MART IN L UT HE R KING JR. BOUL E VARD E XT E NSION E - - PowerPoint PPT Presentation

mart in l ut he r king jr boul e vard e xt e nsion e
SMART_READER_LITE
LIVE PREVIEW

MART IN L UT HE R KING JR. BOUL E VARD E XT E NSION E - - PowerPoint PPT Presentation

MART IN L UT HE R KING JR. BOUL E VARD E XT E NSION E NVIRONME NT AL ASSE SSME NT (E A) AND RE E VAL UAT ION PUBL IC ME E T ING JUL Y 25, 2017 Pr e se ntation Ove r vie w Pro je c t Ove rvie w Pro je c t De sc


slide-1
SLIDE 1

MART IN L UT HE R KING JR. BOUL E VARD E XT E NSION E NVIRONME NT AL ASSE SSME NT (E A) AND RE E VAL UAT ION PUBL IC ME E T ING JUL Y 25, 2017

slide-2
SLIDE 2

Pr e se ntation Ove r vie w

Pro je c t Ove rvie w Pro je c t De sc riptio n K e y T e c hnic a l T

  • pic s

Pro je c t Sc he dule Que stio ns a nd Answe rs

slide-3
SLIDE 3

ML K E XT E NSION - PROJE CT OVE RVIE W Pr

  • je c t Histor

y

  • Sta ple to n Re de ve lo pme nt Pla n a nd Ne w

De ve lo pme nt

  • ML

K E nviro nme nta l Asse ssme nt (E A) 2011

  • Pro je c t F

unding I de ntifie d – E A Re e va lua tio n 2015 - 2017

  • Pub lic Me e ting Ma rc h 2016
  • E

A Re e va lua tio n sig ne d b y CDOT / F HWA June 2017

  • F

inding o f No Sig nific a nt I mpa c t (F ONSI ) pe nding

slide-4
SLIDE 4

PURPOSE AND NE E D

Pur pose

  • T
  • impro ve a n e a st-we st a rte ria l c o nne c tio n

b e twe e n Ha va na Stre e t a nd Pe o ria Stre e t.

Ne e ds

  • Addre ss future e xpe c te d tra ffic c o ng e stio n
  • I

mpro ve tra ve l e ffic ie nc y b y re duc ing o ut-o f- dire c tio n tra ve l

  • Pro vide lo c a l a c c e ss to e xisting a nd pla nne d

re side nc e s, b usine ss, sc ho o ls a nd pa rks.

slide-5
SLIDE 5

PROJE CT DE SCRIPT ION

slide-6
SLIDE 6

L ANDSCAPE PL AN

slide-7
SLIDE 7

L andsc aping Conc e pts

slide-8
SLIDE 8

ST ORMWAT E R POND, PIPE L INE AND OUT F AL L ST RUCT URE

Sto rm Wa te r Po nd Pipe line Outfa ll to Sa nd Cre e k

slide-9
SLIDE 9

E NVIRONME NT AL F INDINGS AND MIT IGAT ION

Noise

Constr uc tion Noise

  • De nve r no ise o rdina nc e to b e fo llo we d

Ope r ational (Motor Ve hic le ) Noise

  • F

HWA No ise E va lua tio n c o mple te d June 2017

  • No ise Wa ll Vo te

L a te June to July 18, 2017

  • No ise Wa ll Mo c k Up Me e ting

July 5, 2017

slide-10
SLIDE 10

E NVIRONME NT AL F INDINGS AND MIT IGAT ION – NOISE , CONT ’D

Be ne fite d Re c e ptor Noise Wall Vote

  • T

hr e e Noise Se nsitive Ar e as (NSA) 3, 4 and 6

  • Se par

ate noise wall vote s, the r e for e thr e e possible noise walls

  • Voting by ‘be ne fitte d r

e c e ptor s’ late June thr

  • ugh July 18th

Voting r e sults:

NSA 3 40 (73% ) No

(71% o f po ssib le vo te s)

15 (27% ) Ye s NSA 4 34 (87% ) No

(75% o f po ssib le vo te s)

