real Due Date Task Assignee
NIL
AAMC.001.031.0055
CONFIDENTIAL
13 INTERNAL
MET COAL – ALL OVERDUE TASKS (REAL DUE DATE)
Entity Task ID Task Name Original Due Date Real Due Date Priority Task Assignee
Brisbane Corporate Office TS.01229626
31/12/2019 31/03/2020 Medium Buddle Timothy - 6041820_Mc TS.00678948 Develop and Implement Management Strategy for Cultural Heritage and First Nations 31/05/2018 20/12/2019 Medium Fittler Jason - 5433_Mc TS.01024178 Environmental aspects embedded in BRA and bow-ties completed for priority environmental control monitoring activities at all sites. 30/06/2019 31/12/2019 Medium TS.01024180 Health of Discipline conducted and Environmental Training Needs Analysis (TNA) developed and implemented. 31/07/2019 1/11/2019 Medium TS.01024198 Where gaps are identified, develop strategy to bring into compliance for current and future approvals. 30/11/2019 24/01/2020 Medium TS.01024183 Prepare and understand requirements to obtain ISO14001:2015 certification in 2020. 31/12/2019 31/12/2019 Medium TS.01024177 Update UG OMS to include environmental components and ensure compliance within the new OMS through assurance process. 31/12/2019 31/12/2019 Medium TS.00199845 Gap analysis of Aquila SHMS procedures for Low Voltage Electrical Testing and Extreme Weather and Lightning Protection 30/09/2016 31/05/2020 Medium Gannon Peter - 7414_Mc TS.01277732 OMS Documents 30/04/2020 30/06/2020 Medium Rocchi Luca - 6170152_Mc TS.01257995 Dragline Improvement Programme 31/03/2020 31/05/2020 Medium KAROOZ George - 903162_Mc TS.01024167 Assess the adequacy and design/function of MAW structures (inc. Sediment Dams). 31/05/2019 30/06/2020 Medium Rootsey Gavin Peteer - 6169019_Mc TS.01024146 Group water standards are analysed and action plans developed at priority sites. 30/06/2019 31/05/2020 Medium TS.01024142 Assist in Final Design and Commissioning of RO Plant Project at CapCoal 31/12/2019 30/06/2020 Medium TS.01030423 Re-certification of BCO WHSO 20/12/2019 20/12/2019 Medium Smith Ian - 8945_Mc TS.01267898 Dawson West 14/02/2020 31/03/2020 Low Walters Jamie - 8542_Mc
AAMC.001.031.0056
CONFIDENTIAL
14 INTERNAL
MET COAL – ALL OVERDUE TASKS (REAL DUE DATE) CONT
Entity Task ID Task Name Original Due Date Real Due Date Priority Task Assignee
Met Coal Exploration - Australia TS.01205472 Item 11 – ensure “Temporary Appointments” of SSE is appointed in writing when current SSE is absent. Ensure “Temporary SSE Appointments” are entered into the appointments folder in the Mine Record. 1/05/2020 1/05/2020 Low Glass Brendon - 6040027_Mc TS.01205476 Item 116 - Update Prohibited Articles Register 30/06/2020 30/06/2020 Low
AAMC.001.031.0057
CONFIDENTIAL
15 INTERNAL
EOFV ACTION PLAN PROGRESS
Entity
Open not due (count) Open past due (count) Closed (count) Total number
% Closed % Open not due % Open past due Completed Completed Overdue
Capcoal Grasstree 7 7 100 100 7 Grosvenor 8 8 100 8 Dawson 2 29 31 94 6 74 6 23 Moranbah North 3 8 11 73 27 8 Entity
Open not due (count) Open past due (count) Closed (count) Completed Overdue Total number
% Open not due % Open past due % Closed % On time closure In progress
Capcoal Open Cut 19 32 51 37 63 100 Moranbah North 18 1 18 100 94 Grosvenor 28 28 100 100 Capcoal Grasstree 1 22 23 4 96 100 1
EOF EPR ACTION PLAN PROGRESS
AAMC.001.031.0058
CONFIDENTIAL
16 INTERNAL
EOF PIMC ACTION PLAN PROGRESS
Entity
Open not due (count) Open past due (count) Closed (count) Total number
% Closed % Open not due % Open past due Scheduled
Capcoal Grasstree 17 17 100 Moranbah North 2 3 5 60 40 2 Capcoal Open Cut 4 4 100 Dawson 11 1 12 8 92 11 AAMC.001.031.0059
CONFIDENTIAL
17 INTERNAL
INTERNAL AAMC.001.031.0060
CONFIDENTIAL
18 INTERNAL
MET COAL HIGH POTENTIAL INCIDENTS
3 3 3 4 4 1 3 4 5 6 61 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Met Coal HPI Count YTD Comparison
YTD 2019 YTD 2020
1 2 1 1 1 12 18 13 17 14 19 5 10 15 20
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Met Coal - HPI / HPH Reporting
HPI HPH
0.00 1.00 2.00 3.00 4.00 5.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.98 0.99 0.96 0.00 0.91 3.91 0.92 1.77 0.84 0.87 0.87 0.00 3MMA 0.65 0.66 0.98 0.64 0.62 1.56 1.87 2.16 1.17 1.15 0.86 0.59 12MMA 0.95 0.69 0.76 0.75 0.74 0.98 1.05 0.95 1.02 1.09 1.08 1.07Met Coal HPIFR 3MMA v 12MMA AAMC.001.031.0061
CONFIDENTIAL
19 INTERNAL
MET COAL HIGH POTENTIAL HAZARD REPORTING
0.00 5.00 10.00 15.00 20.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 14.77 7.90 14.44 7.37 15.52 12.69 10.99 16.83 10.90 16.51 12.13 17.68 3MMA 16.93 16.10 12.39 9.88 12.43 11.86 13.08 13.56 12.89 14.69 13.16 15.39 12MMA 16.40 16.09 15.77 15.21 15.78 15.49 15.33 14.23 13.68 13.65 13.76 13.17Met Coal HPHFR 3MMA v 12MMA
12 42 60 77 88 114 12 31 44 63 77 9620 40 60 80 100 120
Jan Feb Mar Apr May Jun
Met Coal HPH Count YTD Comparison
YTD 2019 YTD 2020
15 8 15 8 17 13 12 19 13 19 14 19 2 4 6 8 10 12 14 16 18 20
Met Coal HPH Levels
# HPH Level 4 # HPH Level 5
5 10 15 20
Met Coal HPH SLT Reported
SLT Reported Non SLT Reported ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0062
CONFIDENTIAL
20 INTERNAL
MET COAL TOTAL RECORDABLE CASES
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 6.89 2.96 5.78 3.69 4.56 3.91 4.58 5.31 3.36 5.21 10.40 4.65 3MMA 5.86 5.59 5.22 4.15 4.66 4.06 4.36 4.62 4.39 4.61 6.29 6.81 12MMA 9.11 8.43 8.39 7.52 6.69 6.20 5.81 5.33 4.87 4.73 5.31 5.13Met Coal TRC 3MMA v 12MMA FR
9.34 10.47 9.80 9.14 8.03 7.84 4.58 4.95 4.39 4.60 5.77 5.592.00 4.00 6.00 8.00 10.00 12.00
Jan Feb Mar Apr May Jun
Met Coal TRCFR YTD Comparison
YTD 2019 YTD 2020
9 20 29 36 40 47 5 11 15 21 33 3810 20 30 40 50
Jan Feb Mar Apr May Jun
Met Coal TRC Count YTD Comparison
YTD 2019 YTD 2020
6.20 4.58 4.95 4.39 4.60 5.77 5.59 5.580.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
Met Coal TRCFR YTD
YTD YTD TargetAAMC.001.031.0063
CONFIDENTIAL
21 INTERNAL
MET COAL LOST TIME INJURIES
0.00 2.00 4.00 6.00 8.00 10.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 3.94 1.97 3.85 1.84 3.65 3.91 2.75 2.66 1.68 3.48 7.80 0.93 3MMA 3.26 3.61 3.26 2.55 3.11 3.12 3.42 3.08 2.34 2.59 4.29 4.14 12MMA 6.86 6.19 6.10 5.10 4.54 4.32 3.95 3.50 3.15 2.95 3.54 3.22Met Coal LTI 3MMA v 12MMA FR
