Menokin Mockup

Progress Report October 2015

slide-2
SLIDE 2

Existing conditions: Northwest corner February 2015

slide-3
SLIDE 3
slide-4
SLIDE 4

Existing conditions: Inside north wall @ NW corner February 2015

slide-5
SLIDE 5

Research: Replacement stone

slide-6
SLIDE 6

Research: Cintec anchors

slide-7
SLIDE 7

Rubble pile relocation Partially complete June 2015

slide-8
SLIDE 8

Samples: Mortar samples June 2015

slide-9
SLIDE 9

Research Stone inventory by summer interns June-July 2015

slide-10
SLIDE 10

Research: Stone Inventory -Stones placed on scrims July 2015

slide-11
SLIDE 11

Research: Measured drawings

slide-12
SLIDE 12

Research: Displaced stones June 2015

slide-13
SLIDE 13

Research: Displaced basement window jamb stones

slide-14
SLIDE 14

Documentation: Corner reference points September 2015

slide-15
SLIDE 15

Documentation: Corner reference points September 2015

SW NE NW

slide-16
SLIDE 16

Documentation: Corner reference points September 2015

slide-17
SLIDE 17

Northwest corner February 2015

slide-18
SLIDE 18

West wall at SW corner September 2015

slide-19
SLIDE 19

Archaeology: by DATA Investigations June-July 2015

slide-20
SLIDE 20

Documentation: Painted stones

slide-21
SLIDE 21

Archaeology: Ground profile at north wall September 2015

slide-22
SLIDE 22

Removed parging inside north wall August 2015

slide-23
SLIDE 23

Repair: Products & equipment

slide-24
SLIDE 24

Grouting: Seal openings & flush out August 2015

slide-25
SLIDE 25

Grouting: Filled tubes

slide-26
SLIDE 26

Cintec anchor hole locations September 2015

slide-27
SLIDE 27

Plywood excavation protection September 2015

slide-28
SLIDE 28

Stone repair: Projecting stone markings September 2015

slide-29
SLIDE 29

Stone repair: Drawing planning frame September 2015

slide-30
SLIDE 30

Documentation: Below grade measured drawings

slide-31
SLIDE 31

Stone repair: Removing displaced ashlar stones September 2015

slide-32
SLIDE 32

Stacco treatment: Sound testing stucco September 2015

slide-33
SLIDE 33

Stacco treatment: Tools September 2015

slide-34
SLIDE 34

Staccotest: Removed stucco September 2015

slide-35
SLIDE 35

Stacco test: Reinstalled stucco & limewash September 2015

slide-36
SLIDE 36

Masonry repair: Removed loose internal material September 2015

slide-37
SLIDE 37

Masonry repair: Removed loose internal material September 2015

slide-38
SLIDE 38

Masonry repair: NW corner stones September 2015

slide-39
SLIDE 39

Masonry repair: Pinning & epoxy September 2015

slide-40
SLIDE 40

Masonry repair: Pinning & epoxy September 2015

slide-41
SLIDE 41

Masonry repair: Cramp sample

slide-42
SLIDE 42

Stone repair: Methodology October 2015

slide-43
SLIDE 43

Masonry surveys: CCTV flues & IRT, GPR, & Metal Detection

slide-44
SLIDE 44

Masonry repair: Bird’s beak pointing sample

slide-45
SLIDE 45

Masonry repair: Core drilling rig

slide-46
SLIDE 46

Masonry repair: Reset basement window jamb stones

slide-47
SLIDE 47

Masonry repair: Masonry bees