Malletts Bay Sewer Project May 15, 2018 www.colchestervt.gov - - PowerPoint PPT Presentation

malletts bay sewer project
SMART_READER_LITE
LIVE PREVIEW

Malletts Bay Sewer Project May 15, 2018 www.colchestervt.gov - - PowerPoint PPT Presentation

Malletts Bay Sewer Project May 15, 2018 www.colchestervt.gov Introductory Comments Tonight's presentation is a condensed and refined version of what was presented to the Colchester Select Board on March 27, 2018. The Select Board


slide-1
SLIDE 1

Malletts Bay Sewer Project

May 15, 2018

www.colchestervt.gov

slide-2
SLIDE 2

Introductory Comments

2

www.colchestervt.gov

 Tonight's presentation is a condensed and refined version

  • f what was presented to the Colchester Select Board on

March 27, 2018.  The Select Board reviewed multiple project scenarios and identified a preferred approach. To further refine the

  • verall project scope, it is necessary to determine whether

the Colchester School District will connect their Blakely Road facilities.  All financial and cost analysis are based on preliminary planning level information for purposes of determining

  • verall project viability. Specific project costs and user fees

may vary.

slide-3
SLIDE 3

Why Sewers in Malletts Bay

3

www.colchestervt.gov

 An integral part of the Town’s planning for decades

  • Town Master Plan
  • Heritage Plan
  • Malletts Bay Initiative
  • Wastewater Master Plan
  • Integrated Water Resources Management Plan

 State Plans and Actions

  • Northern Lake Champlain Tactical Basin Plan
  • Project determination by Watershed Management Division

 Goals and Objectives

  • Improve and protect water quality in Malletts Bay
  • Address old and failing septic systems
  • Reduce bacteria levels in Malletts Bay
  • Increase enjoyment of Malletts Bay
slide-4
SLIDE 4

Project History

 2007 - CFD#2 begins Malletts Bay Sewer Project.  2013 - Town completes IWRM study. Documents points of pollution and need for sewers in Malletts Bay.  2015 - Town enters into MOU with CFD#2 for Project Management services.  2017 - CFD#2 elects to abandon project based on growing cost estimates and increasing uncertainties relating to the Burlington treatment option.  2017 - Selectboard directs staff to evaluate alternative design approaches and viability of a Town owned project.

4

www.colchestervt.gov

slide-5
SLIDE 5

Proposed Service Area

5

www.colchestervt.gov

slide-6
SLIDE 6

6

www.colchestervt.gov

Malletts Bay BWTF WWTF SBWTF

Wastewater Treatment City of South Burlington

slide-7
SLIDE 7

7

www.colchestervt.gov

Blakely Road Alignment

slide-8
SLIDE 8

School Connections

Approximately $900,000 Funded by Project

8

www.colchestervt.gov

slide-9
SLIDE 9

 Clean Water State Revolving Loan Fund

  • 2% loan over 30 years
  • $500,000 in Loan subsidy

 Pollution Control Grant, (PCG)

  • Approximately 28% of total project costs.

 Local Option Tax Funds

  • Current LOT Funds
  • Future LOT Funds

 User Fees for Debt and O&M

9

www.colchestervt.gov

Preliminary Estimated Project Costs and Available Project Funding Sources.

Project Costs: $14,583,900

slide-10
SLIDE 10

Local Option Taxes

 With voter approval, the Town can use Local Option Taxes to assist in the funding of debt related to capital improvement projects.  Currently the Town collects approximately $1.3 million per year in Local Option Taxes.

10

www.colchestervt.gov

slide-11
SLIDE 11

11

www.colchestervt.gov  Sewer service laterals are projected to cost $1.7 million.  If funded through the CWSRF, the Town must

  • wn and operate the

laterals.  Ownership places a significant and unusual burden on the utility.  It is unreasonable to place the responsibility for funding and construction

  • f the laterals on individual

property owners.  With voter approval, use $1.7 million in LOT funds to construct service laterals.

Service Laterals

slide-12
SLIDE 12

Projected Debt Costs

(Single Family Home)

12

www.colchestervt.gov

$0 $200 $400 $600 $800 With LOT W/O LOT Annual LOT Contributions

  • f $165,000 for 30 years.
slide-13
SLIDE 13

13

www.colchestervt.gov

Project Loan

Total Project Estimate $14,583,900 Service Laterals ($1,700,000) CWSRF Loan subsidy ($500,000) PCG Funding ($3,607,492) Total Loan amount $8,776,408

Debt Fee Calculations

Debt Fee

Annual Loan Payment $391,866 Funded by LOT ($165,000) Funded by Users $226,866 Initial Year Flows 115,920 GPD

Projected Annual Debt Fees

$226,866/115,920 gals. = $1.96/gal. Note: 115,920 gpd is based on State EPR’s design criteria.

slide-14
SLIDE 14

14

www.colchestervt.gov

Projected Annual User Fees

System Annual O&M Budget Total Annual Sewer Flows O&M Rate

Integrated System (Fixed & Variable Costs) $1,314,267 130,081,396 $0.0101/gal.

User Fee Calculations $1,314,267/130,081,396 Gals. = $0.0101/Gal.

Note: Water consumption used for rate calculation

slide-15
SLIDE 15

Colchester School District

Estimated Total Annual Costs

15

www.colchestervt.gov

  • Initial Connection Costs:

$0

  • Annual User Costs: 2,345,855 Gals. X $0.0101/Gal. =

$23,693

  • Annual Debt Costs: 35,724 GPD x $1.96/Gal. =

$70,019

  • Total Estimated Annual Costs:

$93,712

Notes: User Costs based upon annual water consumption provided by School District Debt Costs based on State EPR design criteria

slide-16
SLIDE 16

Next Steps

16

www.colchestervt.gov

  • School Board decision to be included in the project:

6/24/18

  • Select Board decision to proceed or abandon:

7/24/18

slide-17
SLIDE 17

Thank You!

www.colchestervt.gov