7.26 7.85 7.09 6.86 5.62 5.51 2.75 2.70 2.34 2.63 3.67 3.241.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
Jan Feb Mar Apr May Jun
Met Coal LTIFR YTD Comparison
YTD 2019 YTD 2020
7 15 21 27 28 33 3 6 8 12 21 225 10 15 20 25 30 35
Jan Feb Mar Apr May Jun
Met Coal LTI Count YTD Comparison
YTD 2019 YTD 2020
4.32 2.75 2.70 2.34 2.63 3.67 3.24 3.890.00 1.00 2.00 3.00 4.00 5.00 6.00
Met Coal LTIFR YTD
YTD YTD TargetAAMC.001.031.0064
CONFIDENTIAL
22 INTERNAL
MET COAL OCCUPATIONAL ILLNESSES
4.15 3.66 3.38 2.79 2.61 2.34 0.92 1.80 1.17 1.10 2.62 2.360.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Jan Feb Mar Apr May Jun
Met Coal OCILFR YTD Comparison
YTD 2019 YTD 2020
4 7 10 11 13 14 1 4 4 5 15 162 4 6 8 10 12 14 16 18
Jan Feb Mar Apr May Jun
Met Coal OCIL Count YTD Comparison
YTD 2019 YTD 2020 0.00 2.00 4.00 6.00 8.00 10.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 1.97 0.99 2.89 0.92 2.74 1.95 0.92 2.66 0.00 0.87 8.67 0.93 3MMA 1.63 1.31 1.96 1.59 2.17 1.87 1.87 1.85 1.17 1.15 3.15 3.55 12MMA 2.60 2.41 2.46 2.26 1.98 2.12 1.86 1.83 1.57 1.55 2.15 2.14Met Coal OCIL 3MMA v 12MMA FR
2.12 0.92 1.80 1.17 1.10 2.62 2.36 1.910.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Met Coal OCILFR YTD
YTD YTD TargetAAMC.001.031.0065
CONFIDENTIAL
23 INTERNAL
MET COAL VFL INTERACTION ANALYSIS
81% 91% 91% 85% 88% 94% 95% 91% 0% 20% 40% 60% 80% 100%
Aquila Capcoal Grasstree Capcoal Open Cut Coal Exploration - Australia Dawson Grosvenor Moranbah North Met CoalMet Coal VFL's Safe vs Unsafe Month
% Safe % Unsafe
Met Coal VFL's Unsafe Month with Mechanism
11% 9% 9% 10% 10% 9% 0% 0% 0% 0% 0% 0%
89% 91% 91% 90% 90% 91% 0% 0% 0% 0% 0% 0%
0% 20% 40% 60% 80% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Met Coal Reported %SLT v Non-SLT VFL Interactions
SLT Non-SLT
92% 106% 96% 103% 104% 109% 101%20% 40% 60% 80% 100% 120% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Met Coal SLT VFL % Target
< 75% 75% - 95% > 95% 12% 6% 28% 23% 12% 12% 8% 9% 9% 25% 23% 11% 16% 8% 9% 6% 21% 29% 16% 15% 4% 11% 7% 23% 17% 14% 18% 10% 11% 4% 25% 14% 6% 25% 15% 15% 4% 30% 16% 21% 10% 5% 12% 9% 19% 12% 16% 19% 13%
Aquila Grasstree Capcoal OC Exploration Dawson Grosvenor Moranbah North Met Coal
7% 2% 36% 13% 16% 16% 11%
AAMC.001.031.0066
CONFIDENTIAL
24 INTERNAL
MET COAL OVERDUE TASKS
46 55 36 14 35 17 10 20 30 40 50 60 Jan Feb Mar Apr May Jun Met Coal Overdue Tasks 8 2 1 2 3 4 5 6 7 8 9 Jan Feb Mar Apr May Jun Met Coal Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun
Met Coal Overdue CC Tasks - Real Due Date
3 3 4 1 2 3 4 5 Jan Feb Mar Apr May Jun Met Coal Overdue HP Tasks - Real Due Date AAMC.001.031.0067
CONFIDENTIAL
25 INTERNAL
MET COAL INCIDENT INVESTIGATION / CLOSE OUT STATUS
HPH Brisbane Misc Aquila Capcoal Grasstree Capcoal Open Cut Dawson Grosvenor Moranbah North 2 1 2 7 1 31 2 3 4 5 6 7 8 HPH Investigation Status
Brisbane Misc Aquila Capcoal Grasstree Capcoal Open Cut Dawson Grosvenor Moranbah North Met Coal Exploration1 2 3
HPI Investigation Status
Not Due OverdueAAMC.001.031.0068
CONFIDENTIAL
26 INTERNAL
SHE WAY TASK PROGRESS
SHE Way – Task Tracking over Time
please contact Ian Hogg
1 1 1 8 13 12 27 7 11 28 22 3 14 3 3 6 4 4 7 3 1 1 9 5 10 15 20 25 30 35 Real Due Date SHE Way - Action Plan Graph by Site AAMC.001.031.0069
CONFIDENTIAL
27 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
EXPLORATION AUSTRALIA CRITICAL CONTROL DEFICIENCY SIGN OFF
Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
91 33 33
PUE Control ID Control Name Control Owner Observation Affect Control Corrective / Immediate Actions
No deficient controls were identified in June 2020
AAMC.001.031.0070
CONFIDENTIAL
28 INTERNAL
EXPLORATION AUSTRALIA AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2017 Environment OCA Actions Completed Completed Completed AP.00616689 2017 Environment OCA Actions 76% 2017 CMO Audit Completed Completed Completed AP.00624674 2017 Coal Mine Operator Effectiveness (CMO) Audit 90% 2020 Legal Audit Completed Completed Completed AP.00765986 Legal Compliance Audit Corrective Actions 20% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0071
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0072
CONFIDENTIAL
30 INTERNAL
AQUILA SAFETY OVERVIEW SUMMARY
AAMC.001.031.0073
CONFIDENTIAL
31 INTERNAL
AQUILA HIGH POTENTIAL INCIDENTS
1 2 3
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Aquila HPI / HPH Reporting HPI HPH
1
Jan Feb Mar Apr May Jun
Aquila HPI Count YTD Comparison
YTD 2019 YTD 2020
0.00 0.20 0.40 0.60 0.80 1.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Aquila HPIFR 3MMA v 12MMA AAMC.001.031.0074
CONFIDENTIAL
32 INTERNAL
AQUILA HIGH POTENTIAL HAZARDS
1 1 3 3 31 2 3 4
Jan Feb Mar Apr May Jun
Aquila HPH Count YTD Comparison
YTD 2019 YTD 2020 0.00 10.00 20.00 30.00 40.00 50.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.82 0.00 38.97 0.00 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.49 7.41 20.98 13.13 12.10 12MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.49 7.41 16.11 12.53 9.99Aquila HPHFR 3MMA v 12MMA AAMC.001.031.0075
CONFIDENTIAL
33 INTERNAL
AQUILA TOTAL RECORDABLE CASES
23.16 22.99 22.24 16.11 16.71 19.995.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Aquila TRCFR YTD Comparison
YTD 2019 YTD 2020
1 2 3 3 4 61 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Aquila TRC Count YTD Comparison
YTD 2019 YTD 2020
23.16 22.99 22.24 16.11 16.71 19.99 0.005.00 10.00 15.00 20.00 25.00
Aquila TRCFR YTD
YTD Target0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.8220.89 0.00 18.8232.87 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.9922.2413.9813.1318.15 12MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.9922.2416.1116.7119.99
Aquila TRCFR 3MMA v 12MMA AAMC.001.031.0076
CONFIDENTIAL
34 INTERNAL
1 1 2 2 3 31 2 3 4
Jan Feb Mar Apr May Jun
Aquila LTI Count YTD Comparison
YTD 2019 YTD 2020
AQUILA LOST TIME INJURIES
23.16 11.49 14.83 10.74 12.53 9.99 0.005.00 10.00 15.00 20.00 25.00
Aquila LTIFR YTD
