main roads wa goldfields esperance region
play

Main Roads WA Goldfields Esperance Region Shane Power - April - PowerPoint PPT Presentation

Main Roads WA Goldfields Esperance Region Shane Power - April 2019 Regional Overview 2491kms of Road Network Sealed and Unsealed. Rural Network Contractor for Maintenance DM Roads. Annual Maintenance Budget of


  1. Main Roads WA Goldfields Esperance Region Shane Power - April 2019

  2. Regional Overview • 2491km’s of Road Network – Sealed and Unsealed. • Rural Network Contractor for Maintenance – DM Roads. • Annual Maintenance Budget of $40M • Annual Road Safety Budget of $8M

  3. Regional Map and Assets

  4. Regional Issues • Aging Road Network • Quality and Access to Road Building Materials • Environmental Conditions Climate/Rainfall/Salinity • Remoteness /No Circuits or Loops • Increasing Heavy Vehicle Traffic/Loading

  5. Regional Traffic Volumes • 15 Permanent Count Sites – Including 1 in the Kalgoorlie CBD • Increase in Heavy Vehicle Percentages • All Data Available on MRWA Website – Traffic Map

  6. 2019/20 Maintenance Works

  7. • 260km of Reseal (11% Network Length) • Annual Pavement Repairs, Shoulder Grading, Edge Repair and Culvert Replacement Program • Non Structural Bridge Maintenance – Cane Grass, Beasley, Skull and Jones Creek • Vegetation Management Slashing/ Spraying • Routine Maintenance

  8. 2019/20 Minor Capital Works

  9. Goldfields Highway – Gwalia Reconstruction Project • Area of Reoccurring Pavement Failure • Road Reconstruction Widening and Pavement Overlay – 5km’s • Drainage and Floodway Improvements • South of Leonora

  10. South Coast Highway – Stokes Pavement Rehabilitation Project 380 -390 Slk (east of Munglinup) • Formation/Seal Widening and Pavement Overlay • Drainage Improvements • Clearing of Native Vegetation/ Dieback Management

  11. Coolgardie Esperance Highway – Passing Lanes Projects

  12. South Coast Highway – Neds Corner Intersection Improvement Project • Realignment of Neds Corner Road • Improved Level of Road Safety • Increased Sight Distances • 20kms East of Munglingup

  13. Goldfields Highway – Heavy Vehicle Parking Bay • Potential Locations • LG/ Industry Engagement • Increased Heavy Vehicle Safety

  14. 2019/20 Major Capital Works

  15. Great Eastern Highway – Anzac to Gatacre Duplication Project Aboriginal Heritage Claim Area

  16. Coolgardie Esperance Highway – Emu Rocks South Project Poor Geometry – Reverse Curve

  17. Great Central Road – Outback Way Project

  18. Future Planning

  19. Goldfields Highway – Wiluna to Meekatharra Sealing Project

  20. Great Eastern Highway – Ghooli Project

  21. South Coast Highway – Dalyup Bridge Replacement Project • Bridge Replacement due to Load Restrictions • Acceleration Lane Construction • Environmental Constraints to Consider • 30km’s West of Esperance

  22. Coolgardie Esperance Highway – Scadden to Gibson Overlay Project • Rapid Pavement Failure • Geotechnical Investigation • Treatment Options being Considered • Survey and Visual Inspections

  23. Coolgardie Esperance Highway – Esperance Port Access Stage 2 Project • Road Safety Audit – Pink Lake Road • Industrial Park Chadwick / West • Rural Development to the North • South Coast Realignment Removed from Esperance TPS

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend