City Council Presentation September 11, 2017 MARLBOROUGH ELEMENTARY Marlborough School Building Committee Owners Project Manager: PROJECT TEAM Lamoureux Pagano Associates Architect: Massachusetts School Building Authority FEASIBILITY


slide-1
SLIDE 1

MARLBOROUGH ELEMENTARY

City Council Presentation September 11, 2017

slide-2
SLIDE 2

Marlborough School Building Committee Massachusetts School Building Authority Lamoureux Pagano Associates Owner’s Project Manager: Architect:

PROJECT TEAM

slide-3
SLIDE 3

FEASIBILITY STUDY OVERVIEW PRELIMINARY DESIGN PROGRAM

  • Existing Conditions
  • Alternate Sites

PREFERRED SCHEMATIC REPORT

  • Preferred Solution

AGENDA

slide-4
SLIDE 4

PRELIMINARY PROJECT SCHEDULE

slide-5
SLIDE 5

PROJECT MILESTONES

MARCH 2017 MARCH 2017 MSBA FS/SD KICK-OFF MEETING JUNE 14 JUNE 14th

th, 2017

, 2017 PRELIMINARY DESIGN PROGRAM (PDP) SUBMITTED TO MSBA MARCH 2015 MARCH 2015 MARLBOROUGH SUBMITS STATEMENT OF INTEREST TO MSBA JANUAR JANUARY 2016 Y 2016 MSBA BOARD OF DIRECTORS APPROVES MARLBORUGH’S STATEMENT OF INTEREST MARCH 2016 MARCH 2016 MARLBOROUGH CITY COUNCIL APPROVES $1 MILLION FOR FEASIBILITY STUDY/ SCHEMATIC DESIGN SEPTEMBER 14 SEPTEMBER 14th

th, 2017

, 2017 PREF PREFFERED SCHEMATIC REPORT (PSR) SUBMITTED TO MSBA OCTOBER OCTOBER 31 31ST

ST, 2017

, 2017 MSBA BOARD OF DIRECTORS VOTE TO APPROVE PSR & AUTHORIZE SCHEMATIC DESIGN (SD) PHASE JANUAR JANUARY 2018 Y 2018 SD PACKAGE SUBMITTED TO MSBA SPRI SPRING NG 2018 2018 MSBA BOARD OF DIRECTORS VOTE TO APPROVE PROJECT SCOPE & BUDGET SPRI SPRING NG 2018 2018 MARLBOROUGH CITY COUNCIL VOTES TO FUND PROJECT

MSBA Board Approval School Building Committee Vote

slide-6
SLIDE 6

PROJECT GOALS

OBJECTIVES: OBJECTIVES:

  • RELIEVE OVERCROWDING AT

RELIEVE OVERCROWDING AT RICHER EL RICHER ELEMENTARY SCHOOL & ELEMENTARY LEVEL EMENTARY SCHOOL & ELEMENTARY LEVEL

  • PLACE 5

PLACE 5TH

TH GRADE BACK AT

GRADE BACK AT ELEMENTARY LEVEL IN ELEMENTARY LEVEL IN LINE WITH DISTRICT’S PROGRAM LINE WITH DISTRICT’S PROGRAM

  • BUILD A

BUILD A SCHOOL THAT WILL LAST FOR 50 PLUS YEARS SCHOOL THAT WILL LAST FOR 50 PLUS YEARS

slide-7
SLIDE 7

K-4 675 STUDENTS 3 SCHOOLS K-5 610 STUDENTS 4 SCHOOLS K-5 1060 STUDENTS 3 SCHOOLS

RICHER KANE JAWOREK KANE JAWOREK RICHER RICHER NEW 4TH SCHOOL

  • Existing Richer Site
  • Existing Richer Site
  • New Site
  • Repurpose Whitcomb

5th Grade Space

  • Repurpose Whitcomb

5th Grade Space

FEASIBILITY STUDY OPTIONS

Existing Proposed LEGEND

slide-8
SLIDE 8

LEGEND

SITE BOUNDARY WETLANDS 100’/200’ RIVERFRONT SETBACK 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS PONDS/LAKES STREAMS

RICHER ELEM. – EXISTING COND.

K-4 (551 STUDENTS) 69,312 GSF 1965

slide-9
SLIDE 9

RICHER ELEM. – EXISTING COND.

slide-10
SLIDE 10

ALTERNATIVE SITES

MARLBOROUGH HIGH SCHOOL CHARLES JAWOREK ELEMENTARY SCHOOL WHITCOMB MIDDLE SCHOOL FRANCIS KANE ELEMENTARY SCHOOL RAYMOND C. RICHER ELEMENTARY SCHOOL EARLY CHILDHOOD CENTER

PROPERTY CONFIGURATION TOPOGRAPHY SITE ACCESS ACQUISITION UTILITY AVAILABILITY ENVIRONMENTAL RESOURCES SOILS & GEOLOGIC FACTORS PROPERTY LIMITATIONS EXISTING DEVELOPMENT

slide-11
SLIDE 11

TRANSMISSION LINE EASEMENT

SITE PROPERTIES

ACREAGE: 24 ACRES

401 ELM STREET

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-12
SLIDE 12

SITE PROPERTIES

ACREAGE: 18.35 ACRES

43 SPRING STREET

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-13
SLIDE 13

HILDRETH SCHOOL

SITE PROPERTIES

ACREAGE: 7.6 ACRES

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-14
SLIDE 14

MARLBOROUGH AIRPORT

SITE PROPERTIES

ACREAGE: 18.43 ACRES

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-15
SLIDE 15

SOUTH ST. – RAWCHUCK - (610 K-5)

SITE PROPERTIES

ACREAGE: 80 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130 25% 25% 17% 29% 29% 17%

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-16
SLIDE 16

SOUTH ST. – RAWCHUCK - (610 K-5)

SITE PROPERTIES

ACREAGE: 80 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130 530 500 430 430 390 400 470 440

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-17
SLIDE 17

POWER SUBSTATION TRANSMISSION LINE EASEMENT

SOUTH STREET LOTS – (610 K-5)

SITE PROPERTIES

ACREAGE: 15.71 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-18
SLIDE 18

POWER SUBSTATION TRANSMISSION LINE EASEMENT

SOUTH STREET LOTS – (610 K-5)

SITE PROPERTIES

ACREAGE: 15.71 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK NOT PRIMED FARMLAND ALL AREAS ARE PRIME FARMLAND FARMLAND OF STATEWIDE IMPORTANCE FARMLAND CLASSIFICATION

slide-19
SLIDE 19

POWER SUBSTATION TRANSMISSION LINE EASEMENT

SOUTH STREET LOTS – (610 K-5)

SITE PROPERTIES

ACREAGE: 15.71 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-20
SLIDE 20

BROADMEADOW STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 12.6 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-21
SLIDE 21

BROADMEADOW STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 12.6 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK NOT PRIMED FARMLAND ALL AREAS ARE PRIME FARMLAND FARMLAND OF STATEWIDE IMPORTANCE FARMLAND CLASSIFICATION

slide-22
SLIDE 22

BROADMEADOW STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 12.6 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-23
SLIDE 23

146 WILLIAMS STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 9.42 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-24
SLIDE 24

146 WILLIAMS STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 9.42 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130 NOT PRIMED FARMLAND ALL AREAS ARE PRIME FARMLAND FARMLAND OF STATEWIDE IMPORTANCE FARMLAND CLASSIFICATION

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-25
SLIDE 25

146 WILLIAMS STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 9.42 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-26
SLIDE 26

397 WILLIAMS STREET – (610 K-5)

SITE PROPERTIES

ACREAGE: 18.82 ACRES EXISTING BLDG: 2 STORIES 130,000 SF

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-27
SLIDE 27

HIGH SCHOOL FIELDS – (610 K-5)

SITE PROPERTIES

ACREAGE: 28.7 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-28
SLIDE 28

HIGH SCHOOL FIELDS – (610 K-5)

SITE PROPERTIES

ACREAGE: 28.7 ACRES PROPOSED STORIES: 2 PROPOSED PARKING: 130

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS 100/200’ RIVERFRONT SETBACK

slide-29
SLIDE 29

SITE EVALUATION CRITERIA

SOILS & GEOLOGIC FACTORS PROPERTY CONFIGURATION, SIZE, BUILDABLE AREA ENVIRONMENTAL RESOURCES & HYDROLOGY TOPOGRAPHY UTILITY AVAILABILITY

CRITERIA

4.0 3.0 3.0 4.0 5.0 3.0 3.0 3.0 4.0 5.0 4.0 5.0 2.0 0.0 5.0 3.0 5.0 3.0 2.0 5.0 N/A N/A N/A N/A N/A

ACCESS POTENTIAL-TRAFFIC PEDESTRIAN & VEHICULAR

2.0 4.0 5.0 3.0 N/A

EXISTING DEVELOPMENT, BUILDING & SITE

3.0 4.0 2.0 5.0 N/A

EASEMENTS & OTHER PROPERTY LIMITATIONS

3.0 4.0 4.0 4.0 N/A

ACQUISITION COST

3.0 5.0 2.0 2.0 N/A

TOTAL

SITES NO LONGER IN CONSIDERATION

  • 401 Elm Street
  • 43 Spring Street
  • Hildreth School
  • Marlborough

Airport

  • South Street:

Rawchuck

RANKING

3 1 4 2 Not Rated 30.0 35.0 29.0 32.0 N/A

slide-30
SLIDE 30

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS

OPTION 9.1 NEW CONSTRUCTION

slide-31
SLIDE 31

LEGEND

SITE BOUNDARY WETLANDS PONDS/LAKES 20’ NO BUILD AROUND WETLANDS EASEMENTS 100’ BUFFER AROUND WETLANDS STREAMS K-5 (610 STUDENTS)

OPTION 9.1 NEW CONSTRUCTION

28.7 HIGHLIGHTED ACRES 9.3 BUILDABLE ACRES STEEP TOPOGRAPHY

slide-32
SLIDE 32

LEGEND

MAIN ENTRANCE BUS DROP-OFF/PICK- UP CIRCULATION SPECIAL EDUCATION BUS DROP-OFF/PICK- UP CIRCULATION BUILDING ENTRANCE PARENT DROP-OFF/ PICK-UP CIRCULATION

OPTION 9.1 NEW CONSTRUCTION

90 STAFF PARKING SPOTS 40 VISITOR PARKING SPOTS 10 BUSES 5 MINI-BUSES 43-61 PARENT DROP-OFF /PICK-UP

slide-33
SLIDE 33

LEGEND

MAIN ENTRANCE BUS DROP-OFF/PICK- UP CIRCULATION SPECIAL EDUCATION BUS DROP-OFF/PICK- UP CIRCULATION BUILDING ENTRANCE PARENT DROP-OFF/ PICK-UP CIRCULATION

OPTION 9.1 NEW CONSTRUCTION

90 STAFF PARKING SPOTS 40 VISITOR PARKING SPOTS 10 BUSES 5 MINI-BUSES 43-61 PARENT DROP-OFF /PICK-UP

slide-34
SLIDE 34

LEGEND

MAIN ENTRANCE BUS DROP-OFF/PICK- UP CIRCULATION SPECIAL EDUCATION BUS DROP-OFF/PICK- UP CIRCULATION BUILDING ENTRANCE PARENT DROP-OFF/ PICK-UP CIRCULATION

OPTION 9.1 NEW CONSTRUCTION

90 STAFF PARKING SPOTS 40 VISITOR PARKING SPOTS 10 BUSES 5 MINI-BUSES 43-61 PARENT DROP-OFF /PICK-UP

slide-35
SLIDE 35

OPTION 9.1 NEW CONSTRUCTION

K 1 2

GYM CAFETORIUM

slide-36
SLIDE 36

OPTION 9.1 NEW CONSTRUCTION

4 3

5

MEDIA

slide-37
SLIDE 37

OPTION 9.1 NEW CONSTRUCTION K-5 (610 Students)

  • New 109,000 GSF construction
  • 24 month New construction
  • Construction budget: $55,800,000
  • Project budget: $67,500,000
slide-38
SLIDE 38

PSR OPTIONS SUMMARY

OPTION K-4 (551 STUDENTS)

PSR OPTIONS SUMMARY

K-4 (675 STUDENTS) K-4 (675 STUDENTS) K-5 (610 STUDENTS) BASE REPAIR RENOVATION / ADDITION NEW CONSTRUCTION - RICHER NEW CONSTRUCTION – POIRIER STREET SITE CATEGORY GROSS AREA (GSF) TOTAL CONSTRUCTION BUDGET (IN MILLIONS $) TOTAL PROJECT BUDGET (IN MILLIONS $) 69,312 $22.4 $27.1 105,414 $45.9 $55.5 116,591 $59.8 $72.4 108,730 $55.8 $67.5

slide-39
SLIDE 39

PSR OPTIONS SUMMARY

PROGRAM FULFILLMENT

EVALUATION CATEGORY

CONSTRUCTION IMPACT CONSTRUCTION DURATION EFFICIENCY COST

PSR OPTIONS SUMMARY

POSITIVE NEGATIVE

OTHER

NEUTRAL

BASE REPAIR RENOVATION / ADDITION NEW CONSTRUCTION ON EXISTING SITE NEW CONSTRUCTION ON HIGH SCHOOL SITE

K-4 (551 Students) K-4 (675 Students) K-4 (675 Students) K-5 (610 Students)

slide-40
SLIDE 40

MARLBOROUGH ELEMENTARY

City Council Presentation September 11, 2017