YTD Target0.00 5.00 10.00 15.00 20.00 25.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 23.16 0.00 20.89 0.00 18.82 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1611.4914.83 6.99 13.13 6.05 12MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1611.4914.8310.7412.53 9.99
Aquila LTIFR 3MMA v 12MMA
23.16 11.49 14.83 10.74 12.53 9.995.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Aquila LTIFR YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0077
CONFIDENTIAL
35 INTERNAL
AQUILA OCCUPATIONAL ILLNESSES
1.00
Jan Feb Mar Apr May Jun
Aquila OCILFR YTD Comparison
YTD 2019 YTD 2020
1
Jan Feb Mar Apr May Jun
Aquila OCIL Count YTD Comparison
YTD 2019 YTD 2020
0.400.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45
Aquila OCILFR YTD
YTD Target0.00 0.20 0.40 0.60 0.80 1.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aquila OCILFR 3MMA v 12MMA AAMC.001.031.0078
CONFIDENTIAL
36 INTERNAL
AQUILA OVERDUE TASKS
6 3 10 2 4 6 8 10 12 Jan Feb Mar Apr May Jun Aquila Overdue Tasks 1 Jan Feb Mar Apr May Jun Aquila Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Aquila Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Aquila Overdue Tasks - Real Due Date AAMC.001.031.0079
CONFIDENTIAL
37 INTERNAL
AQUILA VFL INTERACTION ANALYSIS
67% 71% 75% 82% 82% 81% 0% 0% 0% 0% 0% 0%
33% 29% 25% 18% 18% 19% 0% 0% 0% 0% 0% 0%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Aquila % Safe v Unsafe VFL Interactions
Safe Unsafe
69% 79% 116% 104% 110% 123% 101%20% 40% 60% 80% 100% 120% 140% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
AquilaSLT VFL % Target
< 75% 75% - 95% > 95%
AAMC.001.031.0080
CONFIDENTIAL
38 INTERNAL
AQUILA AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2020 OCA Audit Completed Completed Completed AP.00781572 2020 Environmental OCA Aquila 11% 2019 Legal Audit Completed Completed Completed AP.00766579 2019 Stat Compliance Audit Aquila SHMS - Corrective Actions 100% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0081
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0082
CONFIDENTIAL
40 INTERNAL
CAPCOAL OPEN CUT SAFETY OVERVIEW SUMMARY
AAMC.001.031.0083
CONFIDENTIAL
41 INTERNAL
CAPCOAL OPEN CUT HIGH POTENTIAL INCIDENTS
0.00 2.00 4.00 6.00 8.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 5.78 0.00 6.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3MMA 0.00 0.00 2.09 2.01 3.93 2.03 2.09 0.00 0.00 0.00 0.00 0.00 12MMA 2.24 1.67 2.18 2.14 2.12 2.08 2.07 1.03 1.03 1.02 1.01 1.00
Capcoal Open Cut HPIFR 3MMA v 12MMA 1 7 5 5 6 3 2 4 6 8
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Capcoal Open Cut HPI / HPH Reporting HPI HPH
2 2 2 21 2 3
Jan Feb Mar Apr May
Capcoal Open Cut HPI Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0084
CONFIDENTIAL
42 INTERNAL
CAPCOAL OPEN CUT HIGH POTENTIAL HAZARDS
0.00 20.00 40.00 60.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 33.26 19.28 40.49 0.00 48.20 19.03 6.50 43.54 28.20 30.07 31.68 16.85 3MMA 31.76 31.70 31.33 20.07 29.48 22.29 25.13 23.29 26.42 33.71 30.02 26.23 12MMA 30.30 30.62 31.12 27.84 29.61 29.16 27.47 27.85 29.27 27.66 28.68 26.53Capcoal Open Cut HPHFR 3MMA v 12MMA
1 2 3 4 5 6 7 8 9
Capcoal Open Cut SLT Reported HPH’s
SLT Reported Non SLT Reported
4 10 12 20 23 30 1 8 13 18 24 275 10 15 20 25 30 35
Jan Feb Mar Apr May Jun
Capcoal Open Cut HPH Count YTD Comparison
YTD 2019 YTD 2020 ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0085
CONFIDENTIAL
43 INTERNAL
CAPCOAL OPEN CUT TOTAL RECORDABLE CASES
0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 6.43 11.57 0.00 6.02 0.00 6.50 0.00 0.00 0.00 5.28 0.00 3MMA 4.23 6.34 6.27 6.02 5.90 2.03 4.19 2.12 2.03 0.00 1.88 1.87 12MMA 4.49 4.45 5.46 5.35 4.76 3.64 4.15 3.61 3.59 3.59 4.03 3.00
Capcoal Open Cut TRCFR 3MMA v 12MMA
0.00 3.37 2.15 1.60 1.28 3.16 6.50 3.18 2.03 1.52 2.36 1.951.00 2.00 3.00 4.00 5.00 6.00 7.00
Jan Feb Mar Apr May Jun
Capcoal Open Cut TRCFR
YTD Comparison YTD 2019 YTD 2020
1 1 1 1 3 1 1 1 1 2 21 2 3 4
Jan Feb Mar Apr May Jun
Capcoal Open Cut TRC Count
YTD Comparison YTD 2019 YTD 2020
3.64 6.50 3.18 2.03 1.52 2.36 1.95 3.280.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00
Capcoal Open Cut TRCFR YTD
YTD TargetAAMC.001.031.0086
CONFIDENTIAL
44 INTERNAL
CAPCOAL OPEN CUT LOST TIME INJURIES
0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 6.43 11.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3MMA 4.23 6.34 6.27 6.02 3.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12MMA 2.81 2.78 3.82 3.75 3.17 3.12 3.11 2.58 2.57 2.56 2.52 1.50
Capcoal Open Cut LTIFR 3MMA v 12MMA
3.37 2.15 1.60 1.28 3.161.00 2.00 3.00 4.00
Jan Feb Mar Apr May Jun
Capcoal Open Cut LTIFR
YTD Comparison YTD 2019 YTD 2020
1 1 1 1 31 2 3 4
Jan Feb Mar Apr May Jun
Capcoal Open Cut LTI Count
YTD Comparison YTD 2019 YTD 2020
3.12 2.810.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50
Capcoal Open Cut LTIFR YTD
YTD TargetAAMC.001.031.0087
CONFIDENTIAL
45 INTERNAL
CAPCOAL OPEN CUT OCCUPATIONAL ILLNESSES
6.88 3.37 2.15 1.60 1.28 1.05 3.18 2.03 3.04 3.54 2.921.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Jan Feb Mar Apr May Jun
Capcoal Open Cut OCILFR
YTD Comparison YTD 2019 YTD 2020
1 1 1 1 1 1 1 1 2 3 31 2 3 4
Jan Feb Mar Apr May Jun
Capcoal Open Cut OCIL Count
YTD Comparison YTD 2019 YTD 2020
1.04 3.18 2.03 3.04 3.54 2.92 0.940.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Capcoal Open Cut OCILFR YTD
YTD Target0.00 2.00 4.00 6.00 8.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 5.89 0.00 0.00 0.00 6.22 0.00 6.01 5.28 0.00 3MMA 0.00 0.00 0.00 2.01 1.97 2.03 0.00 2.12 2.03 3.97 3.75 3.75 12MMA 0.56 0.56 0.55 1.07 1.06 1.04 0.52 1.03 1.03 1.54 2.01 2.00
Capcoal Open Cut OCIL 3MMA v 12MMA FR AAMC.001.031.0088
CONFIDENTIAL
46 INTERNAL
CAPCOAL OPEN CUT OVERDUE TASKS
2 1 2 3 Jan Feb Mar Apr May Jun Capcoal Open Cut Overdue Tasks 1 Jan Feb Mar Apr May Jun Capcoal OC Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Capcoal Open Cut Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Capcoal OC Overdue CC Tasks - Real Due Date AAMC.001.031.0089
CONFIDENTIAL
47 INTERNAL
CAPCOAL OPEN CUT VFL INTERACTION ANALYSIS
24% 19% 19% 18% 15% 11% 0% 0% 0% 0% 0% 0%
76% 81% 81% 82% 85% 89% 0% 0% 0% 0% 0% 0%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Capcoal Open Cut %SLT v Non-SLT VFL Interactions
SLT Non-SLT
118% 101% 109% 149% 120% 109% 116%20% 40% 60% 80% 100% 120% 140% 160% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Capcoal Open Cut SLT VFL % Target
< 75% 75% - 95% > 95%
92% 92% 93% 92% 94% 91% 0% 0% 0% 0% 0% 0%0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Capcoal Open Cut% Safe v Unsafe VFL Interactions
Safe Unsafe
AAMC.001.031.0090
CONFIDENTIAL
48 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
CAPCOAL O/C CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
54 37 32 5 2
Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00015802 - Trapped in Burning Machinery CT.00024931 Fighting Equipment, Fire Detection, Fire Suppression and Alarm systems Jacobson Clay - 984328_Mc Recent flow test for selected hydrants across site have failed. Sicada have been instructed to work out why. No N/A Arrange sicada to investigate sudden failure in fire pumps across site CT.00024933 Emergency response capability for managing fire All gear is present and functional on the
however the German Creek fire truck is still
No N/A Follow up with Haynes to ensure PTO is fixed in timely manner
AAMC.001.031.0091
CONFIDENTIAL
49 INTERNAL
CAPCOAL OPEN CUT AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2018 SHE Way Gap Analysis Gap Analysis completed Not Applicable Not Applicable AP.00690768 Capcoal OC SHE Way Gap Analysis Action Plan 98% 2020 ENV OCA Completed Completed Completed AP.00781411 2020 Environmental OCA Capcoal 34% 2019 Legal Audit Completed Completed Completed AP.00766118 2019 Legal Compliance Audit 100% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0092
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0093
CONFIDENTIAL
51 INTERNAL
DAWSON SAFETY OVERVIEW SUMMARY
(1 HPI remains within 3 months).
AAMC.001.031.0094
CONFIDENTIAL
52 INTERNAL
DAWSON HIGH POTENTIAL INCIDENTS
6 6 5 6 4 7 2 4 6 8
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Dawson HPI / HPH Reporting HPI HPH
0.00 1.00 2.00 3.00 4.00 5.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 4.03 0.00 0.00 0.00 0.00 3.88 0.00 3.60 0.00 3.66 0.00 0.00 3MMA 1.28 1.32 1.34 0.00 0.00 1.26 1.24 2.47 1.17 2.35 1.14 1.19 12MMA 1.02 0.34 0.34 0.33 0.33 0.66 0.65 0.96 0.95 1.25 1.24 1.24
Dawson HPIFR 3MMA v 12MMA
1 1 2 2 21 2 3
Jan Feb Mar Apr May Jun
Dawson HPI Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0095
CONFIDENTIAL
53 INTERNAL
DAWSON HIGH POTENTIAL HAZARDS
3 22 33 38 44 51 6 12 17 23 27 3410 20 30 40 50 60
Jan Feb Mar Apr May Jun
Dawson HPH Count YTD Comparison
YTD 2019 YTD 2020 0.00 10.00 20.00 30.00 40.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 20.1420.4027.6322.7925.7019.4121.7521.6016.7021.9613.1626.47 3MMA 23.0622.4122.7723.6325.3522.6922.3320.9519.9319.9917.1120.20 12MMA 27.5027.8427.9527.7229.2328.3728.9124.4022.1722.2021.3321.33
Dawson HPHFR 3MMA v 12MMA
1 2 3 4 5 6 7
Dawson SLT Reported HPH's
SLT Reported Non SLT Reported ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0096
CONFIDENTIAL
54 INTERNAL
DAWSON TOTAL RECORDABLE CASES
2.64 1.17 3.55 4.89 4.72 2.380.00 1.00 2.00 3.00 4.00 5.00 6.00
Dawson TRCFR YTD
0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 7.60 0.00 0.00 0.00 0.00 3.34 10.98 9.87 3.78 3MMA 5.12 3.95 0.00 2.63 2.53 2.52 0.00 0.00 1.17 4.70 7.99 8.32 12MMA 5.77 4.75 4.38 4.01 2.99 2.64 2.60 2.25 2.22 3.13 3.71 3.09
Dawson TRCFR 3MMA v 12MMA
1 2 2 3 6 1 4 7 81 2 3 4 5 6 7 8 9
Jan Feb Mar Apr May Jun
Dawson TRC Count YTD Comparison
YTD 2019 YTD 2020
2.12 2.75 2.08 2.45 4.02 1.17 3.55 4.89 4.721.00 2.00 3.00 4.00 5.00 6.00
Jan Feb Mar Apr May Jun
Dawson TRCFR YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0097
CONFIDENTIAL
55 INTERNAL
DAWSON LOST TIME INJURIES
0.66 1.17 3.55 4.20 3.54 0.590.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50
Dawson LTIFR YTD
1 1 4 6 61 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Dawson LTI Count YTD Comparison
YTD 2019 YTD 2020
0.67 1.17 3.55 4.20 3.541.00 2.00 3.00 4.00 5.00
Jan Feb Mar Apr May Jun
Dawson LTIFR YTD Comparison
YTD 2019 YTD 2020 0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 3.80 0.00 0.00 0.00 0.00 3.34 10.98 6.58 0.00 3MMA 1.28 1.32 0.00 1.31 1.27 1.26 0.00 0.00 1.17 4.70 6.84 5.94 12MMA 3.40 2.72 2.36 1.67 1.00 0.66 0.65 0.64 0.95 1.88 2.47 2.16
Dawson LTI 3MMA v 12MMA FR AAMC.001.031.0098
CONFIDENTIAL
56 INTERNAL
DAWSON OCCUPATIONAL ILLNESS
4.62 1.81 1.17 0.89 0.70 0.59 4.160.00 1.00 2.00 3.00 4.00 5.00 6.00
Dawson OCILFR YTD
8.71 6.36 6.87 5.21 4.08 4.02 0.00 1.81 1.17 0.89 0.70 0.592.00 4.00 6.00 8.00 10.00
Jan Feb Mar Apr May Jun
Dawson OCILFR YTD Comparison
YTD 2019 YTD 2020
2 3 5 5 5 6 1 1 1 1 11 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Dawson OCIL Count YTD Comparison
YTD 2019 YTD 2020 0.00 2.00 4.00 6.00 8.00 10.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 8.06 4.08 3.95 0.00 7.34 7.76 0.00 3.60 0.00 0.00 0.00 0.00 3MMA 3.84 5.27 5.36 2.63 3.80 5.04 4.96 3.70 1.17 1.18 0.00 0.00 12MMA 5.77 5.09 5.39 5.01 3.99 4.62 3.90 3.85 3.17 3.13 3.09 2.78
Dawson OCILFR 3MMA v 12MMA AAMC.001.031.0099
CONFIDENTIAL
57 INTERNAL
DAWSON OVERDUE TASKS
1 2 3 Jan Feb Mar Apr May Jun Dawson Overdue Tasks 1 Jan Feb Mar Apr May Jun Dawson Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Dawson Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Dawson Overdue CC Tasks - Real Due Date AAMC.001.031.0100
CONFIDENTIAL
58 INTERNAL
DAWSON VFL ANALYSIS
134% 124% 96% 116% 110% 151% 122%20% 40% 60% 80% 100% 120% 140% 160% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Dawson SLT VFL % Target
< 75% 75% - 95% > 95%
89% 93% 93% 93% 92% 88% 0% 0% 0% 0% 0% 0%0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Dawson % Safe v Unsafe VFL Interactions
Safe Unsafe 21% 9% 15% 25% 13% 15% 0% 0% 0% 0% 0% 0% 79% 91% 85% 75% 87% 85% 0% 0% 0% 0% 0% 0% 0% 20% 40% 60% 80% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Dawson %SLT v Non-SLT VFL Interactions
SLT Non-SLT
AAMC.001.031.0101
CONFIDENTIAL
59 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
DAWSON CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
109 59 59 2
