Main Roads WA Goldfields Esperance Region Shane Power - April 2019 Regional Overview 2491kms of Road Network Sealed and Unsealed. Rural Network Contractor for Maintenance DM Roads. Annual Maintenance Budget of


slide-1
SLIDE 1

Main Roads WA Goldfields Esperance Region

Shane Power - April 2019

slide-2
SLIDE 2

Regional Overview

  • 2491km’s of Road Network

– Sealed and Unsealed.

  • Rural Network Contractor

for Maintenance – DM Roads.

  • Annual Maintenance Budget
  • f $40M
  • Annual Road Safety Budget
  • f $8M
slide-3
SLIDE 3

Regional Map and Assets

slide-4
SLIDE 4

Regional Issues

  • Aging Road Network
  • Quality and Access to Road

Building Materials

  • Environmental Conditions

Climate/Rainfall/Salinity

  • Remoteness /No Circuits or

Loops

  • Increasing Heavy Vehicle

Traffic/Loading

slide-5
SLIDE 5

Regional Traffic Volumes

  • 15 Permanent Count

Sites – Including 1 in the Kalgoorlie CBD

  • Increase in Heavy

Vehicle Percentages

  • All Data Available on

MRWA Website – Traffic Map

slide-6
SLIDE 6

2019/20 Maintenance Works

slide-7
SLIDE 7
  • 260km of Reseal (11% Network

Length)

  • Annual Pavement Repairs,

Shoulder Grading, Edge Repair and Culvert Replacement Program

  • Non Structural Bridge

Maintenance – Cane Grass, Beasley, Skull and Jones Creek

  • Vegetation Management Slashing/

Spraying

  • Routine Maintenance
slide-8
SLIDE 8

2019/20 Minor Capital Works

slide-9
SLIDE 9

Goldfields Highway – Gwalia Reconstruction Project

  • Area of Reoccurring

Pavement Failure

  • Road Reconstruction

Widening and Pavement Overlay – 5km’s

  • Drainage and

Floodway Improvements

  • South of Leonora
slide-10
SLIDE 10

South Coast Highway – Stokes Pavement Rehabilitation Project 380 -390 Slk (east of Munglinup)

  • Formation/Seal

Widening and Pavement Overlay

  • Drainage

Improvements

  • Clearing of Native

Vegetation/ Dieback Management

slide-11
SLIDE 11

Coolgardie Esperance Highway – Passing Lanes Projects

slide-12
SLIDE 12

South Coast Highway – Neds Corner Intersection Improvement Project

  • Realignment of

Neds Corner Road

  • Improved Level of

Road Safety

  • Increased Sight

Distances

  • 20kms East of

Munglingup

slide-13
SLIDE 13

Goldfields Highway – Heavy Vehicle Parking Bay

  • Potential Locations
  • LG/ Industry

Engagement

  • Increased Heavy

Vehicle Safety

slide-14
SLIDE 14

2019/20 Major Capital Works

slide-15
SLIDE 15

Great Eastern Highway – Anzac to Gatacre Duplication Project

Aboriginal Heritage Claim Area

slide-16
SLIDE 16

Coolgardie Esperance Highway – Emu Rocks South Project

Poor Geometry – Reverse Curve

slide-17
SLIDE 17

Great Central Road – Outback Way Project

slide-18
SLIDE 18

Future Planning

slide-19
SLIDE 19

Goldfields Highway – Wiluna to Meekatharra Sealing Project

slide-20
SLIDE 20

Great Eastern Highway – Ghooli Project

slide-21
SLIDE 21

South Coast Highway – Dalyup Bridge Replacement Project

  • Bridge Replacement

due to Load Restrictions

  • Acceleration Lane

Construction

  • Environmental

Constraints to Consider

  • 30km’s West of

Esperance

slide-22
SLIDE 22

Coolgardie Esperance Highway – Scadden to Gibson Overlay Project

  • Rapid Pavement

Failure

  • Geotechnical

Investigation

  • Treatment Options

being Considered

  • Survey and Visual

Inspections

slide-23
SLIDE 23

Coolgardie Esperance Highway – Esperance Port Access Stage 2 Project

  • Road Safety Audit – Pink

Lake Road

  • Industrial Park Chadwick /

West

  • Rural Development to the

North

  • South Coast Realignment

Removed from Esperance TPS