5 (13% ) Ye s NSA 6 10 (53% ) No

(63% o f po ssib le vo te s)

9 (47% ) Ye s

slide-11
SLIDE 11

E NVIRONME NT AL F INDINGS AND MIT IGAT ION, CONT

’D

Air Quality

  • Ana lysis o f CO, PM10 Ozo ne , MSAT

s a nd GHG

  • Me e ts Re g io na l Air Qua lity Co nfo rmity Re q uire me nts
  • Mitig a tio n During Co nstruc tio n

Wate r Quality/ Wate r Re sour c e s/ We tlands

  • Wa te r Qua lity T

re a tme nt I nc lude d

  • No we tla nd impa c ts
  • USCOE

Se c tio n 404 Pe rmit fo r Sa nd Cre e k Outfa ll

slide-12
SLIDE 12

E NVIRONME NT AL F INDINGS AND MIT IGAT ION, CONT ’D

Biologic al Re sour c e s

Ve g e ta tio n a nd We e ds

  • No xio us we e d ma na g e me nt pla n re q ’ d.

Ra pto rs a nd Mig ra to ry Birds

  • Mo nito r fo r ne sts prio r to c o nstruc tio n
  • I

f a c tive ne sts, c o nsult with CPW, USF WS to a vo id o r minimize impa c ts Pra irie Do g s

  • Ba rrie r a lo ng Bluff L

a ke pro pe rty

  • CDOT

2009 Po lic y a pplie s

slide-13
SLIDE 13

E NVIRONME NT AL F INDINGS AND MIT IGAT ION, CONT ’D

Ar c hae ologic al and Histor ic Re sour c e s

  • No “E

lig ib le ” Re so urc e s fo r Na t. Histo ric Re g iste r

  • “No Histo ric Pro pe rtie s Affe c te d”

Soc ioe c onomic s/ L and Use / E nvir

  • nme ntal Justic e
  • ML

K E xte nsio n is c o nsiste nt with a do pte d la nd use pla ns

  • No Dispro po rtio na te ly Hig h o r Adve rse E

ffe c ts to E nviro nme nta l Justic e po pula tio ns (lo w inc o me , mino rity)

slide-14
SLIDE 14

E NVIRONME NT AL F INDINGS AND MIT IGAT ION, CONT ’D

Right- of- Way

  • Mo line to Pe o ria Rig ht-o f-Wa y a c q uire d

T r anspor tation

  • Co nsiste nt with DRCOG 2040 Re g io na l

T ra nspo rta tio n Pla n (RT P)

  • L
  • c a l ro a dwa y ne two rk b e ne fits
slide-15
SLIDE 15

E NVIRONME NT AL F INDINGS AND MIT IGAT ION, CONT ’D

Re c r e ation Re sour c e s/ Se c tion 4(f)

  • T

e mpo ra ry de to ur o f Sa nd Cre e k T ra il

  • I

mpro ve d ne w tra il

Visual Quality

  • I

mpa c ts to o pe n spa c e vie ws

  • Co nsiste nt with Sta ple to n Co mmunity Pla ns
  • Ne w la ndsc a ping pro vide s b uffe r

Hazar dous Mate r ials

  • Hig h L

ine Ca na l/ Sta ple to n runwa y re me dia tio n is unde rwa y so uth o f ML K pro je c t

  • No o the r ha za rds ide ntifie d
slide-16
SLIDE 16

ML K E XT E NSION - NE XT ST E PS MIL E ST ONE T IME F RAME Public Me e ting July 25, 2017

Pub lic I nput Addre sse d July 26 – la te Se pt. F ONSI Sig ne d b y CDOT / F HWA* Se pt. 2017 F ina l De sig n a nd Bid Pro c e sse s Se pt. – De c . 2017 Co nstruc tio n Be g ins E a rly 2018 Co nstruc tio n Co mple te d/ ML K E xte nsio n Ope ns L a te 2018 * Assume s F ONSI

slide-17
SLIDE 17

QUE ST IONS & COMME NT S