Fundamental Actions to address HPH’s (to be completed by site) Due Date Responsible Person PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00005830 - Injury from interaction with fixed plant, eg moving / rotating equipment, conveyors, pumps, pinch points,
etc CT.00012616 Prevention of people contacting moving parts by exclusion zones and guarding Wilkie Luke - 6082047_Mc As per previous comment (CV303 and CV304 scraper guards U/S) No N/A Repair guards at head of CV303 and CV307 as per notifications Identified that the guards around the scrapers
exposing a pinch point. Notifications raised and maintenance supervisor informed. Area made safe with barricading. NOTI 11673630 and 11673632. BW.00005800 - Equipment /
work related) fire resulting in injury, (including from tyre fire) CT.00012304 Gas cylinders fit for purpose- flash back arrestors and deflector plates Clarke Adrian - 17077_Mc Inspected ancillary. one oxy acetylene set did not have flash back arrestors on the
No N/A Install flash back arrestors
Acetylene bottles
AAMC.001.031.0102
CONFIDENTIAL
60 INTERNAL
DAWSON AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2020 Legal Audit Completed Completed Completed AP.00776046 Dawson Mine Legal Compliance Action Plan 18% Legal Audits Completed Completed Completed AP.00090008 Dawson Mine Legal Compliance Action Plan 100% 2019 Legal Audit Completed Completed Completed AP.00765572 Legal Compliance Audit 2019 Actions 100% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0103
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0104
CONFIDENTIAL
62 INTERNAL
GRASSTREE SAFETY OVERVIEW SUMMARY
June (YTD TRC=6, LTI=2).
AAMC.001.031.0105
CONFIDENTIAL
63 INTERNAL
GRASSTREE HIGH POTENTIAL INCIDENTS
0.00 0.20 0.40 0.60 0.80
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12MMA 0.60 0.60 0.59 0.58 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grasstree HPIFR 3MMA v 12MMA
1
Jan Feb Mar Apr May Jun
Grasstree HPI Count
YTD Comparison YTD 2019 YTD 2020
2 1 1 1 1 1 2 3
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grasstree HPI v HPH Reporting HPI HPH AAMC.001.031.0106
CONFIDENTIAL
64 INTERNAL
GRASSTREE HIGH POTENTIAL HAZARDS
0.00 5.00 10.00 15.00 20.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 14.09 0.00 7.05 0.00 0.00 0.00 14.78 7.34 0.00 6.60 6.46 7.20 3MMA 4.61 4.73 7.02 2.30 2.30 0.00 4.99 7.60 7.16 4.59 4.41 6.74 12MMA 5.99 4.17 4.12 4.08 4.08 2.93 3.54 4.15 3.54 4.10 4.69 5.27Grasstree HPHFR 3MMA v 12MMA
1 1 2 2 2 2 2 3 3 4 5 61 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Grasstree HPH Count
YTD Comparison YTD 2019 YTD 2020 1 2 3
Grasstree SLT Reported HPH's
SLT Reported Non SLT Reported ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0107
CONFIDENTIAL
65 INTERNAL
GRASSTREE TOTAL RECORDABLE CASES
0.00 5.00 10.00 15.00 20.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 7.04 0.00 7.05 13.32 7.01 8.13 7.39 14.68 13.56 0.00 6.46 0.00 3MMA 6.91 7.10 4.68 6.89 9.20 9.62 7.48 10.14 11.93 9.19 6.61 2.25 12MMA 11.99 9.53 8.82 8.17 8.16 7.61 6.48 7.70 8.26 7.62 8.21 7.03Grasstree TRCFR 3MMA v 12MMA
20.59 10.32 9.25 8.73 6.87 8.10 7.39 11.05 11.93 8.76 8.27 6.945.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Grasstree TRCFR
YTD Comparison YTD 2019 YTD 2020
3 3 4 5 5 7 1 3 5 5 6 61 2 3 4 5 6 7 8
Jan Feb Mar Apr May Jun
Grasstree TRC Count
YTD Comparison YTD 2019 YTD 2020
7.61 7.39 11.05 11.93 8.76 8.27 6.94 6.850.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Grasstree TRCFR YTD AAMC.001.031.0108
CONFIDENTIAL
66 INTERNAL
GRASSTREE LOST TIME INJURIES
0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 7.04 0.00 7.05 6.66 7.01 8.13 7.39 7.34 0.00 0.00 0.00 0.00 3MMA 6.91 7.10 4.68 4.59 6.90 7.22 7.48 7.60 4.77 2.30 0.00 0.00 12MMA 10.19 7.75 7.65 6.42 6.41 6.44 5.89 6.51 5.90 5.28 5.28 4.10
Grasstree LTIFR 3MMA v 12MMA
13.73 6.88 6.94 6.99 5.50 6.94 7.39 7.36 4.77 3.51 2.76 2.312.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
Jan Feb Mar Apr May Jun
Grasstree LTIFR
YTD Comparison YTD 2019 YTD 2020
2 2 3 4 4 6 1 2 2 2 2 21 2 3 4 5 6 7
Jan Feb Mar Apr May Jun
Grasstree LTI Count
YTD Comparison YTD 2019 YTD 2020
6.44 7.39 7.36 4.77 3.51 2.76 2.31 5.800.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Grasstree LTIFR YTD AAMC.001.031.0109
CONFIDENTIAL
67 INTERNAL
GRASSTREE OCCUPATIONAL ILLNESSES
0.00 2.00 4.00 6.00 8.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 7.01 0.00 7.39 7.34 0.00 0.00 0.00 0.00 3MMA 0.00 0.00 0.00 0.00 2.30 2.41 4.99 5.07 4.77 2.30 0.00 0.00 12MMA 1.20 1.19 1.18 1.17 1.17 1.17 1.18 1.78 1.77 1.76 1.76 1.76
Capcoal Grasstree OCIL 3MMA v 12MMA FR
6.86 3.44 2.31 1.75 1.37 1.16 7.39 7.36 4.77 3.51 2.76 2.311.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Jan Feb Mar Apr May Jun
Grasstree OCILFR
YTD Comparison YTD 2019 YTD 2020
1 1 1 1 1 1 1 2 2 2 2 21 2 3
Jan Feb Mar Apr May Jun
Grasstree OCIL Count
YTD Comparison YTD 2019 YTD 2020
1.17 7.39 7.36 4.77 3.51 2.76 2.31 1.050.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Capcoal Grasstree OCILFR YTD AAMC.001.031.0110
CONFIDENTIAL
68 INTERNAL
GRASSTREE OVERDUE TASKS
5 2 1 2 3 4 5 6 Jan Feb Mar Apr May Jun Grasstree Overdue Tasks 1 Jan Feb Mar Apr May Jun Grasstree Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Grasstree Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Grasstree Overdue CC Tasks - Real Due Date AAMC.001.031.0111
CONFIDENTIAL
69 INTERNAL
GRASSTREE VFL ANALYSIS
104% 106% 117% 117% 103% 111% 110%20% 40% 60% 80% 100% 120% 140% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Grasstree SLT VFL % Target
< 75% 75% - 95% > 95%
95% 93% 95% 92% 93% 91% 0% 0% 0% 0% 0% 0%0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grasstree % Safe v Unsafe VFL Interactions
Safe Unsafe 11% 10% 11% 11% 9% 11% 0% 0% 0% 0% 0% 0% 89% 90% 89% 89% 91% 89% 0% 0% 0% 0% 0% 0% 0% 20% 40% 60% 80% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grasstree %SLT v Non-SLT VFL Interactions
SLT Non-SLT
AAMC.001.031.0112
CONFIDENTIAL
70 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
138 60 60 3
PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00005526 - CMW are adversely affected by underground dust, coal dust, crystalline silica, coatings and sprays (Note: not referring to explosions) CT.00039226 Dust suppression on the miner, belts, shearer (sprays) McNally Timothy
Longwall - Longwall not operational during month due to
install face and validated in accordance with relevant drawings. Inspected performance of new spray circuit on SWP
environmental monitoring to be conducted once production commences as part of change management
TS.01229648 & TS.01229649 in
up indicates systems functioning correctly (attached). Conveyors - Inspected GCV910 tripper following commissioning and waiting for longwall production. Found dust suppression installation to be less than
prior to LW coal and has been reported as complete. Maintenance inspection sheets for the tripper immediately after LW start-up (attached)indicate it has not been completed satisfactorily. Enablon action raised against this monitoring activity. No N/A Complete installation of GCV910 tripper air atomising sprays & dust containment cover and end flap
AAMC.001.031.0113
CONFIDENTIAL
71 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
138 60 60 3
PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00005600 - Inadequate drainage of inseam gas through SIS and UIS boreholes affecting longwall mining CT.00008390 Borehole Intersection Notices Payne Matt - 16225_Mc BIN tracking has been updated to now include not only the yearly running spreadsheet, but also a sequence plan based tracker to ensure the MSO are receiving BIN back based on the mining chainages. Tracking spreadsheet completed fortnightly due to coverage. Non-compliances have been found and incident forms raised for incorrect treatment and misinformation on the form by ERZC. No N/A Refer Observation Detail - No tasks created against inspection. Non-compliance due to 1x incident, 1x HPI in regards to BINs and treatment of boreholes for the month. 1x incident of methane layering in 910MG due to boreholes not being treated as per the supplied BIN and then being signed off as completed correctly by the ERZ. 1x HPI due to layering and high gas >2.5% in 810MG dogleg due to similar issue where the boreholes are intersected and not treated properly as per the supplied BIN. Document review for SWP.GTM.177 being completed to ensure it is clear enough how to treat boreholes (it is very clear) and crews have been counselled yet again on correctly grouting or hosing over holes. combination of complacency and production targets.
AAMC.001.031.0114
CONFIDENTIAL
72 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed No.Overdue
138 60 60 3
Fundamental Actions to address HPH’s (to be completed by site) Due Date Responsible Person PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00005606 - A CMW is adversely affected due to exposure to a radiation source
hole loggers) CT.00009669 Control of Energy SOP - Basic Isolation, Complex Personal Isolation & Complex Group Isolation process' Murphy Stuart - 986930_Mc Both a basic and a Group Complex isolation were audited. There were issues identified in the Complex isolation which did not affect the integrity of the isolation as it was
to capture the issues discovered. evidence attached as evidence. No N/A Complete incident report into deficiencies discovered during critical control monitoring activity on GCV910 Isolation
AAMC.001.031.0115
CONFIDENTIAL
73 INTERNAL
GRASSTREE AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2018 ENV OCA Audit Yes Yes Yes AP.00740027 Grasstree 2018 Environment OCA 95% 2020 ENV OCA Completed Completed Completed AP.00781546 2020 Environmental OCA Grasstree 53% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0116
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0117
CONFIDENTIAL
75 INTERNAL
GROSVENOR SAFETY OVERVIEW SUMMARY
com event this month. No ‘Safety’ HPIs (YTD=2) or TRCs were reported during June (YTD TRC=11, LTI=9).
developing re-entry and recovery plan.
consequence dates.
monitoring not being completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground workings. No risk to personnel as no access Underground. Monitoring activities will recommence
AAMC.001.031.0118
CONFIDENTIAL
76 INTERNAL
GROSVENOR HIGH POTENTIAL INCIDENTS
1 1 1 2 2 1 21 2 3
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grosvenor HPI / HPH Reporting HPI HPH
0.00 5.00 10.00 15.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 12.10 0.00 5.52 0.00 0.00 8.28 0.00 3MMA 0.00 0.00 0.00 0.00 0.00 3.93 3.88 5.72 1.87 1.87 2.11 2.47 12MMA 0.00 0.00 0.00 0.00 0.00 1.01 1.00 1.47 1.46 1.46 1.99 2.05
Grosvenor HPIFR 3MMA v 12MMA
1 1 1 2 21 2 3
Jan Feb Mar Apr May Jun
Grosvenor HPI Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0119
CONFIDENTIAL
77 INTERNAL
GROSVENOR HIGH POTENTIAL HAZARDS
2 3 5 8 9 14 1 3 5 6 6 82 4 6 8 10 12 14 16
Jan Feb Mar Apr May Jun
Grosvenor HPH Count
YTD Comparison YTD 2019 YTD 2020 0.00 5.00 10.00 15.00 20.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 5.75 0.00 0.00 5.86 5.77 18.15 5.64 11.0311.28 5.71 0.00 18.33 3MMA 13.7411.86 1.99 2.00 3.96 9.82 9.69 11.45 9.33 9.37 6.34 7.41 12MMA 11.5111.46 9.87 9.83 9.23 10.11 9.47 9.83 9.76 8.74 8.47 7.16
Grosvenor HPHFR 3MMA v 12MMA
1 2 3
Grosvenor SLT Reported HPH's
SLT Reported Non SLT Reported ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0120
CONFIDENTIAL
78 INTERNAL
GROSVENOR TOTAL RECORDABLE CASES
0.00 20.00 40.00 60.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 17.2511.81 0.00 0.00 0.00 12.10 5.64 11.03 0.00 11.4249.69 0.00 3MMA 7.85 9.88 9.93 4.00 0.00 3.93 5.81 9.54 5.60 7.49 16.9119.76 12MMA 13.6114.5914.0312.4210.26 9.10 7.98 8.35 6.35 6.31 8.97 9.21
Grosvenor TRCFR 3MMA v 12MMA
19.96 13.24 17.16 15.88 13.70 11.39 5.64 8.36 5.60 7.03 13.22 11.695.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Grosvenor TRCFR
YTD 2019 YTD 2020
3 4 8 10 11 1 3 3 5 112 4 6 8 10 12
Jan Feb Mar Apr May
Grosvenor TRC Count
YTD 2019 YTD 2020
9.10 5.64 8.36 5.60 7.03 13.22 11.69 8.190.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Grosvenor TRCFR YTD AAMC.001.031.0121
CONFIDENTIAL
79 INTERNAL
GROSVENOR LOST TIME INJURIES
0.00 20.00 40.00 60.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 11.50 5.91 0.00 0.00 0.00 12.10 0.00 11.03 0.00 5.71 49.69 0.00 3MMA 3.93 5.93 5.96 2.00 0.00 3.93 3.88 7.63 3.73 5.62 14.7917.29 12MMA 10.4710.9410.39 8.80 7.18 6.07 4.49 5.41 3.91 3.88 6.97 7.16
Grosvenor LTIFR 3MMA v 12MMA
19.96 9.93 12.87 11.11 8.72 7.25 5.57 3.73 4.22 10.82 9.565.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Grosvenor LTIFR
YTD 2019 YTD 2020
3 3 6 7 7 7 2 2 3 9 91 2 3 4 5 6 7 8 9 10
Jan Feb Mar Apr May Jun
Grosvenor LTI Count
YTD 2019 YTD 2020
6.07 5.57 3.73 4.22 10.82 9.56 5.460.00 2.00 4.00 6.00 8.00 10.00 12.00
Grosvenor LTIFR YTD AAMC.001.031.0122
CONFIDENTIAL
80 INTERNAL
GROSVENOR OCCUPATIONAL ILLNESSES
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 6.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.54 0.00 3MMA 0.00 0.00 1.99 2.00 1.98 0.00 0.00 0.00 0.00 0.00 19.0222.23 12MMA 3.66 3.65 3.12 2.07 2.05 2.02 1.99 1.47 0.98 0.49 4.98 5.12
Grosvenor OCILFR 3MMA v 12MMA
2.02 10.82 9.56 1.820.00 2.00 4.00 6.00 8.00 10.00 12.00
Grosvenor OCILFR YTD
1 2 3 3 3 9 92 4 6 8 10
Jan Feb Mar Apr May Jun
Grosvenor OCIL Count YTD Comparison
YTD 2019 YTD 2020
3.31 4.29 4.76 3.74 3.11 10.82 9.562.00 4.00 6.00 8.00 10.00 12.00
Jan Feb Mar Apr May Jun
Grosvenor OCILFR YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0123
CONFIDENTIAL
81 INTERNAL
GROSVENOR OVERDUE TASKS
1 Jan Feb Mar Apr May Jun Grosvenor Overdue Tasks 1 Jan Feb Mar Apr May Jun Grosvenor Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Grosvenor Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Grosvenor Overdue CC Tasks - Real Due Date AAMC.001.031.0124
CONFIDENTIAL
82 INTERNAL
GROSVENOR VFL ANALYSIS
90% 120% 99% 99% 106% 115% 103%20% 40% 60% 80% 100% 120% 140% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Grosvenor SLT VFL % Target
< 75% 75% - 95% > 95%
91% 93% 92% 93% 94% 94% 0% 0% 0% 0% 0% 0%0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grosvenor % Safe v Unsafe VFL Interactions
Safe Unsafe 8% 17% 7% 7% 7% 5% 0% 0% 0% 0% 0% 0% 92% 83% 93% 93% 93% 95% 0% 0% 0% 0% 0% 0% 0% 20% 40% 60% 80% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Grosvenor %SLT v Non-SLT VFL Interactions
SLT Non-SLT
AAMC.001.031.0125
CONFIDENTIAL
83 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed Action Required
122 51 51 12 1
PUE Control ID Control Name Control Owner Observation Affect Control * HPH ID Corrective / Immediate Action
BW.00008816 - Irrespirable atmosphere/ Explosive atmosphere/ Engulfed personnel
CT.00015104 Hard barrier across all Final Panel Seal sites during sealing Niehaus Charles - 6141038_Mc Restricted access did not allow the monitoring activity to take place. Yes * Monitoring not completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground
risk to personnel as no access Underground. Monitoring activities will recommence
reopened. Site LFI has been conducted refer *IN.0022674.
BW.00008736 - Gas \/ Hybrid Explosion
CT.00015171
Cable management plan
CT.00015236
Dilution through ventilation BW.00009537 - Failure of the gas monitoring system
CT.00015739
Priority Critical Control - ERZ-NERZ Boundary Installation Standards - Validate that the assurance process for gas monitoring installations is in place and effective.
CT.00015741
All tubes fitted with self-draining water traps at seal sites; All tubes fitted with end-of-line dust filters
CT.00015743
Priority Critical Control - ERZ-NERZ Boundary Installation Standards - audit of the UG workings for all new or changed installations.
CT.00015744 Priority Critical Control - ERZ-NERZ Boundary Installation Standards - Review the Gas Monitoring quality assurance report completed by the EEM.
AAMC.001.031.0126
CONFIDENTIAL
84 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed Action Required
122 51 51 12 1
PUE Control ID Control Name Control Owner Observation Affect Control * HPH ID Corrective / Immediate Action BW.00009538 - Failure of the methane drainage system CT.00015880 UIS Methane Drainage Infrastructure Niehaus Charles - 6141038_Mc Restricted access did not allow the monitoring activity to take place. Yes * Monitoring not completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground
risk to personnel as no access Underground. Monitoring activities will recommence
reopened. Site LFI has been conducted refer *IN.0022674. BW.00008205 - Spon Comb in sealed goaf CT.00017328 Stowage Management Plan Restricted access did not allow the monitoring activity to take
permits had been completed and inspected by undermanagers and ERZC's prior to pit closure. BW.00037954 - Frictional Ignition CT.00066171 Minimum ventilation quantity
No longwall production activities & access restricted to face since 6th May. CT.00066134 Inspections & maintenance to ensure all picks and pick tips are in place and remain sharp Restricted access did not allow monitoring activity to occur - LW face under control of DNRME (Incident Scene) CT.00066177 Effective water spray deluge
Drives, AFC Raceways, and shield canopies
AAMC.001.031.0127
CONFIDENTIAL
85 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed Action Required
122 51 51 12 1
PUE Control ID Control Name Control Owner Observation Affect Control* HPH ID Corrective / Immediate Action BW.00008921
CT.00017136 Geological Model maintained in compliance with OMS Standards Niehaus Charles - 6141038_Mc Audit completed of MG105 hazard plan 22-41 ct. 1 non conformance found, action raised as appropriate to rectify. Audit Attached. No N/A Refer Audit attached INS.00386667 Full audit of GRO-5313-PRO completed as per attached. Process is being mostly followed however some key areas addressing and clarification moving forward. Actions generated appropriately. Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person
AAMC.001.031.0128
CONFIDENTIAL
86 INTERNAL
GROSVENOR AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2019 Legal Audit Completed Completed Completed AP.00764751 2019 Grosvenor Legal Reviews 0% 2019 Legal Audit Completed Completed Completed AP.00766350 2019 Statutory Compliance Audit 57% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0129
CONFIDENTIAL
INTERNAL
S&H Monthly Report – June 2020
AAMC.001.031.0130
CONFIDENTIAL
88 INTERNAL
MORANBAH NORTH SAFETY OVERVIEW SUMMARY
TRC=5, LTI=2).
AAMC.001.031.0131
CONFIDENTIAL
89 INTERNAL
MORANBAH NORTH HIGH POTENTIAL INCIDENTS
1 1 2 2 1 4 3 6 1 2 3 4 5 6 7
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Moranbah North HPI / HPH Reporting HPI HPH
0.00 1.00 2.00 3.00 4.00 5.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 4.32 0.00 0.00 0.00 0.00 3.90 0.00 3.68 0.00 0.00 0.00 3MMA 0.00 1.46 1.44 1.43 0.00 0.00 1.37 1.34 2.52 1.24 1.23 0.00 12MMA 0.76 0.75 0.74 0.73 0.72 0.71 1.06 0.69 1.04 1.03 1.01 1.00
Moranbah North HPIFR 3MMA v 12MMA
1 1 1 1 1 1 1 2 2 2 21 2 3
Jan Feb Mar Apr May Jun
Moranbah North HPI Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0132
CONFIDENTIAL
90 INTERNAL
MORANBAH NORTH HIGH POTENTIAL HAZARDS
1 5 7 8 9 16 2 4 5 9 12 185 10 15 20
Jan Feb Mar Apr May Jun
Moranbah North HPH Count YTD Comparison
YTD 2019 YTD 2020 0.00 5.00 10.00 15.00 20.00 25.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 8.59 0.00 0.00 4.17 4.07 8.85 7.80 7.58 3.68 14.69 11.26 23.40 3MMA 14.58 13.12 2.88 1.43 2.80 5.62 6.87 8.04 6.31 8.66 9.87 16.35 12MMA 7.99 7.49 6.99 7.26 7.53 7.80 8.15 7.29 6.93 7.87 8.45 8.02Moranbah North HPHFR 3MMA v 12MMA
1 2 3 4 5
Moranbah North SLT Reported HPH's
SLT Reported Non SLT Reported ‘Reported by’ field removed from Enablon upgrade 11/05/2020
AAMC.001.031.0133
CONFIDENTIAL
91 INTERNAL
MORANBAH NORTH TOTAL RECORDABLE CASES
0.00 5.00 10.00 15.00
Jul-19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 8.59 0.00 8.74 0.00 8.14 4.43 3.90 3.79 0.00 3.67 0.00 7.80 3MMA 4.37 2.91 5.77 2.86 5.60 4.22 5.49 4.02 2.52 2.47 1.23 3.77 12MMA 12.18 11.24 11.41 9.80 8.96 9.21 8.50 5.90 4.85 3.76 3.38 4.01Moranbah North TRCFR 3MMA v 12MMA
11.77 23.77 19.19 18.67 15.89 13.41 3.90 3.84 2.52 2.82 2.25 3.155.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Moranbah North TRCFR YTD Comparison
YTD 2019 YTD 2020
9.21 3.90 3.84 2.52 2.82 2.25 3.15 8.290.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Moranbah TRCFR YTD
3 11 14 18 19 19 1 2 2 3 3 55 10 15 20
Jan Feb Mar Apr May Jun
Moranbah North TRC Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0134
CONFIDENTIAL
92 INTERNAL
MORANBAH NORTH LOST TIME INJURIES
2 9 11 15 15 15 1 1 1 1 1 22 4 6 8 10 12 14 16
Jan Feb Mar Apr May Jun
Moranbah North LTI Count YTD Comparison
YTD 2019 YTD 2020
7.85 19.44 15.08 15.56 12.55 10.58 3.90 1.92 1.26 0.94 0.75 1.265.00 10.00 15.00 20.00 25.00
Jan Feb Mar Apr May Jun
Moranbah North LTIFR YTD Comparison
YTD 2019 YTD 2020 0.00 2.00 4.00 6.00 8.00 10.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 4.37 0.00 8.14 4.43 3.90 0.00 0.00 0.00 0.00 3.90 3MMA 0.00 0.00 1.44 1.43 4.20 4.22 5.49 2.68 1.26 0.00 0.00 1.26 12MMA 9.52 8.62 8.46 6.90 6.45 6.73 6.37 3.82 3.12 1.71 1.69 2.01
Moranbah LTIFR 3MMA v 12MMA
6.73 3.90 1.92 1.26 0.94 0.75 1.26 6.060.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Moranbah LTIFR YTD AAMC.001.031.0135
CONFIDENTIAL
93 INTERNAL
MORANBAH NORTH OCCUPATIONAL ILLNESSES
1.06 0.63 0.950.00 0.50 1.00 1.50 2.00 2.50
Moranbah OCILFR YTD
0.00 1.00 2.00 3.00 4.00 5.00
Jul- 19 Aug- 19 Sep- 19 Oct- 19 Nov- 19 Dec- 19 Jan- 20 Feb- 20 Mar- 20 Apr- 20 May- 20 Jun- 20 Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.90 3MMA 2.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.26 12MMA 1.14 1.12 1.10 1.09 1.08 1.06 1.06 0.69 0.69 0.68 0.00 0.33
Moranbah OCILFR 3MMA v 12MMA
2.16 1.37 1.04 2.51 2.12 0.631.00 2.00 3.00
Jan Feb Mar Apr May Jun
Moranbah North OCILFR YTD Comparison
YTD 2019 YTD 2020
1 1 1 3 3 11 2 3 4
Jan Feb Mar Apr May Jun
Moranbah North OCIL Count YTD Comparison
YTD 2019 YTD 2020
AAMC.001.031.0136
CONFIDENTIAL
94 INTERNAL
MORANBAH NORTH OVERDUE TASKS
8 2 1 9 2 4 6 8 10 Jan Feb Mar Apr May Jun Moranbah North Overdue Tasks 1 Jan Feb Mar Apr May Jun Moranbah North Overdue HP Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Moranbah North Overdue Audit Tasks - Real Due Date 1 Jan Feb Mar Apr May Jun Moranbah North Overdue CC Tasks - Real Due Date AAMC.001.031.0137
CONFIDENTIAL
95 INTERNAL
MORANBAH NORTH VFL ANALYSIS
54% 68% 55% 48% 58% 63% 94%20% 40% 60% 80% 100% 120% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020 YTD
Moranbah North SLT VFL % Target
< 75% 75% - 95% > 95%
4% 4% 4% 4% 7% 4% 0% 0% 0% 0% 0% 0%96% 96% 96% 96% 93% 96% 0% 0% 0% 0% 0% 0% 0% 20% 40% 60% 80% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Moranbah %SLT v Non-SLT VFL's
SLT Non-SLT
94% 93% 93% 93% 94% 95% 0% 0% 0% 0% 0% 0%0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Moranbah % Safe v Unsafe VFL's
Safe Unsafe
AAMC.001.031.0138
CONFIDENTIAL
96 INTERNAL
Sign off required: Signature Date Document Control General Manager ____/____/ 2020 Forward to Head of Ops Head of Ops ____/____/ 2020 Forward to Head of S&H Head of S&H ____/____/ 2020 Forward to S&H Officer for filing
MORANBAH NORTH CRITICAL CONTROL DEFICIENCY SIGN OFF
Overview of monitoring this month – June 2020
Deficiencies Identified this month
Total Controls No.Scheduled No.Completed Action Required
237 48 48
Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person
PUE Control ID Control Name Control Owner Observation Affect Control Corrective / Immediate Actions
No deficient controls were identified in June 2020
AAMC.001.031.0139
CONFIDENTIAL
97 INTERNAL
MORANBAH NORTH AUDIT STATUS
Audit Audit Completed Audit Report Drafted for Site review Audit Report reviewed by site and accepted Audit Action Plan developed in Enablon Action Plan Name Audit Action Status
2017 ENV OCA Audit Completed Completed Completed AP.00582513 2017 Moranbah North OCA Action Plan 97% 2018 SHE Way Gap Analysis Gap Analysis completed Not Applicable Not Applicable AP.00695858 SHE Way Gap Analysis 100% 2018 ENV OCA Audit Completed Completed Completed AP.00764085 Environmental OCA 2018 11% 2019 Legal Audit Completed Completed Completed AP.00755988 2019 MNM Compliance Audit Action Plan 44% 2020 SHE Way Self Assessment Not Completed Not Completed Not Completed AAMC.001.031.0140